AD 2016-10-10
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | Bombardier Inc. | CL-600-2B16 (CL-601-3A) | Airworthiness Directives; Bombardier, Inc. Airplanes |
| aircraft | Bombardier Inc. | CL-600-2B16 (CL-601-3R) | Airworthiness Directives; Bombardier, Inc. Airplanes |
| aircraft | Bombardier Inc. | CL-600-2B16 (CL-604) | Airworthiness Directives; Bombardier, Inc. Airplanes |
Unsafe Condition
Fuel leakage in the auxiliary power unit (APU) fuel Boost Pump (BP) canister connector cavity, which may also leak at the APU fuel BP electrical conduit connection in the right-hand landing light compartment. The root cause is identified as the improper length of the female connector keyway in the fuel BP canister, causing a shift of the electrical harness and its seals.
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Replace the connector of the fuel boost pump canister of the APU. Inspect for fuel leaks and take applicable related investigative and corrective actions. Eventually replace the discrepant fuel BP canister connectors on affected airplanes.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
Within 5 months or 150 flight hours after issuance of the AD.
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
Bombardier, Inc. Model CL-600-2B16 (CL-601-3A, CL-601-3R, and CL-604 Variants) airplanes.
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
We are superseding Airworthiness Directive (AD) 2014-20-01 for certain Bombardier, Inc. Model CL-600-2B16 (CL-601-3A, CL-601-3R, and CL-604 Variants) airplanes. AD 2014-20-01 required repetitive inspections for any fuel leak in the right-hand landing lights compartment, and related investigative and corrective actions if necessary. AD 2014-20-01 also provides for an optional replacement of the connector of the fuel boost pump canister of the auxiliary power unit (APU), which terminates the repetitive inspections. This new AD requires replacing the connector of the fuel boost pump canister of the APU. This AD was prompted by the determination that a terminating action for the repetitive inspections is necessary. We are issuing this AD to detect and correct fuel leaks in the right-hand landing lights compartment, which, in combination with the heat generated by the taxi lights and landing lights on the ground reaching the auto-ignition temperature of the fuel, could result in ignition of any fuel or fumes present in the right-hand landing lights compartment.
Applicability Source Text
Show captured applicability text from the source AD
(c) Applicability
This AD applies to Bombardier, Inc. Model CL-600-2B16 (CL-601-
3A, CL-601-3R, and CL-604 Variants) airplanes, certificated in any
category, serial numbers 5906, 5910, 5912, 5917, 5919 through 5932
inclusive, 5934, 5935, 5939, 5940, 5942, and 5948.
Document Text
Show stored source text (verify against official source)
[Federal Register Volume 81, Number 97 (Thursday, May 19, 2016)]
[Rules and Regulations]
[Pages 31497-31500]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2016-11682]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2015-3634; Directorate Identifier 2014-NM-203-AD;
Amendment 39-18521; AD 2016-10-10]
RIN 2120-AA64
Airworthiness Directives; Bombardier, Inc. Airplanes
AGENCY: Federal Aviation Administration (FAA), Department of
Transportation (DOT).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: We are superseding Airworthiness Directive (AD) 2014-20-01 for
certain Bombardier, Inc. Model CL-600-2B16 (CL-601-3A, CL-601-3R, and
CL-604 Variants) airplanes. AD 2014-20-01 required repetitive
inspections for any fuel leak in the right-hand landing lights
compartment, and related investigative and corrective actions if
necessary. AD 2014-20-01 also provides for an optional replacement of
the connector of the fuel boost pump canister of the auxiliary power
unit (APU), which terminates the repetitive inspections. This new AD
requires replacing the connector of the fuel boost pump canister of the
APU. This AD was prompted by the determination that a terminating
action for the repetitive inspections is necessary. We are issuing this
AD to detect and correct fuel leaks in the right-hand landing lights
compartment, which, in combination with the heat generated by the taxi
lights and landing lights on the ground reaching the auto-ignition
temperature of the fuel, could result in ignition of any fuel or fumes
present in the right-hand landing lights compartment.
DATES: This AD becomes effective June 23, 2016.
The Director of the Federal Register approved the incorporation by
reference of a certain publication listed in this AD as of October 20,
2014 (79 FR 59640, October 3, 2014).
