AD 50-29-01

final rule

CURTISS-WRIGHT Model C-46 Series Aircraft

AD Number
50-29-01
Status
final_rule
Effective Date
Product Category
aircraft
Docket
Unknown
FR Citation
This information is not available.

Applicability

TypeManufacturerModelDetails
aircraft Airlift International, Inc. | Curtiss-Wright Corporation | Flying Tiger Line, Inc. | L. B. Smith Aircraft Corporation | Skyways International Trading and Transport Co. | Tempo Design Corporation C-46A CURTISS-WRIGHT Model C-46 Series Aircraft
aircraft Airlift International, Inc. | Curtiss-Wright Corporation | Flying Tiger Line, Inc. | L. B. Smith Aircraft Corporation | Skyways International Trading and Transport Co. | Tempo Design Corporation C-46D CURTISS-WRIGHT Model C-46 Series Aircraft
aircraft Airlift International, Inc. | Curtiss-Wright Corporation | Flying Tiger Line, Inc. | L. B. Smith Aircraft Corporation | Skyways International Trading and Transport Co. | Tempo Design Corporation C-46F CURTISS-WRIGHT Model C-46 Series Aircraft
aircraft Airlift International, Inc. | Curtiss-Wright Corporation | Flying Tiger Line, Inc. | L. B. Smith Aircraft Corporation | Skyways International Trading and Transport Co. | Tempo Design Corporation C-46R CURTISS-WRIGHT Model C-46 Series Aircraft
aircraft Airlift International, Inc. | Curtiss-Wright Corporation | Flying Tiger Line, Inc. | L. B. Smith Aircraft Corporation | Skyways International Trading and Transport Co. | Tempo Design Corporation C-46E CURTISS-WRIGHT Model C-46 Series Aircraft
aircraft Airlift International, Inc. | Curtiss-Wright Corporation | Flying Tiger Line, Inc. | L. B. Smith Aircraft Corporation | Skyways International Trading and Transport Co. | Tempo Design Corporation C-46/CW20-T CURTISS-WRIGHT Model C-46 Series Aircraft
aircraft Airlift International, Inc. | Curtiss-Wright Corporation | Flying Tiger Line, Inc. | L. B. Smith Aircraft Corporation | Skyways International Trading and Transport Co. | Tempo Design Corporation Super C-46/CW20-T CURTISS-WRIGHT Model C-46 Series Aircraft

Unsafe Condition

Loose rivets (5/32-A17ST modified brazier head) in the lower surface of the wing center section between Stations 82.5 and 107.5 near the front and rear spars.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Inspect the lower surface of the wing center section for loose rivets between Stations 82.5 and 107.5. Replace rivets immediately if more than 50 are loose along either front or rear spar on either wing side. If less than 50 are loose, replacement may be deferred until next major overhaul.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Within 25 hours' time in service after the effective date, unless already accomplished within the last 175 hours' time in service, and at intervals not exceeding 200 hours' time in service thereafter.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

Curtiss-Wright Model C-46 Series aircraft including C-46A, C-46D, C-46F, C-46R, C-46E, C-46/CW20-T, Super C-46/CW20-T models.

AI-generated summary from the source AD text. Verify against the official source before acting.

Applicability Source Text

Show captured applicability text from the source AD
AD Final Rules - DRS_50-29-01.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
50-29-01
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
CURTISS-WRIGHT Model C-46 Series Aircraft
Subject:
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
Make:
Airlift International, Inc. | Curtiss-Wright Corporation | Flying Tiger Line, Inc. | L. B. Smith Air...Show more
Model:
C-46A | C-46D | C-46F | C-46R | C-46E | C-46/CW20-T | Super C-46/CW20-T
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 50-29-01
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:  

AD NUMBER:   50-29-01

SUBJECT HEADING:   CURTISS-WRIGHT Model C-46 Series Aircraft

ACTION:  

SUMMARY:  

DATES:  

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:   50-29-01 CURTISS-WRIGHT Applies to Model C-46 Series aircraft.

Compliance required within 25 hours' time in service after the effective date of this amendment, unless already accomplished within the last 175 hours' time in service, and at intervals thereafter not to exceed 200 hours' time in service from the last inspection.

Inspect the lower surface of the wing center section for loose rivets (5/32-A17ST modified brazier head) in the area of the front and rear spars between Stations 82.5 and 107.5. If more than 50 rivets are found loose along either the front or rear spar on either R.H. or L.H. wing center section between the stations mentioned above, they should be replaced immediately following the procedure outlined by Civil Aeronautics Manual 18.20-3(e)(4) (ii)(a).

If less than 50 rivets are found loose at any of the above specified locations, the rivets need not be replaced until the time of next major overhaul.

Upon request of the operator, an FAA maintenance inspector, subject to prior approval of the Chief, Engineering and Manufacturing Branch, FAA Southern Region, may adjust the repetitive inspection intervals specified in this AD to permit compliance at an established inspection period of the operator if the request contains substantiating data to justify the increase.

Revised December 28, 1964.

FOOTER:

Document Text

Show stored source text (verify against official source)
AD Final Rules - DRS_50-29-01.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
50-29-01
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
CURTISS-WRIGHT Model C-46 Series Aircraft
Subject:
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
Make:
Airlift International, Inc. | Curtiss-Wright Corporation | Flying Tiger Line, Inc. | L. B. Smith Air...Show more
Model:
C-46A | C-46D | C-46F | C-46R | C-46E | C-46/CW20-T | Super C-46/CW20-T
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 50-29-01
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:  

AD NUMBER:   50-29-01

SUBJECT HEADING:   CURTISS-WRIGHT Model C-46 Series Aircraft

ACTION:  

SUMMARY:  

DATES:  

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:   50-29-01 CURTISS-WRIGHT Applies to Model C-46 Series aircraft.

Compliance required within 25 hours' time in service after the effective date of this amendment, unless already accomplished within the last 175 hours' time in service, and at intervals thereafter not to exceed 200 hours' time in service from the last inspection.

Inspect the lower surface of the wing center section for loose rivets (5/32-A17ST modified brazier head) in the area of the front and rear spars between Stations 82.5 and 107.5. If more than 50 rivets are found loose along either the front or rear spar on either R.H. or L.H. wing center section between the stations mentioned above, they should be replaced immediately following the procedure outlined by Civil Aeronautics Manual 18.20-3(e)(4) (ii)(a).

If less than 50 rivets are found loose at any of the above specified locations, the rivets need not be replaced until the time of next major overhaul.

Upon request of the operator, an FAA maintenance inspector, subject to prior approval of the Chief, Engineering and Manufacturing Branch, FAA Southern Region, may adjust the repetitive inspection intervals specified in this AD to permit compliance at an established inspection period of the operator if the request contains substantiating data to justify the increase.

Revised December 28, 1964.

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.

View Official Source ↗