AD 47-10-19

final rule

LOCKHEED Model 49

AD Number
47-10-19
Status
final_rule
Effective Date
Product Category
aircraft
Docket
Unknown
FR Citation
This information is not available.

Applicability

TypeManufacturerModelDetails
aircraft Lockheed Aircraft Corporation 49-46 LOCKHEED Model 49

Unsafe Condition

The cabin heater fuel solenoid valve and fuel pump bypass line may be improperly located or routed, leading to potential fuel leakage or electrical short circuits. Additionally, the absence of heat protective shields in nacelle zone 2, improper mounting hardware in nacelle junction boxes, and lack of drain holes in spinner fairings may cause overheating, component failure, or moisture ingress.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Relocate and waterproof the cabin heater fuel solenoid valve, replace and reroute the fuel pump bypass line, install heat protective shields in nacelle zone 2, replace mounting nuts and screws with AN 366 and NAS 221 hardware, and drill 1/4-inch drain holes in spinner fairing lower panels.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

not later than 100 hours of operation after June 10, 1947

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

Lockheed Aircraft Corporation Model 49 serials up to and including 2088, except as noted. Specific requirements for serials up to 2082 for heat shields and all applicable serials for other modifications.

AI-generated summary from the source AD text. Verify against the official source before acting.

Federal Register Abstract

Cabin Heater Fuel Solenoid Valve

Applicability Source Text

Show captured applicability text from the source AD
AD Final Rules - DRS_47-10-19.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
47-10-19
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
LOCKHEED Model 49
Subject:
Cabin Heater Fuel Solenoid Valve
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
Make:
Lockheed Aircraft Corporation
Model:
49-46
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 47-10-19
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:  

AD NUMBER:   47-10-19

SUBJECT HEADING:   LOCKHEED Model 49

ACTION:  

SUMMARY:  

DATES:  

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
47-10-19 LOCKHEED: (Was Mandatory Note 21 of AD-763-3.) Applies to All Model 49 Serials Up to and Including 2088, Except as Noted.

Compliance required not later than 100 hours of operation after June 10, 1947.

(a) In each cabin heater installation, relocate and waterproof the fuel solenoid valve and replace and reroute the fuel pump bypass line.

(LAC Service Bulletin 49/SB-73 covers this same subject.)

(b) In zone 2 of each nacelle, install heat protective shield between propeller feathering line and cowl diaphragm. Applies to all serials up to and including 2082.

(LAC Service Bulletin 49/SB-150 covers this same subject.)

(c) In each outboard nacelle main junction box, replace existing mounting nuts (tinnerman) and PK screws with AN 366 nuts and NAS 221 screws.

(LAC Service Bulletin 49/SB-152 covers this same subject.)

(d) Drill one 1/4-inch drain hole on lower center line of spinner fairing lower panel assembly for each engine.

(LAC Service Instruction 49/SI-95 covers this same subject.)

FOOTER:

Document Text

Show stored source text (verify against official source)
AD Final Rules - DRS_47-10-19.html
Copy URL
Print/Save as PDF
Document Versions
 Feedback
Details
AD Number:
47-10-19
Document Type:
AD Final Rules
Docket Number:
Unknown
Subject Heading:
LOCKHEED Model 49
Subject:
Cabin Heater Fuel Solenoid Valve
Status:
Current
Citation:
This information is not available.
Citation Publish Date:
Effective Date:
Make:
Lockheed Aircraft Corporation
Model:
49-46
Product Type:
Aircraft
Product Subtype:
Large Airplane
Affected AD:
Superseded AD:
Affected By:
Superseded By:
Service/Office:
Office of Primary Responsibility:
CFR Part Reference:
Part 39
Comments:
AIRWORTHINESS DIRECTIVES FINAL RULES: 47-10-19
CITATION:   This information is not available.

PAGE NUMBER:  

DOCKET NUMBER:   Unknown

AMENDMENT:  

AD NUMBER:   47-10-19

SUBJECT HEADING:   LOCKHEED Model 49

ACTION:  

SUMMARY:  

DATES:  

ADDRESSES:  

FOR FURTHER INFORMATION CONTACT:  

SUPPLEMENTARY INFORMATION:  

REGULATORY TEXT:  
47-10-19 LOCKHEED: (Was Mandatory Note 21 of AD-763-3.) Applies to All Model 49 Serials Up to and Including 2088, Except as Noted.

Compliance required not later than 100 hours of operation after June 10, 1947.

(a) In each cabin heater installation, relocate and waterproof the fuel solenoid valve and replace and reroute the fuel pump bypass line.

(LAC Service Bulletin 49/SB-73 covers this same subject.)

(b) In zone 2 of each nacelle, install heat protective shield between propeller feathering line and cowl diaphragm. Applies to all serials up to and including 2082.

(LAC Service Bulletin 49/SB-150 covers this same subject.)

(c) In each outboard nacelle main junction box, replace existing mounting nuts (tinnerman) and PK screws with AN 366 nuts and NAS 221 screws.

(LAC Service Bulletin 49/SB-152 covers this same subject.)

(d) Drill one 1/4-inch drain hole on lower center line of spinner fairing lower panel assembly for each engine.

(LAC Service Instruction 49/SI-95 covers this same subject.)

FOOTER:

Source: Official FAA Source ↗

Retrieved: Apr 8, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.