AD 59-16-02

final rule

LOCKHEED Models 18, PV-1 and B-34 Series Aircraft

AD Number
59-16-02
Status
final_rule
Effective Date
Product Category
aircraft
Docket
Unknown
FR Citation
This information is not available.

Applicability

TypeManufacturerModelDetails
aircraft Air Trading Corporation | Lockheed Aircraft Corporation Army B-34 LOCKHEED Models 18, PV-1 and B-34 Series Aircraft
aircraft Air Trading Corporation | Lockheed Aircraft Corporation Navy PV-1 LOCKHEED Models 18, PV-1 and B-34 Series Aircraft
aircraft Air Trading Corporation | Lockheed Aircraft Corporation 18 LOCKHEED Models 18, PV-1 and B-34 Series Aircraft

Unsafe Condition

Fatigue cracks have been found in the horizontal stabilizer spars in the area of the vertical fin attachments.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Inspect the horizontal stabilizer front and rear spar flanges and webs for cracks in the region of the vertical fin attaching angles. If cracks are found, stop-drill, install spar flange and web doublers and flange filler blocks extending beyond the fin attaching angles, and add doubler plates on the forward face of rear spar in region of rudder hinge bracket attachment holes. Visual inspections with a 10-power glass are required.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Within the next 50 hours of flight and at 300-hour intervals thereafter

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

Lockheed Models 18, PV-1 and B-34 Series Aircraft except those incorporating spar reinforcement as covered in Lockheed Aircraft Service Bulletin 18/SB-112.

AI-generated summary from the source AD text. Verify against the official source before acting.

Federal Register Abstract

Stabilizer Spar

Applicability Source Text

Show captured applicability text from the source AD
AD Final Rules - DRS_59-16-02.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
59-16-02
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
LOCKHEED Models 18, PV-1 and B-34 Series Aircraft
Subject:
Stabilizer Spar
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
Make:
Air Trading Corporation | Lockheed Aircraft Corporation
Model:
Army B-34 | Navy PV-1 | 18
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 59-16-02
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:  

AD NUMBER:   59-16-02

SUBJECT HEADING:   LOCKHEED Models 18, PV-1 and B-34 Series Aircraft

ACTION:  

SUMMARY:  

DATES:  

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
59-16-02 LOCKHEED: Applies to Models 18, PV-1 and B-34 Series Aircraft Except Those Incorporating Spar Reinforcement as Covered in Lockheed Aircraft Service Bulletin 18/SB- 112.

Compliance required as indicated.

Numerous reports have been received wherein fatigue cracks have been found in the horizontal stabilizer spars in the area of the vertical fin attachments. In order to determine if this condition has developed, the following inspection is required.

Within the next 50 hours of flight and at 300-hour intervals thereafter inspect the horizontal stabilizer front and rear spar flanges and webs for cracks in the region of the vertical fin attaching angles. If cracks are found, stop-drill, install spar flange and web doublers and flange filler blocks extending beyond the fin attaching angles. Add doubler plates on the forward face of rear spar in region of rudder hinge bracket attachment holes. Visual inspections of the area with a 10-power glass are adequate. The 300 hour inspection may be discontinued after incorporation of the reinforcements. One approved method of accomplishing the above spar reinforcement is contained in Lockheed Aircraft Service Bulletin 18/SB-112 dated September 18, 1944, pertaining to this same subject.

Revised May 27, 1965.

FOOTER:

Document Text

Show stored source text (verify against official source)
AD Final Rules - DRS_59-16-02.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
59-16-02
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
LOCKHEED Models 18, PV-1 and B-34 Series Aircraft
Subject:
Stabilizer Spar
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
Make:
Air Trading Corporation | Lockheed Aircraft Corporation
Model:
Army B-34 | Navy PV-1 | 18
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 59-16-02
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:  

AD NUMBER:   59-16-02

SUBJECT HEADING:   LOCKHEED Models 18, PV-1 and B-34 Series Aircraft

ACTION:  

SUMMARY:  

DATES:  

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
59-16-02 LOCKHEED: Applies to Models 18, PV-1 and B-34 Series Aircraft Except Those Incorporating Spar Reinforcement as Covered in Lockheed Aircraft Service Bulletin 18/SB- 112.

Compliance required as indicated.

Numerous reports have been received wherein fatigue cracks have been found in the horizontal stabilizer spars in the area of the vertical fin attachments. In order to determine if this condition has developed, the following inspection is required.

Within the next 50 hours of flight and at 300-hour intervals thereafter inspect the horizontal stabilizer front and rear spar flanges and webs for cracks in the region of the vertical fin attaching angles. If cracks are found, stop-drill, install spar flange and web doublers and flange filler blocks extending beyond the fin attaching angles. Add doubler plates on the forward face of rear spar in region of rudder hinge bracket attachment holes. Visual inspections of the area with a 10-power glass are adequate. The 300 hour inspection may be discontinued after incorporation of the reinforcements. One approved method of accomplishing the above spar reinforcement is contained in Lockheed Aircraft Service Bulletin 18/SB-112 dated September 18, 1944, pertaining to this same subject.

Revised May 27, 1965.

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.

View Official Source ↗