AD 2012-04-04
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| engine | Pratt & Whitney Division | PW4050 | Airworthiness Directives; Pratt & Whitney Division Turbofan Engines |
| engine | Pratt & Whitney Division | PW4052 | Airworthiness Directives; Pratt & Whitney Division Turbofan Engines |
| engine | Pratt & Whitney Division | PW4056 | Airworthiness Directives; Pratt & Whitney Division Turbofan Engines |
| engine | Pratt & Whitney Division | PW4060 | Airworthiness Directives; Pratt & Whitney Division Turbofan Engines |
| engine | Pratt & Whitney Division | PW4060A | Airworthiness Directives; Pratt & Whitney Division Turbofan Engines |
| engine | Pratt & Whitney Division | PW4060C | Airworthiness Directives; Pratt & Whitney Division Turbofan Engines |
| engine | Pratt & Whitney Division | PW4062 | Airworthiness Directives; Pratt & Whitney Division Turbofan Engines |
| engine | Pratt & Whitney Division | PW4062A | Airworthiness Directives; Pratt & Whitney Division Turbofan Engines |
| engine | Pratt & Whitney Division | PW4152 | Airworthiness Directives; Pratt & Whitney Division Turbofan Engines |
| engine | Pratt & Whitney Division | PW4156 | Airworthiness Directives; Pratt & Whitney Division Turbofan Engines |
| engine | Pratt & Whitney Division | PW4156A | Airworthiness Directives; Pratt & Whitney Division Turbofan Engines |
| engine | Pratt & Whitney Division | PW4158 | Airworthiness Directives; Pratt & Whitney Division Turbofan Engines |
| engine | Pratt & Whitney Division | PW4160 | Airworthiness Directives; Pratt & Whitney Division Turbofan Engines |
| engine | Pratt & Whitney Division | PW4460 | Airworthiness Directives; Pratt & Whitney Division Turbofan Engines |
| engine | Pratt & Whitney Division | PW4462 | Airworthiness Directives; Pratt & Whitney Division Turbofan Engines |
| engine | Pratt & Whitney Division | PW4650 | Airworthiness Directives; Pratt & Whitney Division Turbofan Engines |
Unsafe Condition
Engine overspeed event during taxi resulted in a high-pressure compressor surge and tailpipe fire, prompting the need to address the design of the fuel metering units (FMUs).
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Replace Pratt & Whitney fuel metering units (FMUs), part numbers 53T335 (HS 801000-1), 55T423 (HS 801000-2), and 50U150 (HS 801000-3), at the next shop visit after the effective date of the AD.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
At the next shop visit after the effective date of the AD.
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
Pratt & Whitney PW4050, PW4052, PW4056, PW4060, PW4060A, PW4060C, PW4062, PW4062A, PW4152, PW4156, PW4156A, PW4158, PW4160, PW4460, PW4462, and PW4650 turbofan engines, including models with any dash number suffix.
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
We are adopting a new airworthiness directive (AD) for all Pratt & Whitney PW4050, PW4052, PW4056, PW4060, PW4060A, PW4060C, PW4062, PW4062A, PW4152, PW4156, PW4156A, PW4158, PW4160, PW4460, PW4462, and PW4650 turbofan engines, including models with any dash number suffix. This AD was prompted by an engine overspeed event that occurred during taxi and resulted in a high-pressure compressor surge and tailpipe fire. This AD requires replacing Pratt & Whitney fuel metering units (FMUs), part numbers (P/Ns) 53T335 (HS 801000-1), 55T423 (HS 801000-2), and 50U150 (HS 801000-3) at the next shop visit after the effective date of this AD. We are issuing this AD to prevent engine overspeed on these engines, which could result in an uncontained engine failure and damage to the airplane.
Applicability Source Text
Show captured applicability text from the source AD
(c) Applicability
This AD applies to all Pratt & Whitney Division PW4050, PW4052,
PW4056, PW4060, PW4060A, PW4060C, PW4062, PW4062A, PW4152, PW4156,
PW4156A, PW4158, PW4160, PW4460, PW4462, and PW4650 turbofan
engines, including models with any dash number suffix, with a Pratt
& Whitney fuel metering unit (FMU) part number (P/N) 53T335 (HS
801000-1), 55T423 (HS 801000-2), or 50U150 (HS 801000-3) installed.
