AD 2019-24-16
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | Embraer | Various | Airworthiness Directives; Embraer S.A. Airplanes |
Unsafe Condition
fatigue cracking of structural components and failure of certain system components, which could result in reduced structural integrity and system reliability of the airplane
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
revising the existing maintenance or inspection program, as applicable, to incorporate new or more restrictive airworthiness limitations
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
Within 90 days after the effective date of this AD
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
Embraer S.A. Model ERJ 190-100 STD, -100 LR, -100 ECJ, -100 SR, and -100 IGW airplanes; and Model ERJ 190-200 STD, -200 LR, and -200 IGW airplanes
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
The FAA is superseding Airworthiness Directive (AD) 2017-16- 08, which applied to certain Embraer S.A. Model ERJ 190-100 STD, -100 LR, -100 IGW, and -100 ECJ airplanes; and Model ERJ 190-200 STD, -200 LR, and -200 IGW airplanes. AD 2017-16-08 required revising the existing maintenance or inspection program, as applicable, to incorporate more restrictive airworthiness limitations. This AD requires revising the existing maintenance or inspection program, as applicable, to incorporate new or more restrictive airworthiness limitations. This AD also adds airplanes to the applicability. This AD was prompted by the FAA's determination that new or more restrictive airworthiness limitations are necessary. The FAA is issuing this AD to address the unsafe condition on these products.
Applicability Source Text
Show captured applicability text from the source AD
(c) Applicability
This AD applies to Embraer S.A. Model ERJ 190-100 STD, -100 LR,
-100 ECJ, and -100 IGW airplanes; and Model ERJ 190-200 STD, -200
LR, and -200 IGW airplanes; certificated in any category; serial
numbers 19000002, 19000004, 19000006 through 19000213 inclusive,
19000215 through 19000276 inclusive, 19000278 through 19000466
inclusive, 19000468 through 19000525 inclusive, and 19000527 through
19000758 inclusive.
Document Text
Show stored source text (verify against official source)
[Federal Register Volume 84, Number 249 (Monday, December 30, 2019)]
[Rules and Regulations]
[Pages 71772-71776]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2019-28068]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2019-0519; Product Identifier 2019-NM-089-AD; Amendment
39-21005; AD 2019-24-16]
RIN 2120-AA64
Airworthiness Directives; Embraer S.A. Airplanes
AGENCY: Federal Aviation Administration (FAA), Department of
Transportation (DOT).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2017-16-
08, which applied to certain Embraer S.A. Model ERJ 190-100 STD, -100
LR, -100 IGW, and -100 ECJ airplanes; and Model ERJ 190-200 STD, -200
LR, and -200 IGW airplanes. AD 2017-16-08 required revising the
existing maintenance or inspection program, as applicable, to
incorporate more restrictive airworthiness limitations. This AD
requires revising the existing maintenance or inspection program, as
applicable, to incorporate new or more restrictive airworthiness
limitations. This AD also adds airplanes to the applicability. This AD
was prompted by the FAA's determination that new or more restrictive
airworthiness limitations are necessary. The FAA is issuing this AD to
address the unsafe condition on these products.
DATES: This AD is effective February 3, 2020.
The Director of the Federal Register approved the incorporation by
reference of certain publications listed in this AD as of February 3,
2020.
The Director of the Federal Register approved the incorporation by
reference of certain other publications listed in this AD as of October
11, 2017 (82 FR 42021, September 6, 2017).
ADDRESSES: For service information identified in this final rule,
contact Embraer S.A., Technical Publications Section (PC 060), Av.
Brigadeiro Faria Lima, 2170--Putim--12227-901 S[atilde]o Jose dos
Campos--SP--Brazil; telephone +55 12 3927-5852 or +55 12 3309-0732; fax
+55 12 3927-7546; email <a href="/cdn-cgi/l/email-protection#17737e6463657e7557727a75657672653974787a397565"><span class="__cf_email__" data-cfemail="f99d908a8d8b909bb99c949b8b989c8bd79a9694d79b8b">[email protected]</span></a>; internet <a href="https://www.flyembraer.com">https://www.flyembraer.com</a>. You may view this referenced service information at
the FAA, Transport Standards Branch, 2200 South 216th St., Des Moines,
WA. For information on the availability of this material at the FAA,
call 206-231-3195. It is also available on the internet at <a href="https://www.regulations.gov">https://www.regulations.gov</a> by searching for and locating Docket No. FAA-2019-
0519.
