AD 2014-26-09

final rule
Data completeness: 70%

Airworthiness Directives; Bombardier, Inc. Airplanes

AD Number
2014-26-09
Status
final_rule
Effective Date
Product Category
aircraft
Docket
Docket No. FAA-2014-0582
FR Citation
80 FR 1999

Applicability

TypeManufacturerModelDetails
aircraft Bombardier Various Airworthiness Directives; Bombardier, Inc. Airplanes

Unsafe Condition

Unannounced failure of two pitot static probe heaters, which could affect controllability of the airplane in icing conditions.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Modify the existing drain mast heater wiring to correct the fault-monitoring capabilities of the HBMU and eliminate the potential dormant failure of the number 2 pitot static probe heater. Retain the modification of air data probes and sensors as required by AD 2014-03-05.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Within 800 flight hours or 15 months after April 1, 2014, whichever occurs first.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

Bombardier, Inc. Model BD-700-1A10 airplanes equipped with any electrical wiring heater current/brake temperature monitor unit (HBMU) installed in accordance with specified FAA supplemental type certificates.

AI-generated summary from the source AD text. Verify against the official source before acting.

Source: Official FAA Source ↗

Retrieved: Apr 6, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.