Document Text
Show stored source text (verify against official source)
[Federal Register Volume 77, Number 41 (Thursday, March 1, 2012)]
[Rules and Regulations]
[Pages 12448-12450]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2012-4745]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2011-0944; Directorate Identifier 2011-NE-11-AD;
Amendment 39-16960; AD 2012-04-04]
RIN 2120-AA64
Airworthiness Directives; Pratt & Whitney Division Turbofan
Engines
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: We are adopting a new airworthiness directive (AD) for all
Pratt & Whitney PW4050, PW4052, PW4056, PW4060, PW4060A, PW4060C,
PW4062, PW4062A, PW4152, PW4156, PW4156A, PW4158, PW4160, PW4460,
PW4462, and PW4650 turbofan engines, including models with any dash
number suffix. This AD was prompted by an engine overspeed event that
occurred during taxi and resulted in a high-pressure compressor surge
and tailpipe fire. This AD requires replacing Pratt & Whitney fuel
metering units (FMUs), part numbers (P/Ns) 53T335 (HS 801000-1), 55T423
(HS 801000-2), and 50U150 (HS 801000-3) at the next shop visit after
the effective date of this AD. We are issuing this AD to prevent engine
overspeed on these engines, which could result in an uncontained engine
failure and damage to the airplane.
DATES: This AD is effective April 5, 2012.
The Director of the Federal Register approved the incorporation by
reference of a certain publication listed in the AD as of April 5,
2012.
ADDRESSES: For service information identified in this AD, contact Pratt
& Whitney, 400 Main St., East Hartford, CT 06108, phone: 860-565-8770.
You may review copies of the referenced service information at the FAA,
Engine & Propeller Directorate, 12 New England Executive Park,
Burlington, MA. For information on the availability of this material at
the FAA, call 781-238-7125.
Examining the AD Docket
You may examine the AD docket on the Internet at <a href="http://www.regulations.gov">http://www.regulations.gov</a>; or in person at the Docket Management Facility
between 9 a.m. and 5 p.m., Monday through Friday, except Federal
holidays. The AD docket contains this AD, the regulatory evaluation,
any comments received, and other information. The address for the
Docket Office (phone: 800-647-5527) is Document Management Facility,
U.S. Department of Transportation, Docket Operations, M-30, West
Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE.,
Washington, DC 20590.
FOR FURTHER INFORMATION CONTACT: James Gray, Aerospace Engineer, Engine
Certification Office, FAA, 12 New England Executive Park, Burlington,
MA 01803; phone: 781-238-7742; fax: 781-238-7199; email:
<a href="/cdn-cgi/l/email-protection#7f151e121a0c511a51180d1e063f191e1e51181009"><span class="__cf_email__" data-cfemail="5c363d31392f7239723b2e3d251c3a3d3d723b332a">[email protected]</span></a>.
SUPPLEMENTARY INFORMATION:
Discussion
We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR
part 39 to include an AD that would apply to the specified products.
That NPRM published in the Federal Register on November 7, 2011 (76 FR
68660). That NPRM proposed to require replacing the FMU, P/N 50U150, at
the next shop visit after the effective date of the proposed AD.
Comments
We gave the public the opportunity to participate in developing
this AD. The following presents the comments received on the proposal
and the FAA's response to each comment.
Request To Specify the Replacement FMU
Delta Airlines, Inc. requested that we specify replacing affected
FMUs with FMU P/N 53U044, or later FAA-approved P/Ns. The commenter
stated that doing this would help avoid potential alternative methods
of compliance questions, and issues with specifying compliance to a
service bulletin.
We do not agree. We only identify the affected parts requiring
removal in the AD, and the modification that is required to correct the
design. If we identified the replacement part by P/N, then, if and when
that part gets replaced by another P/N, the AD would have to be
superseded. We did not change the AD.
Request To Extend the Compliance Time
FedEx Express requested that we extend the compliance time from 60
months from the issue date of the proposed AD. The additional time is
needed to plan forced removals of the installed FMUs and implement an
effective modification planning program.
We do not agree. The compliance time specified in the AD is at the
next shop visit. The commenter is referring to an outdated version of
the service bulletin. We did not change the AD.