Examining the AD Docket
You may examine the AD docket on the internet at <a href="https://www.regulations.gov">https://www.regulations.gov</a> by searching for and locating Docket No. FAA-2019-
0519; or in person at Docket Operations between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal holidays. The AD docket contains
this final rule, the regulatory evaluation, any comments received, and
other information. The address for Docket Operations is U.S. Department
of Transportation, Docket Operations, M-30, West Building Ground Floor,
Room W12-140, 1200 New Jersey Avenue SE, Washington, DC 20590.
FOR FURTHER INFORMATION CONTACT: Krista Greer, Aerospace Engineer,
International Section, Transport Standards Branch, FAA, 2200 South
216th St., Des Moines, WA 98198; telephone and fax 206-231-3221.
SUPPLEMENTARY INFORMATION:
Discussion
The Ag[ecirc]ncia Nacional de Avia[ccedil][atilde]o Civil (ANAC),
which is the aviation authority for Brazil, has issued Brazilian AD
2019-05-02, effective May 2, 2019; corrected July 1, 2019 (``Brazilian
AD
[[Page 71773]]
2019-05-02'') (also referred to after this as the Mandatory Continuing
Airworthiness Information, or ``the MCAI''), to correct an unsafe
condition for certain Embraer S.A. Model ERJ 190-100 STD, -100 LR, -100
ECJ, -100 SR, and -100 IGW airplanes; and Model ERJ 190-200 STD, -200
LR, and -200 IGW airplanes. Model ERJ 190-100SR airplanes are not on
the U.S. Register; this AD therefore does not include those airplanes
in the applicability. You may examine the MCAI in the AD docket on the
internet at <a href="https://www.regulations.gov">https://www.regulations.gov</a> by searching for and locating
Docket No. FAA-2019-0519.
The FAA issued a notice of proposed rulemaking (NPRM) to amend 14
CFR part 39 to supersede AD 2017-16-08, Amendment 39-18985 (82 FR
42021, September 6, 2017) (``AD 2017-16-08''). AD 2017-16-08 applied to
certain Embraer S.A. Model ERJ 190-100 STD, -100 LR, -100 ECJ and -100
IGW airplanes and Model ERJ 190-200 STD, -200 LR, and -200 IGW
airplanes. The NPRM published in the Federal Register on July 5, 2019
(84 FR 32101). The NPRM was prompted by the FAA's determination that
new or more restrictive airworthiness limitations are necessary. The
NPRM proposed to require revising the existing maintenance or
inspection program, as applicable, to incorporate new or more
restrictive airworthiness limitations. The NPRM also proposed to add
airplanes to the applicability. The FAA is issuing this AD to address
fatigue cracking of structural components and to address failure of
certain system components, which could result in reduced structural
integrity and system reliability of the airplane. See the MCAI for
additional background information.
Action Since the NPRM Was Issued
Since the NPRM was issued ANAC published a correction to Brazilian
AD 2019-05-02 to clarify that the initial compliance times identified
as ``Threshold'' or ``T'' in EMBRAER 190/195 Maintenance Review Board
Report, MRB-1928, Revision 12, dated September 27, 2018 (``EMBRAER 190/
195 MRB-1928, Revision 12''), are expressed in total flight cycles and
total flight hours. The FAA has revised paragraph (i)(1)(i) of this AD
to state ``For the purposes of this AD, the initial compliance times
(identified as `Threshold' or `T' in EMBRAER 190/195 MRB-1928, Revision
12) are expressed in `total flight cycles' or `total flight hours,' as
applicable.''
Comments
The FAA gave the public the opportunity to participate in
developing this final rule. The following presents the comment received
on the NPRM and the FAA's response to that comment.