ADDRESSES: For service information identified in this finale rule,
contact Bombardier, Inc., 400 C[ocirc]te-Vertu Road West, Dorval,
Qu[eacute]bec H4S 1Y9, Canada; telephone 514-855-5000; fax 514-855-
7401; email <a href="/cdn-cgi/l/email-protection#d3a7bbb7fdb0a1b993b2b6a1bcfdb1bcbeb1b2a1b7bab6a1fdb0bcbe"><span class="__cf_email__" data-cfemail="1c687478327f6e765c7d796e73327e73717e7d6e7875796e327f7371">[email protected]</span></a>. You may view this referenced
service information at the FAA, Transport Airplane Directorate, 1601
Lind Avenue SW., Renton, WA. For information on the availability of
this material at the FAA, call 425-227-1221. It is also available on
the Internet at <a href="http://www.regulations.gov">http://www.regulations.gov</a> by searching for and
locating Docket No. FAA-2015-3634.
Examining the AD Docket
You may examine the AD docket on the Internet at <a href="http://www.regulations.gov">http://www.regulations.gov</a> by searching for and locating Docket No. FAA-2015-
3634; or in person at the Docket Management Facility between 9 a.m. and
5 p.m., Monday through Friday, except Federal holidays. The AD docket
contains this AD, the regulatory evaluation, any comments received, and
other information. The street address for the Docket Operations office
(telephone 800-647-5527) is Docket Management Facility, U.S. Department
of Transportation, Docket Operations,
[[Page 31498]]
M-30, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue
SE., Washington, DC.
FOR FURTHER INFORMATION CONTACT: Assata Dessaline, Aerospace Engineer,
Avionics and Services Branch, ANE-172, FAA, New York Aircraft
Certification Office (ACO), 1600 Stewart Avenue, Suite 410, Westbury,
NY 11590; telephone 516-228-7301; fax 516-794-5531.
SUPPLEMENTARY INFORMATION:
Discussion
We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR
part 39 to supersede AD 2014-20-01, Amendment 39-17974 (79 FR 59640,
October 3, 2014) (``AD 2014-20-01''). AD 2014-20-01 applied to certain
Bombardier, Inc. Model CL-600-2B16 (CL-601-3A, CL-601-3R, and CL-604
Variants) airplanes. The NPRM published in the Federal Register on
September 24, 2015 (80 FR 57543) (``the NPRM''). The NPRM was prompted
by the determination that a terminating action for the repetitive
inspections is necessary. The NPRM proposed to continue to require
repetitive inspections for any fuel leak in the right-hand landing
lights compartment, and related investigative and corrective actions.
The NPRM also provided an optional replacement of the connector of the
fuel boost pump canister of the APU, which terminates the repetitive
inspections. We are issuing this AD to detect and correct fuel leaks in
the right-hand landing lights compartment, which, in combination with
the heat generated by the taxi lights and landing lights on the ground
reaching the auto-ignition temperature of the fuel, could result in
ignition of any fuel or fumes present in the right-hand landing lights
compartment.
Transport Canada Civil Aviation (TCCA), which is the aviation
authority for Canada, has issued Canadian Emergency Airworthiness
Directive CF-2014-21, dated July 10, 2014 (referred to after this as
the Mandatory Continuing Airworthiness Information, or ``the MCAI''),
to correct an unsafe condition for certain Bombardier, Inc. Model CL-
600-2B16 (CL-601-3A, CL-601-3R, and CL-604 Variants) airplanes. The
MCAI states:
Bombardier, Inc. has discovered fuel leakage in the auxiliary
power unit (APU) fuel Boost Pump (BP) canister connector cavity. On
some of those aeroplanes, leakage was also noticed at the APU fuel
BP electrical conduit connection in the right hand landing light
compartment. The root cause of the subject fuel leak is identified
to be the improper length of the female connector keyway located in
the fuel BP canister, causing a shift of the electrical harness and
its seals.
Available data indicates that on a hot day, due to the heat
generated by the taxi light and/or landing lights on the ground,
temperature in the landing light compartment can reach the fuel auto
ignition temperature. Therefore, presence of any fuel in the right
hand landing light compartment is considered to be a safety hazard
[fuel or fumes present in the right-side landing lights compartment
might ignite] that warrants mitigating action.
In order to help mitigate the potential safety hazard
precipitated by any fuel leakage in the right hand landing light
compartment, Bombardier, Inc., has revised the Aircraft Flight
Manual (AFM) through Temporary Revisions (TRs) 604/38 and 605/20
dated 16 June 2014 to restrict the operation of Taxi and Landing
lights on the ground. Transport Canada issued Emergency [Canadian]
AD CF-2014-17 [(<a href="http://ad.easa.europa.eu/ad/CF-2014-17">http://ad.easa.europa.eu/ad/CF-2014-17</a>), which
corresponds to FAA AD 2014-15-17, Amendment 39-17919 (79 FR 44268,
July 31, 2014)] to mandate incorporation of the above AFM TRs.
