AD 2018-20-20
final rule
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | Bombardier | Various | Airworthiness Directives; Bombardier, Inc., Airplanes |
| aircraft | Bell | crank for the control linkage in the vertical stabilizer | Airworthiness Directives; Bombardier, Inc., Airplanes |
Unsafe Condition
unsafe condition on these products.
Required Actions
an eddy current inspection on certain support brackets of the elevator bell crank for any cracking at the fastener holes, a measurement to confirm that the fastener hole diameters are within tolerance, and replacement with a new support bracket of the elevator bell crank if necessary
Source: Official FAA Source ↗
Retrieved: Apr 4, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.