Request for Credit for Previously Accomplished Actions
Embraer requested that operators be allowed to substitute the last
accomplishment of task 53-23-001-0001, which was included in Revision
11 and earlier of EMBRAER 190/195 MRB-1928, for the initial
accomplishment of task 53-53-001-0004, which is included in EMBRAER
190/195 MRB-1928, Revision 12. Embraer justified its request by
providing a copy of Brazilian AMOC No. 632/2019/GCPR/GGCP/SAR-ANAC,
dated June 13, 2019. The commenter explained that task 53-23-001-0004
was created for EMBRAER 190/195 MRB-1928, Revision 12, by splitting an
existing task from previous revisions of EMBRAER 190/195 MRB-1928 in
order to increase the interval for certain parts of the task, reducing
the frequency of access in areas that are difficult to access. In
EMBRAER 190/195 Maintenance Review Board Report, MRB-1928, Revision 11,
and earlier, task 53-23-001-0001 included the same inspection as task
53-23-001-0004. ANAC granted Brazilian AMOC No. 632/2019/GCPR/GGCP/SAR-
ANAC, dated June 13, 2019, to provide credit for a one time
accomplishment of task 53-23-001-0001 as a substitution for the initial
accomplishment of task 53-23-001-0004, provided the task was
accomplished within 5,000 flight cycles since the last accomplishment.
The FAA agrees with the commenter's request for the reason provided
and has included Brazilian AMOC No. 632/2019/GCPR/GGCP/SAR-ANAC, dated
June 13, 2019, in paragraph (k)(1)(iii) of this AD to allow
accomplishment of task 53-23-001-0001 after the effective date of this
AD as a substitution for the initial accomplishment of task 53-23-001-
0004, provided this task was accomplished within 5,000 flight cycles
since it was last accomplished.
Conclusion
The FAA reviewed the relevant data, considered the comment
received, and determined that air safety and the public interest
require adopting this final rule with the change described previously
and minor editorial changes. The FAA determined that these minor
changes:
<bullet> Are consistent with the intent that was proposed in the
NPRM for addressing the unsafe condition; and
<bullet> Do not add any additional burden upon the public than was
already proposed in the NPRM.
The FAA also determined that these changes will not increase the
economic burden on any operator or increase the scope of this final
rule.
Related Service Information Under 1 CFR Part 51
Embraer has issued Appendix A--Airworthiness Limitations (AL), to
the EMBRAER 190/195 Maintenance Review Board Report, MRB-1928, Revision
12, dated September 27, 2018.
Embraer has also issued Appendix A--Airworthiness Limitations (AL),
to the EMBRAER Lineage 1000/1000E Maintenance Planning Guide, MPG-2928,
Revision 8, dated October 10, 2018.
This AD also requires the following documents, which the Director
of the Federal Register approved for incorporation by reference as of
October 11, 2017 (82 FR 42021, September 6, 2017).
<bullet> Appendix A--Airworthiness Limitations (AL), of the EMBRAER
ERJ 190/195 Maintenance Review Board Report, MRB-1928, Revision 9,
dated August 14, 2015.
<bullet> Appendix A--Airworthiness Limitations (AL), of the EMBRAER
Lineage 1000/1000E Maintenance Planning Guide, MPG-2928, Revision 4,
dated July 14, 2014.
<bullet> EMBRAER MPG--Temporary Revision 4-2, dated February 13,
2015.
<bullet> EMBRAER MPG--Temporary Revision 4-3, dated October 30,
2015.
<bullet> EMBRAER MRB--Temporary Revision 9-1, dated October 27,
2015.
<bullet> EMBRAER MRB--Temporary Revision 9-3, dated October 27,
2015
This service information is reasonably available because the
interested parties have access to it through their normal course of
business or by the means identified in the ADDRESSES section.
Costs of Compliance
The FAA estimates that this AD affects 107 airplanes of U.S.
registry.
The FAA estimates the following costs to comply with this AD.
The actions that are required by AD 2017-16-08 and retained in this
final rule take about 1 work-hour per product, at an average labor rate
of $85 per work hour. Required parts cost about $0 per product. Based
on these figures, the estimated cost of the actions that were required
by AD 2017-16-08 is $85 per product.