Request To Reference Hamilton Sundstrand Alert Service Bulletin (ASB)
No. JFC131-2-73-A24
Martinair Holland and United Airlines, Inc. requested that we also
reference Hamilton Sundstrand ASB No. JFC131-2-73-A24, Revision 1,
dated May 18, 2011, in the AD compliance, as that SB contains
information required to perform the FMU modification required by the
AD.
We agree. We changed the AD to incorporate by reference (IBR) only
that Hamilton Sundstrand ASB. That Hamilton Sundstrand ASB is also
included within the Pratt & Whitney ASB No. PW4ENG A73-220, Revision 1,
dated May 18, 2011, which we listed under Related Information.
Request To Add FMU Part Numbers
Martinair Holland, United Airlines, Inc. and United Parcel Service
Co. requested that we include Pratt & Whitney FMU P/Ns 53T335 and
55T423 with the existing P/N 50U150, in the AD, and also include the
equivalent Hamilton Sundstrand FMU P/Ns 801000-3, 801000-1, and 801000-
2.
We agree and added those P/Ns to the AD. The equivalent Hamilton
Sundstrand P/Ns are included in parentheses.
Request To Change Paragraph (f)
United Airlines, Inc. requested that we change paragraph (f) from
``install a modified FMU,'' to ``install a new or modified FMU.''
We agree. The intent of the AD is to install an FMU incorporating
the improvements of the modification, whether a new or modified FMU. We
changed paragraph (f) in the AD.
Request To Not Incorporate by Reference the Alert SB
United Airlines, Inc. requested that we not IBR Pratt & Whitney ASB
No. PW4ENG A73-220, Revision 1, dated May 18, 2011, but to instead
simply reference the ASB in the AD. The commenter stated that this
would allow them flexibility to perform the FMU modification using
their normal maintenance program and shop procedures.
[[Page 12449]]
We partially agree. We agree to change the AD to not IBR Pratt &
Whitney ASB No. PW4ENG A73-220, Revision 1, dated May 18, 2011. We do
not agree with the AD having no procedure IBRed to support use of a
normal maintenance program and shop procedures. We changed the AD to
IBR the portion of the Hamilton Sundstrand ASB No. JFC131-2-73-A24,
Revision 1, dated May 18, 2011, that contains the unique procedures
required to modify the FMUs.
Comment About a Potential Shortage of Parts
United Airlines, Inc. commented that a potential shortage of parts
could affect compliance with the AD.
We do not agree. Hamilton Sundstrand has worked to build up the FMU
inventory to support the expected demand, so meeting the compliance
time in the AD should not be a problem.
Request To Withdraw the Proposed AD
United Parcel Service Co. requested that we withdraw the proposed
AD. The commenter stated that since the overspeed incident occurred in
2006, there were several maintenance actions initiated by Pratt &
Whitney and implemented by operators to minimize the risk of further
incidents. The actions include reducing the overhaul soft time in the
maintenance planning guide for main fuel pumps, including in the engine
manual additional inspections of the FMU servo wash filter and transfer
fuel tubes, and clarifying the trouble shooting instructions in the
aircraft fault isolation manual to identify symptoms of clogged servo
wash filters.
We do not agree. The unsafe condition exists in the design of the
FMU, which must be addressed to prevent overspeed, potential
uncontained engine failure, and damage to the airplane. The actions
mentioned by the commenter were an interim plan to mitigate the risk of
an unsafe condition. However, they do not represent the final
corrective action. A servo wash filter clog followed by an overspeed
event represents a single point failure in the engine design which can
reasonably be expected to occur and which can result in a hazardous
engine effect (uncontained engine failure). Because of this, the engine
no longer meets the airworthiness standards to which it was certified.
The intent of this AD action is to return the engine to the same level
of safety provided by the airworthiness standards of its original
certification. We did not withdraw the AD.
Request To Change the Compliance Time
United Parcel Service Co. requested that we change the compliance
time to the next component shop visit or at the next engine shop visit
if the OEM recommended soft time is reached or exceeded. The commenter
stated that operators with a low hour-to-cycle ratio would typically
only overhaul the FMU at every other shop visit. The proposed AD
compliance would require removal at the next shop visit, which could
force removal of otherwise serviceable FMUs and add significant
incremental labor and repair costs to operators.
