AD 55-19-01
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | Hiller Aviation | UH-12 | Airworthiness Directives; Hiller Models UH-12, UH-12A, and UH-12B Helicopters |
| aircraft | Hiller Aviation | UH-12A | Airworthiness Directives; Hiller Models UH-12, UH-12A, and UH-12B Helicopters |
| aircraft | Hiller Aviation | UH-12B | Airworthiness Directives; Hiller Models UH-12, UH-12A, and UH-12B Helicopters |
Unsafe Condition
Cracking and failure of the tail boom rear bulkhead casting adjacent to the gearbox attachment holes, potentially caused by flight loads or damage during riveting.
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Inspect the tail boom rear bulkhead P/N 62201 for cracking using dye or fluorescent penetrant methods prior to next flight and every 25 hours operating time. Daily inspect visible portions of the bulkhead for cracks or failure. Replace P/N 62201 with P/N 62202 aluminum bulkhead if cracks are found, or install a new P/N 62201 if P/N 62202 is unavailable, following Hiller Service Bulletin No. 49.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
Prior to the next flight and every 25 hours operating time thereafter for inspections. Replace bulkhead prior to further flight if cracks are found.
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
Hiller Models UH-12, UH-12A, and UH-12B Helicopters, all serial numbers.
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
Tail Boom Rear Bulkhead
Applicability Source Text
Show captured applicability text from the source AD
AD Final Rules - DRS_55-19-01.html Copy URL Print/Save as PDF Document Versions Feedback Details AD Number: 55-19-01 Document Type: AD Final Rules Docket Number: Unknown Subject Heading: Airworthiness Directives; Hiller Models UH-12, UH-12A, and UH-12B Helicopters Subject: Tail Boom Rear Bulkhead Status: Current Citation: This information is not available. Citation Publish Date: Effective Date: Make: Hiller Aviation Model: UH-12 | UH-12A | UH-12B Product Type: Aircraft Product Subtype: Rotorcraft Affected AD: Superseded AD: Affected By: Superseded By: Service/Office: Office of Primary Responsibility: CFR Part Reference: Part 39 Comments: AIRWORTHINESS DIRECTIVES FINAL RULES: 55-19-01 CITATION: This information is not available. PAGE NUMBER: DOCKET NUMBER: Unknown AMENDMENT: AD NUMBER: 55-19-01 SUBJECT HEADING: Airworthiness Directives; Hiller Models UH-12, UH-12A, and UH-12B Helicopters ACTION: SUMMARY: DATES: ADDRESSES: FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: REGULATORY TEXT: 55-19-01 HILLER: Applies to All UH-12, UH-12A, and UH-12B Model Helicopters. Compliance required as indicated. There have been several instances of cracking and failure of the tail boom rear bulkhead casting adjacent to the gearbox attachment holes. Cause of the cracking is not definitely known, but may be caused by flight loads or by damage incurred when the bulkhead is riveted to the tail boom. The following inspections are required: (1) Prior to the next flight and every 25 hours operating time thereafter, remove the tail rotor gearbox in accordance with the pertinent Hiller Service Manual. Inspect the tail boom rear bulkhead P/N 62201 for evidence of cracking, using dye or fluorescent penetrant methods. (2) Daily inspect the visible portions of the tail boom rear bulkhead P/N 62201 for visible evidence of cracking or failure. (3) If cracks or other damage are found during the above inspections, the P/N 62201 (magnesium) bulkhead must be scrapped and replaced with the P/N 62202 (aluminum) bulkhead in accordance with Hiller Service Bulletin No. 49, revised August 23, 1955, prior to further flight. If a P/N 62202 bulkhead is not available, a new P/N 62201 bulkhead may be installed provided the inspections called for in paragraphs (1) and (2) are continued. FOOTER:
Document Text
Show stored source text (verify against official source)
AD Final Rules - DRS_55-19-01.html Copy URL Print/Save as PDF Document Versions Feedback Details AD Number: 55-19-01 Document Type: AD Final Rules Docket Number: Unknown Subject Heading: Airworthiness Directives; Hiller Models UH-12, UH-12A, and UH-12B Helicopters Subject: Tail Boom Rear Bulkhead Status: Current Citation: This information is not available. Citation Publish Date: Effective Date: Make: Hiller Aviation Model: UH-12 | UH-12A | UH-12B Product Type: Aircraft Product Subtype: Rotorcraft Affected AD: Superseded AD: Affected By: Superseded By: Service/Office: Office of Primary Responsibility: CFR Part Reference: Part 39 Comments: AIRWORTHINESS DIRECTIVES FINAL RULES: 55-19-01 CITATION: This information is not available. PAGE NUMBER: DOCKET NUMBER: Unknown AMENDMENT: AD NUMBER: 55-19-01 SUBJECT HEADING: Airworthiness Directives; Hiller Models UH-12, UH-12A, and UH-12B Helicopters ACTION: SUMMARY: DATES: ADDRESSES: FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: REGULATORY TEXT: 55-19-01 HILLER: Applies to All UH-12, UH-12A, and UH-12B Model Helicopters. Compliance required as indicated. There have been several instances of cracking and failure of the tail boom rear bulkhead casting adjacent to the gearbox attachment holes. Cause of the cracking is not definitely known, but may be caused by flight loads or by damage incurred when the bulkhead is riveted to the tail boom. The following inspections are required: (1) Prior to the next flight and every 25 hours operating time thereafter, remove the tail rotor gearbox in accordance with the pertinent Hiller Service Manual. Inspect the tail boom rear bulkhead P/N 62201 for evidence of cracking, using dye or fluorescent penetrant methods. (2) Daily inspect the visible portions of the tail boom rear bulkhead P/N 62201 for visible evidence of cracking or failure. (3) If cracks or other damage are found during the above inspections, the P/N 62201 (magnesium) bulkhead must be scrapped and replaced with the P/N 62202 (aluminum) bulkhead in accordance with Hiller Service Bulletin No. 49, revised August 23, 1955, prior to further flight. If a P/N 62202 bulkhead is not available, a new P/N 62201 bulkhead may be installed provided the inspections called for in paragraphs (1) and (2) are continued. FOOTER:
Source: Official FAA Source ↗
Retrieved: Apr 8, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.