The FAA has determined that revising the existing maintenance or
inspection program takes an average of 90 work-hours per operator,
although the agency
[[Page 71774]]
recognizes that this number may vary from operator to operator. In the
past, the FAA has estimated that this action takes 1 work-hour per
airplane. Since operators incorporate maintenance or inspection program
changes for their affected fleet(s), the FAA has determined that a per-
operator estimate is more accurate than a per-airplane estimate.
Therefore, the FAA estimates the total cost per operator to be $7,650
(90 work-hours x $85 per work-hour).
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. Subtitle VII: Aviation Programs,
describes in more detail the scope of the Agency's authority.
The FAA is issuing this rulemaking under the authority described in
Subtitle VII, Part A, Subpart III, Section 44701: ``General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
This AD is issued in accordance with authority delegated by the
Executive Director, Aircraft Certification Service, as authorized by
FAA Order 8000.51C. In accordance with that order, issuance of ADs is
normally a function of the Compliance and Airworthiness Division, but
during this transition period, the Executive Director has delegated the
authority to issue ADs applicable to transport category airplanes and
associated appliances to the Director of the System Oversight Division.
Regulatory Findings
The FAA determined that this AD will not have federalism
implications under Executive Order 13132. This AD will not have a
substantial direct effect on the States, on the relationship between
the national government and the States, or on the distribution of power
and responsibilities among the various levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866,
(2) Will not affect intrastate aviation in Alaska, and
(3) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
Accordingly, under the authority delegated to me by the
Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by removing Airworthiness Directive (AD)
2017-16-08, Amendment 39-18985 (82 FR 42021, September 6, 2017), and
adding the following new AD:
2019-24-16 Embraer S.A.: Amendment 39-21005; Docket No. FAA-2019-
0519; Product Identifier 2019-NM-089-AD.
(a) Effective Date
This AD is effective February 3, 2020.
(b) Affected ADs
This AD replaces AD 2017-16-08, Amendment 39-18985 (82 FR 42021,
September 6, 2017) (``AD 2017-16-08'').
(c) Applicability
This AD applies to Embraer S.A. Model ERJ 190-100 STD, -100 LR,
-100 ECJ, and -100 IGW airplanes; and Model ERJ 190-200 STD, -200
LR, and -200 IGW airplanes; certificated in any category; serial
numbers 19000002, 19000004, 19000006 through 19000213 inclusive,
19000215 through 19000276 inclusive, 19000278 through 19000466
inclusive, 19000468 through 19000525 inclusive, and 19000527 through
19000758 inclusive.
(d) Subject
Air Transport Association (ATA) of America Codes 27, Flight
controls; 28, Fuel; 52, Doors; 53, Fuselage; 54, Nacelles/pylons;
55, Stabilizers; 57, Wings; 71, Powerplant; and 78, Exhaust.
(e) Reason
This AD was prompted by a determination that new or more
restrictive airworthiness limitations are necessary. The FAA is
issuing this AD to address fatigue cracking of structural components
and to address failure of certain system components, which could
result in reduced structural integrity and system reliability of the
airplane.
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
(g) Retained Revision of Maintenance or Inspection Program, With No
Changes
This paragraph restates the requirements of paragraph (i) of AD
2017-16-08, with no changes. For airplanes having serial numbers
19000002, 19000004, 19000006 through 19000213 inclusive, 19000215
through 19000276 inclusive, 19000278 through 19000466 inclusive,
19000468 through 19000525 inclusive, and 19000527 through 19000696
inclusive, do the revision required by paragraph (g)(1) or (2) of
this AD, as applicable.