We do not agree. Performing the FMU replacement or modification at
the next component shop visit interval would not provide an acceptable
level of safety. We did not change the AD.
Request To Adjust the Cost of Compliance
United Parcel Service Co. requested that we adjust the cost of
compliance to include incremental costs for FMUs that will be forced
out of service before reaching the recommended overhaul soft time of
12,000 hours. The commenter states that the labor cost in the proposed
AD assumes that the FMU is already in the shop and disassembled for
normal FMU maintenance. It does not include labor hours that will be
required for receiving inspection, disassembly, test, and preparation
for shipment. The incremental cost of FMUs that are replaced before
reaching its soft time are also not taken into account.
We do not agree. FMUs can be modified to comply with the AD. They
do not need to be replaced with a new FMU. The cost of the AD includes
the required labor to perform the modification as well as the parts
cost for the upgrade kit. We consider only the actual cost of the AD;
not other costs. We did not change the AD.
Request To Replace FMUs On-Wing
United Parcel Service Co. requested that we include in the AD the
option to perform on-wing replacements of unmodified FMUs with new or
modified FMUs. The commenter stated that the proposed AD only requires
replacement at time of shop visit. Operators would then have to apply
for an alternative method of compliance to replace an FMU on-wing.
We partially agree. We agree that the operator could comply with
the AD before the engine reaches the shop if the operator chooses to
replace the FMU on-wing. We do not agree that a change to the AD is
required because the operator can take credit for actions already done.
Paragraph (e) of the AD states that you must comply with the AD within
the compliance times specified, unless already done. We did not change
the AD.
Request To Change the Installation Prohibition Paragraph
United Parcel Service Co. requested that we change the installation
prohibition paragraph (g) to prohibit installation of an unmodified FMU
within the 3-year compliance period after a modified FMU has been
installed. The commenter acknowledged that installation of an
unmodified FMU is prohibited once a modified FMU is installed, but this
is not explicitly stated in the proposed AD.
We do not agree. Once you comply with the AD by installing a
modified FMU in accordance with the AD at the next engine shop visit
after the effective date of the AD, or elect to comply with the AD by
installing a modified FMU before the next engine shop visit after the
effective date of this AD, the engine is in compliance with the AD and
you cannot undo that compliance. We did not change the AD.
Conclusion
We reviewed the relevant data, considered the comments received,
and determined that air safety and the public interest require adopting
the AD with the changes described previously.
Costs of Compliance
We estimate that this AD affects 750 engines installed on airplanes
of U.S. registry. We also estimate that it will take about 3.2 work-
hours per product to comply with this AD. The average labor rate is $85
per work-hour. Required parts will cost about $10,698 per engine. Based
on these figures, we estimate the cost of the AD to U.S. operators to
be $8,227,500.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. Subtitle VII: Aviation Programs,
describes in more detail the scope of the Agency's authority.
We are issuing this rulemaking under the authority described in
Subtitle VII, Part A, Subpart III, Section 44701: ``General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for
[[Page 12450]]
safety in air commerce. This regulation is within the scope of that
authority because it addresses an unsafe condition that is likely to
exist or develop on products identified in this rulemaking action.
Regulatory Findings
This AD will not have federalism implications under Executive Order
13132. This AD will not have a substantial direct effect on the States,
on the relationship between the national government and the States, or
on the distribution of power and responsibilities among the various
levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866,
(2) Is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979),
(3) Will not affect intrastate aviation in Alaska, and
(4) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
Accordingly, under the authority delegated to me by the
Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by adding the following new airworthiness
directive (AD):
2012-04-04 Pratt & Whitney: Amendment 39-16960; Docket No. FAA-2011-
0944; Directorate Identifier 2011-NE-11-AD.
(a) Effective Date
This AD is effective April 5, 2012.
(b) Affected ADs
None.
(c) Applicability
This AD applies to all Pratt & Whitney Division PW4050, PW4052,
PW4056, PW4060, PW4060A, PW4060C, PW4062, PW4062A, PW4152, PW4156,
PW4156A, PW4158, PW4160, PW4460, PW4462, and PW4650 turbofan
engines, including models with any dash number suffix, with a Pratt
& Whitney fuel metering unit (FMU) part number (P/N) 53T335 (HS
801000-1), 55T423 (HS 801000-2), or 50U150 (HS 801000-3) installed.