To address the root cause of the subject fuel leakage from the
APU fuel boost pump canister wiring conduit, Bombardier, Inc. issued
Alert Service Bulletin (ASB) A605-28-008 that requires periodic
[repetitive general visual] inspection[s] for fuel leaks and
[applicable related investigative and corrective actions and]
eventually the replacement of the discrepant fuel BP canister
connectors [including related investigative and corrective actions]
on affected aeroplanes. The ASB has been revised to include an
additional inspection of the new connector wiring for damage and
this [Canadian] AD is issued to mandate the compliance with ASB
A605-28-008 Revision 2 requirements.
We also included compliance times for the terminating action. You may
examine the MCAI in the AD docket on the Internet at <a href="http://www.regulations.gov">http://www.regulations.gov</a> by searching for and locating Docket No. FAA-2015-
3634.
Comments
We gave the public the opportunity to participate in developing
this AD. The following presents the comments received on the NPRM and
the FAA's response to each comment.
Support for the NPRM
Mr. James Tyron stated that he supports the actions proposed in the
NPRM, and asserted that the time and cost of repetitively inspecting
these airplanes will be reduced as a result.
Request To Shorten a Certain Compliance Time
Mr. Connor McClintock requested that the connectors and wiring be
inspected immediately instead of within 5 months or 150 flight hours
after issuance of the AD, and those failing safety standards should
likewise be replaced immediately to reduce further risk of an
accidental fire. The commenter stated that the compliance times for
replacing APU boost pump connectors, as described in paragraph (j) of
the proposed AD, seems unnecessarily long. The commenter provided no
technical justification for reducing this proposed compliance time.
We disagree with changing the compliance times for replacing APU
boost pump connectors. AD 2014-15-17 revised the Aircraft Flight Manual
to restrict the operation of taxi and landing lights on the ground to
reduce the chance of a fire. In addition, the compliance time for
replacing the APU boost pump connectors was developed by the
manufacturer in concert with TCCA and it represents an interval that,
when combined with the mitigating actions in AD 2014-15-17, will reduce
the risk of fire. We have not changed the AD in this regard.
Conclusion
We reviewed the available data, including the comments received,
and determined that air safety and the public interest require adopting
this AD as proposed, except for minor editorial changes. We have
determined that these minor changes:
<bullet> Are consistent with the intent that was proposed in the
NPRM for correcting the unsafe condition; and
<bullet> Do not add any additional burden upon the public than was
already proposed in the NPRM.
Costs of Compliance
We estimate that this AD affects 92 airplanes of U.S. registry.
The actions required by AD 2014-20-01 and retained in this AD take
about 2 work-hours per product, at an average labor rate of $85 per
work-hour. Based on these figures, the estimated cost of the actions
that were required by AD 2014-20-01 is $170 per product.
We also estimate that it takes about 22 work-hours per product to
comply with the basic requirements of this AD. The average labor rate
is $85 per work-hour. Based on these figures, we estimate the cost of
this AD on U.S. operators to be $172,040, or $1,870 per product.
According to the manufacturer, some of the costs of this AD may be
covered under warranty, thereby reducing the cost impact on affected
individuals. We do not control warranty coverage for affected
individuals. As a result, we have included all costs in our cost
estimate.
[[Page 31499]]
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. ``Subtitle VII: Aviation
Programs,'' describes in more detail the scope of the Agency's
authority.
We are issuing this rulemaking under the authority described in
``Subtitle VII, Part A, Subpart III, Section 44701: General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
We determined that this AD will not have federalism implications
under Executive Order 13132. This AD will not have a substantial direct
effect on the States, on the relationship between the national
government and the States, or on the distribution of power and
responsibilities among the various levels of government.
For the reasons discussed above, I certify that this AD:
1. Is not a ``significant regulatory action'' under Executive Order
12866;
2. Is not a ``significant rule'' under the DOT Regulatory Policies
and Procedures (44 FR 11034, February 26, 1979);
3. Will not affect intrastate aviation in Alaska; and
4. Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
Accordingly, under the authority delegated to me by the
Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by removing Airworthiness Directive (AD)
2014-20-01, Amendment 39-17974 (79 FR 59640, October 3, 2014), and
adding the following new AD:
2016-10-10 Bombardier, Inc.: Amendment 39-18521. Docket No. FAA-
2015-3634; Directorate Identifier 2014-NM-203-AD.