(1) For Model ERJ 190-100 STD, ERJ 190-100 LR, ERJ 190-100 IGW,
ERJ 190-200 STD, ERJ 190-200 LR, and ERJ 190-200 IGW airplanes:
Within 90 days after October 11, 2017 (the effective date of AD
2017-16-08), revise the existing maintenance or inspection program,
as applicable, to incorporate the tasks specified in Part 2--
Airworthiness Limitation Inspections--Structures, of Appendix A--
Airworthiness Limitations (AL), of the EMBRAER 190/195 Maintenance
Review Board Report, MRB-1928, Revision 9, dated August 14, 2015
(``MRB-1928, Revision 9''); EMBRAER MRB--Temporary Revision 9-1,
dated October 27, 2015, to Part 2--Airworthiness Limitation
Inspections--Structures, and Part 4--Life Limited Items, of Appendix
A--Airworthiness Limitations (AL), of MRB-1928, Revision 9; and
EMBRAER MRB--Temporary Revision 9-3, dated October 27, 2015, to Part
2--Airworthiness Limitation Inspections--Structures, of Appendix A--
Airworthiness Limitations (AL), of MRB-1928, Revision 9; with the
thresholds and intervals stated in these documents. The initial
compliance times for the tasks are at the later of the times
specified in paragraphs (g)(1)(i) and (ii) of this AD.
(i) Within the applicable times specified in MRB-1928, Revision
9; EMBRAER MRB--Temporary Revision 9-1, dated October 27, 2015, to
Part 2--Airworthiness Limitation Inspections--Structures, and Part
4--Life Limited Items, of Appendix A--Airworthiness Limitations
(AL), of MRB-1928, Revision 9; and EMBRAER MRB--Temporary Revision
9-3, dated October 27, 2015, to Part 2--Airworthiness Limitation
Inspections--Structures, of Appendix A--Airworthiness Limitations
(AL), of MRB-1928, Revision 9. Where tasks are listed in both MRB-
1928, Revision 9, and a temporary revision, the compliance times in
the temporary revision take precedence.
(ii) Within 90 days or 600 flight cycles after October 11, 2017
(the effective date of AD 2017-16-08), whichever occurs later.
(2) For Model ERJ 190-100 ECJ airplanes: Within 90 days after
October 11, 2017 (the effective date of AD 2017-16-08), revise the
maintenance or inspection program, as applicable, to incorporate the
tasks specified in Part 1--Certification Maintenance Requirements,
Part 2--Airworthiness Limitation Inspections--Structures, Part 3--
Fuel System Limitation Items, and Part 4--Life Limited Items, of
Appendix A--
[[Page 71775]]
Airworthiness Limitations (AL), of the EMBRAER Lineage 1000/1000E
Maintenance Planning Guide, MPG-2928, Revision 4, dated July 14,
2014; EMBRAER MPG--Temporary Revision 4-2, dated February 13, 2015;
and EMBRAER MPG--Temporary Revision 4-3, dated October 30, 2015;
with the thresholds and intervals stated in these documents. The
initial compliance times for the tasks are at the later of the times
specified in paragraphs (g)(2)(i) and (ii) of this AD.
(i) Within the applicable times specified in Part 1,
Certification Maintenance Requirements, Part 2, Airworthiness
Limitation Inspections--Structures, Part 3, Fuel System Limitation
Items, and Part 4, Life Limited Items, of Appendix A--Airworthiness
Limitations (AL), of the EMBRAER Lineage 1000/1000E Maintenance
Planning Guide, MPG-2928, Revision 4, dated July 14, 2014; EMBRAER
MPG--Temporary Revision 4-2, dated February 13, 2015; and EMBRAER
MPG--Temporary Revision 4-3, dated October 30, 2015. Where tasks are
listed in both MPG-2928, Revision 4, and a temporary revision, the
compliance times in the temporary revision take precedence.
(ii) Within 90 days or 600 flight cycles after October 11, 2017
(the effective date AD 2017-16-08), whichever occurs later.
(h) Retained No Alternative Actions Intervals, or Critical Design
Configuration Control Limitations (CDCCLs), With New Exception
This paragraph restates the action required by paragraph (j) of
AD 2017-16-08, with a new exception. Except as required by paragraph
(i) of this AD, after accomplishment of the revision required by
paragraph (g) of this AD, no alternative actions (e.g.,
inspections), intervals, or CDCCLs may be used unless the actions,
intervals, or CDCCLs are approved as an AMOC in accordance with the
procedures specified in paragraph (k)(1) of this AD.