(d) Unsafe Condition
This AD was prompted by an engine overspeed event that occurred
during taxi and resulted in a high-pressure compressor surge and
tailpipe fire. We are issuing this AD to prevent engine overspeed on
these engines, which could result in an uncontained engine failure
and damage to the airplane.
(e) Compliance
Comply with this AD within the compliance times specified,
unless already done.
(f) Replacement of Affected FMUs
At the next shop visit after the effective date of this AD,
remove FMU P/Ns 53T335 (HS 801000-1), 55T423 (HS 801000-2), and
50U150 (HS 801000-3) and install an FMU that incorporates the
modification in paragraphs 3.C through 3.E of the Accomplishment
Instructions of Hamilton Sundstrand Alert Service Bulletin (ASB) No.
JFC131-2-73-A24, Revision 1, dated May 18, 2011.
(g) Installation Prohibition
After three years from the effective date of this AD, do not
install or reinstall an FMU P/N 53T335 (HS 801000-1), 55T423 (HS
801000-2), or 50U150 (HS 801000-3) onto any engine.
(h) Definition of Shop Visit
For the purpose of this AD, a shop visit is when the engine is
inducted into the shop for any maintenance involving the separation
of pairs of major mating engine flanges (lettered flanges). However,
the separation of engine flanges solely for the purposes of
transporting the engine without subsequent engine maintenance is not
an engine shop visit.
(i) Alternative Methods of Compliance (AMOCs)
The Manager, Engine Certification Office, FAA, has the authority
to approve AMOCs for this AD, if requested using the procedures
found in 14 CFR 39.19.
(j) Related Information
(1) For more information about this AD, contact James Gray,
Aerospace Engineer, Engine Certification Office, FAA, 12 New England
Executive Park, Burlington, MA 01803; phone: 781-238-7742; fax: 781-
238-7199; email: <a href="/cdn-cgi/l/email-protection#3b515a565e48155e155c495a427b5d5a5a155c544d"><span class="__cf_email__" data-cfemail="f298939f9781dc97dc9580938bb2949393dc959d84">[email protected]</span></a>.
(2) Pratt & Whitney ASB No. PW4ENG A73-220, Revision 1, dated
May 18, 2011, also pertains to this AD.
(k) Material Incorporated by Reference
(1) You must use Hamilton Sundstrand Alert Service Bulletin No.
JFC131-2-73-A24, Revision 1, dated May 18, 2011, to do the
modifications required by this AD, unless the AD specifies
otherwise. The Director of the Federal Register approved the
incorporation by reference (IBR) under 5 U.S.C. 552(a) and 1 CFR
part 51.
(2) For service information identified in this AD, contact
Hamilton Sundstrand, Technical Publications, Mail Stop 302-9, 4747
Harrison Avenue, P.O. Box 7002, Rockford, Illinois 61125-7002;
telephone 860-654-3575; fax 860-998-4564; email
<a href="/cdn-cgi/l/email-protection#2d59484e45035e424158594442435e6d455e0358594e034e4240"><span class="__cf_email__" data-cfemail="7b0f1e1813550814170e0f121415083b1308550e0f1855181416">[email protected]</span></a>; Internet <a href="http://www.hamiltonsundstrand.com">http://www.hamiltonsundstrand.com</a>, and Pratt & Whitney, 400 Main St. East
Hartford, CT 06108, phone: 860-565-8770.
(3) You may review copies of the service information at the FAA,
Engine & Propeller Directorate, 12 New England Executive Park,
Burlington, MA. For information on the availability of this material
at the FAA, call 781-238-7125.
(4) You may also review copies of the service information that
is incorporated by reference at the National Archives and Records
Administration (NARA). For information on the availability of this
material at NARA, call 202-741-6030, or go to: <a href="http://www.archives.gov/federal-register/cfr/ibr-locations.html">http://www.archives.gov/federal-register/cfr/ibr-locations.html</a>.
Issued in Burlington, Massachusetts, on February 15, 2012.
Peter A. White,
Manager, Engine & Propeller Directorate, Aircraft Certification
Service.
[FR Doc. 2012-4745 Filed 2-29-12; 8:45 am]
BILLING CODE 4910-13-P
Source: Official FAA Source ↗
Retrieved: Apr 6, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.