(a) Effective Date
This AD becomes effective June 23, 2016.
(b) Affected ADs
This AD replaces AD 2014-20-01, Amendment 39-17974 (79 FR 59640,
October 3, 2014) (``AD 2014-20-01'').
(c) Applicability
This AD applies to Bombardier, Inc. Model CL-600-2B16 (CL-601-
3A, CL-601-3R, and CL-604 Variants) airplanes, certificated in any
category, serial numbers 5906, 5910, 5912, 5917, 5919 through 5932
inclusive, 5934, 5935, 5939, 5940, 5942, and 5948.
(d) Subject
Air Transport Association (ATA) of America Code 28, Fuel.
(e) Reason
This AD was prompted by a report of fuel leaks in the auxiliary
power unit (APU) fuel boost pump canister connector cavity and in
the right-hand landing lights compartment from the APU fuel boost
pump electrical conduit connection, and by a determination that
terminating action for the repetitive inspections is necessary. We
are issuing this AD to detect and correct fuel leaks in the right-
hand landing lights compartment, which, in combination with the heat
generated by the taxi lights and landing lights on the ground
reaching the auto-ignition temperature of the fuel, could result in
ignition of any fuel or fumes present in the right-hand landing
lights compartment.
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
(g) Retained Repetitive Inspections for Fuel Leaks, With No Changes
This paragraph restates the requirements of paragraph (g) of AD
2014-20-01, with no changes. Within 25 flight hours after October
20, 2014 (the effective date of AD 2014-20-01): Do a general visual
inspection for any fuel leak in the right-hand landing lights
compartment, and do all applicable related investigative and
corrective actions, in accordance with Part A of the Accomplishment
Instructions of Bombardier Alert Service Bulletin A605-28-008,
Revision 02, dated July 9, 2014, except as required by paragraph (h)
of this AD. Do all applicable related investigative and corrective
actions before further flight. Repeat the inspection thereafter at
intervals not to exceed 8 flight hours until the replacement
specified in paragraph (j) of this AD has been accomplished.
(h) Retained Corrective Action for Fuel Leak Found During Related
Investigative Actions, With No Changes
This paragraph restates the requirements of paragraph (h) of AD
2014-20-01, with no changes. If any fuel leak is found during the
related investigative actions required by paragraph (g) of this AD:
Before further flight, do the terminating action specified in
paragraph (j) of this AD, or do corrective actions using a method
approved by the Manager, New York Aircraft Certification Office
(ACO), ANE-170, FAA; or Transport Canada Civil Aviation (TCCA); or
Bombardier, Inc.'s TCCA Design Approval Organization (DAO). If
approved by the DAO, the approval must include the DAO-authorized
signature.
(i) Retained Inspection of Connector Wiring With No Changes
This paragraph restates the requirements of paragraph (j) of AD
2014-20-01, with no changes. For airplanes having new connectors
installed, as specified in Part B of the Accomplishment Instructions
of Bombardier Alert Service Bulletin A605-28-008, dated April 21,
2014: Within 6 months or 150 flight hours after October 20, 2014
(the effective date of AD 2014-20-01), whichever occurs first, do a
detailed inspection for damage (cuts) of the connector wiring, in
accordance with Part B of the Accomplishment Instructions of
Bombardier Alert Service Bulletin A605-28-008, Revision 02, dated
July 9, 2014. If any damage (cuts) is found on the wires, before
further flight, replace the wire with a new wire identified in kit
605K28-008A, in accordance with the Accomplishment Instructions of
Bombardier Alert Service Bulletin A605-28-008, Revision 02, dated
July 9, 2014.
(j) New Requirement: Terminating Action--Replacement of Connector
Within 6 months, or 150 flight hours, whichever occurs first,
after the effective date of this AD, replace the connector of the
fuel boost pump canister of the APU and do all applicable related
investigative actions, in accordance with Part B of the
Accomplishment Instructions of Bombardier Alert Service Bulletin
A605-28-008, Revision 02, dated July 9, 2014. Accomplishing this
replacement terminates the repetitive actions required by paragraph
(g) of this AD, provided that the following actions are done, as
applicable.
(1) If any damage (cuts) is found on the wires, before further
flight, replace the wire with a new wire identified in kit 605K28-
008A, in accordance with the Accomplishment Instructions of
Bombardier Alert Service Bulletin A605-28-008, Revision 02, dated
July 9, 2014.