(i) New Requirement of This AD: Maintenance or Inspection Program
Revision
(1) For Model ERJ 190-100 STD, ERJ 190-100 LR, ERJ 190-100 IGW,
ERJ 190-200 STD, ERJ 190-200 LR, and ERJ 190-200 IGW airplanes:
Within 90 days after the effective date of this AD, revise the
existing maintenance or inspection program, as applicable, to
incorporate the information specified in Appendix A--Airworthiness
Limitations (AL), to the EMBRAER 190/195 Maintenance Review Board
Report, MRB-1928, Revision 12, dated September 27, 2018 (``EMBRAER
190/195 MRB-1928, Revision 12''). The initial compliance time for
doing the tasks are at the later of the times specified in
paragraphs (i)(1)(i) and (ii) of this AD. Accomplishing the revision
required by this paragraph terminates the requirements of paragraph
(g)(1) of this AD.
(i) Within the applicable times specified in EMBRAER 190/195
MRB-1928, Revision 12. For the purposes of this AD, the initial
compliance times (identified as ``Threshold'' or ``T'' in EMBRAER
190/195 MRB-1928, Revision 12) are expressed in ``total flight
cycles or ``total flight hours'' as applicable.
(ii) Within 90 days or 600 flight cycles after the effective
date of this AD, whichever occurs later.
(2) For Model ERJ 190-100 ECJ airplanes: Within 90 days after
the effective date of this AD, revise the existing maintenance or
inspection program, as applicable, to incorporate the tasks
specified in Appendix A--Airworthiness Limitations (AL), of the
EMBRAER Lineage 1000/1000E Maintenance Planning Guide, MPG-2928,
Revision 8, dated October 10, 2018 (``EMBRAER Lineage 1000/1000E
MPG-2928, Revision 8''). The initial compliance times for the tasks
are at the later of the times specified in paragraphs (i)(2)(i) and
(ii) of this AD. Accomplishing the revision required by this
paragraph terminates the requirements of paragraph (g)(2) of this
AD.
(i) Within the applicable times specified in EMBRAER Lineage
1000/1000E MPG-2928, Revision 8. For the purposes of this AD, the
initial compliance times (identified as ``Threshold'' or ``T'' in
EMBRAER Lineage 1000/1000E MPG-2928, Revision 8) are expressed in
``total flight cycles'' or ``total flight hours'' as applicable.
(ii) Within 90 days or 600 flight cycles after the effective
date of this AD, whichever occurs later.
(j) No Alternative Actions, Intervals, or CDCCLs
After the existing maintenance or inspection program has been
revised as required by paragraph (i) of this AD, no alternative
actions (e.g., inspections), intervals, or CDCCLs may be used unless
the actions, intervals, and CDCCLs are approved as an AMOC in
accordance with the procedures specified in paragraph (k)(1) of this
AD.
(k) Other FAA AD Provisions
(1) Alternative Methods of Compliance (AMOCs): The Manager,
International Section, Transport Standards Branch, FAA, has the
authority to approve AMOCs for this AD, if requested using the
procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19,
send your request to your principal inspector or local Flight
Standards District Office, as appropriate. If sending information
directly to the International Section, send it to the attention of
the person identified in paragraph (l)(2) of this AD. Information
may be emailed to <a href="/cdn-cgi/l/email-protection#251c08646b68081414130864686a66087760747060767176654344440b424a53"><span class="__cf_email__" data-cfemail="132a3e525d5e3e2222253e525e5c503e4156424656404740537572723d747c65">[email protected]</span></a>.
(i) Before using any approved AMOC, notify your appropriate
principal inspector, or lacking a principal inspector, the manager
of the local flight standards district office/certificate holding
district office.
(ii) FAA AMOC letter AIR-676-18-241, dated May 14, 2018,
approved previously for AD 2017-16-08, is approved as an AMOC for
the corresponding provisions of this AD.
(iii) Brazilian AMOC No. 632/2019/GCPR/GGCP/SAR-ANAC, dated June
13, 2019, is approved as an AMOC for the corresponding provisions of
this AD, provided the task was performed within 5,000 flight cycles
since its last accomplishment.
(2) Contacting the Manufacturer: As of the effective date of
this AD, for any requirement in this AD to obtain corrective actions
from a manufacturer, the action must be accomplished using a method
approved by the Manager, International Section, Transport Standards
Branch, FAA; or the ANAC; or ANAC's authorized Designee. If approved
by the ANAC Designee, the approval must include the Designee's
authorized signature.
(l) Related Information
(1) Refer to Mandatory Continuing Airworthiness Information
(MCAI) Brazilian AD 2019-05-02, effective May 2, 2019; corrected
July 1, 2019; for related information. This MCAI may be found in the
AD docket on the internet at <a href="https://www.regulations.gov">https://www.regulations.gov</a> by
searching for and locating Docket No. FAA-2019-0519.
(2) For more information about this AD, contact Krista Greer,
Aerospace Engineer, International Section, Transport Standards
Branch, FAA, 2200 South 216th St., Des Moines, WA 98198; telephone
and fax 206-231-3221.
(m) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless this AD specifies otherwise.
(3) The following service information was approved for IBR on
February 3, 2020.
(i) Appendix A--Airworthiness Limitations (AL); to the EMBRAER
190/195 Maintenance Review Board Report, MRB-1928, Revision 12,
dated September 27, 2018.
(ii) Appendix A--Airworthiness Limitations (AL), to the EMBRAER
Lineage 1000/1000E Maintenance Planning Guide, MPG-2928, Revision 8,
dated October 10, 2018.
(4) The following service information was approved for IBR on
October 11, 2017 (82 FR 42021, September 6, 2017).
(i) Appendix A--Airworthiness Limitations (AL), of the EMBRAER
ERJ 190/195 Maintenance Review Board Report, MRB-1928, Revision 9,
dated August 14, 2015.
(ii) Appendix A--Airworthiness Limitations (AL), of the EMBRAER
Lineage 1000/1000E Maintenance Planning Guide, MPG-2928, Revision 4,
dated July 14, 2014.
(iii) EMBRAER MPG--Temporary Revision 4-2, dated February 13,
2015.
(iv) EMBRAER MPG--Temporary Revision 4-3, dated October 30,
2015.
(v) EMBRAER MRB--Temporary Revision 9-1, dated October 27, 2015.
(vi) EMBRAER MRB--Temporary Revision 9-3, dated October 27,
2015.
(5) For service information identified in this AD, contact
Embraer S.A., Technical Publications Section (PC 060), Av.
Brigadeiro Faria Lima, 2170--Putim--12227-901 S[atilde]o Jose dos
Campos--SP--Brasil; telephone +55 12 3927-5852 or +55 12 3309-0732;
fax +55 12 3927-7546; email <a href="/cdn-cgi/l/email-protection#9afef3e9eee8f3f8dafff7f8e8fbffe8b4f9f5f7b4f8e8"><span class="__cf_email__" data-cfemail="9efaf7edeaecf7fcdefbf3fcecfffbecb0fdf1f3b0fcec">[email protected]</span></a>; internet <a href="https://www.flyembraer.com">https://www.flyembraer.com</a>.
(6) You may view this service information at the FAA, Transport
Standards Branch, 2200 South 216th St., Des Moines, WA. For
information on the availability of this material at the FAA, call
206-231-3195.
[[Page 71776]]
(7) You may view this service information that is incorporated
by reference at the National Archives and Records Administration
(NARA). For information on the availability of this material at
NARA, email <a href="/cdn-cgi/l/email-protection#a0c6c5c4d2c5c78eccc5c7c1cce0cec1d2c18ec7cfd6"><span class="__cf_email__" data-cfemail="9cfaf9f8eef9fbb2f0f9fbfdf0dcf2fdeefdb2fbf3ea">[email protected]</span></a>, or go to: <a href="https://www.archives.gov/federal-register/cfr/ibr-locations.html">https://www.archives.gov/federal-register/cfr/ibr-locations.html</a>.
Issued in Des Moines, Washington, on December 9, 2019.
Michael Kaszycki,
Acting Director, System Oversight Division, Aircraft Certification
Service.
[FR Doc. 2019-28068 Filed 12-27-19; 8:45 am]
BILLING CODE 4910-13-P
Source: Official FAA Source ↗
Retrieved: Apr 6, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.