(2) If any damage is found on an O-ring, before further flight,
replace the O-ring with a new O-ring, in accordance with the
Accomplishment Instructions of Bombardier Alert Service Bulletin
A605-28-008, Revision 02, dated July 9, 2014.
(3) If any fuel leak is found, before further flight, do
corrective actions using a method approved by the Manager, New York
ACO, ANE-170, FAA; or TCCA; or Bombardier,
[[Page 31500]]
Inc.'s TCCA DAO. If approved by the DAO, the approval must include
the DAO-authorized signature.
(k) Retained Credit for Previous Actions, With Revised Paragraph
Reference
This paragraph restates paragraph (k) of AD 2014-20-01, with a
revised paragraph reference. This paragraph provides credit for
actions required by paragraph (j) of this AD, if those actions were
performed before October 20, 2014 (the effective date of AD 2014-20-
01), using Bombardier Alert Service Bulletin A605-28-008, Revision
01, dated May 28, 2014, which is not incorporated by reference in
this AD.
(l) Other FAA AD Provisions
The following provisions also apply to this AD:
(1) Alternative Methods of Compliance (AMOCs): The Manager, New
York ACO, ANE-170, FAA, has the authority to approve AMOCs for this
AD, if requested using the procedures found in 14 CFR 39.19. In
accordance with 14 CFR 39.19, send your request to your principal
inspector or local Flight Standards District Office, as appropriate.
If sending information directly to the ACO, send it to ATTN: Program
Manager, Continuing Operational Safety, FAA, New York ACO, 1600
Stewart Avenue, Suite 410, Westbury, NY 11590; telephone 516-228-
7300; fax 516-794-5531. Before using any approved AMOC, notify your
appropriate principal inspector, or lacking a principal inspector,
the manager of the local flight standards district office/
certificate holding district office. The AMOC approval letter must
specifically reference this AD.
(2) Contacting the Manufacturer: As of the effective date of
this AD, for any requirement in this AD to obtain corrective actions
from a manufacturer, the action must be accomplished using a method
approved by the Manager, New York ACO, ANE-170, FAA; or TCCA; or
Bombardier, Inc.'s TCCA DAO. If approved by the DAO, the approval
must include the DAO-authorized signature.
(m) Related Information
(1) Refer to Mandatory Continuing Airworthiness Information
(MCAI) Canadian Emergency Airworthiness Directive CF-2014-21, dated
July 10, 2014, for related information. This MCAI may be found in
the AD docket on the Internet at <a href="http://www.regulations.gov">http://www.regulations.gov</a> by
searching for and locating Docket No. FAA-2015-3634.
(2) Service information identified in this AD that is not
incorporated by reference is available at the addresses specified in
paragraphs (n)(4) and (n)(5) of this AD.
(n) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless this AD specifies otherwise.
(3) The following service information was approved for IBR on
October 20, 2014 (79 FR 59640, October 3, 2014).
(i) Bombardier Alert Service Bulletin A605-28-008, Revision 02,
dated July 9, 2014.
(ii) Reserved.
(4) For service information identified in this AD, contact
Bombardier, Inc., 400 C[ocirc]te-Vertu Road West, Dorval,
Qu[eacute]bec H4S 1Y9, Canada; telephone 514-855-5000; fax 514-855-
7401; email <a href="/cdn-cgi/l/email-protection#35415d511b56475f755450475a1b575a58575447515c50471b565a58"><span class="__cf_email__" data-cfemail="8efae6eaa0edfce4ceefebfce1a0ece1e3eceffceae7ebfca0ede1e3">[email protected]</span></a>.
(5) You may view this service information at the FAA, Transport
Airplane Directorate, 1601 Lind Avenue SW., Renton, WA. For
information on the availability of this material at the FAA, call
425-227-1221.
(6) You may view this service information that is incorporated
by reference at the National Archives and Records Administration
(NARA). For information on the availability of this material at
NARA, call 202-741-6030, or go to: <a href="http://www.archives.gov/federal-register/cfr/ibr-locations.html">http://www.archives.gov/federal-register/cfr/ibr-locations.html</a>.
Issued in Renton, Washington, on May 9, 2016.
Michael Kaszycki,
Acting Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 2016-11682 Filed 5-18-16; 8:45 am]
BILLING CODE 4910-13-P
Source: Official FAA Source ↗
Retrieved: Apr 6, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.