AD 2011-24-02
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | Gulfstream Aerospace Corporation | GV | Airworthiness Directives; Gulfstream Aerospace Corporation Model GV and GV-SP Airplanes |
| aircraft | Gulfstream Aerospace Corporation | GV-SP | Airworthiness Directives; Gulfstream Aerospace Corporation Model GV and GV-SP Airplanes |
Unsafe Condition
The third fire extinguisher bottle is mounted in a small-fragment impact zone, which could be penetrated by fragments released due to a failure of the APU rotor system, potentially causing the bottle to rupture and result in substantial damage to primary airframe structure and primary flight controls.
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Inspect to determine whether a third Halon fire extinguisher bottle is installed in the APU fragment impact zone. Revise the limitations section of the airplane flight manual to add restrictions for APU usage for certain airplanes having a third fire extinguisher bottle. Remove the third fire extinguisher bottle from certain airplanes.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
Before further flight
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
Gulfstream Aerospace Corporation Model GV and GV-SP airplanes.
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
We are adopting a new airworthiness directive (AD) for certain Gulfstream Aerospace Corporation Model GV and GV-SP airplanes. This AD was prompted by notification from the airplane manufacturer that the third fire extinguisher bottle is mounted in a small-fragment impact zone. This AD requires inspecting to determine whether a third Halon fire extinguisher bottle is installed in the auxiliary power unit (APU) fragment impact zone, revising the limitations section of the airplane flight manual to add restrictions for APU usage for certain airplanes having a third fire extinguisher bottle, and removing the third fire extinguisher bottle from certain airplanes. We are issuing this AD to prevent penetration of the bottle by fragments released due to a failure of the APU rotor system. The bottle could rupture and cause substantial damage to primary airframe structure and primary flight controls.
Applicability Source Text
Show captured applicability text from the source AD
(c) Applicability
This AD applies to the Gulfstream Aerospace Corporation
airplanes, certificated in any category, identified in paragraphs
(c)(1) and (c)(2) of this AD.
(1) Model GV airplanes having serial numbers (S/Ns) 501 and
subsequent.
(2) Model GV-SP airplanes having S/Ns 5001 through 5308
inclusive.
Document Text
Show stored source text (verify against official source)
[Federal Register Volume 76, Number 229 (Tuesday, November 29, 2011)]
[Rules and Regulations]
[Pages 73483-73486]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2011-29806]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2011-0572; Directorate Identifier 2011-NM-009-AD;
Amendment 39-16866; AD 2011-24-02]
RIN 2120-AA64
Airworthiness Directives; Gulfstream Aerospace Corporation Model
GV and GV-SP Airplanes
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: We are adopting a new airworthiness directive (AD) for certain
Gulfstream Aerospace Corporation Model GV and GV-SP airplanes. This AD
was prompted by notification from the airplane manufacturer that the
third fire extinguisher bottle is mounted in a small-fragment impact
zone. This AD requires inspecting to determine whether a third Halon
fire extinguisher bottle is installed in the auxiliary power unit (APU)
fragment impact zone, revising the limitations section of the airplane
flight manual to add restrictions for APU usage for certain airplanes
having a third fire extinguisher bottle, and removing the third fire
extinguisher bottle from certain airplanes. We are issuing this AD to
prevent penetration of the bottle by fragments released due to a
failure of the APU rotor system. The bottle could rupture and cause
substantial damage to primary airframe structure and primary flight
controls.
DATES: This AD is effective January 3, 2012.
The Director of the Federal Register approved the incorporation by
reference of certain publications listed in the AD as of January 3,
2012.
ADDRESSES: For service information identified in this AD, contact
Gulfstream Aerospace Corporation, Technical Publications Dept., P.O.
Box 2206, Savannah, Georgia 31402-2206; telephone (800) 810-4853; fax
(912) 965-3520; email <a href="/cdn-cgi/l/email-protection#6d1d180f1e2d0a18010b1e191f080c00430e0200"><span class="__cf_email__" data-cfemail="13636671605374667f7560676176727e3d707c7e">[email protected]</span></a>; Internet <a href="http://www.gulfstream.com/product_support/technical_pubs/pubs/index.htm">http://www.gulfstream.com/product_support/technical_pubs/pubs/index.htm</a>. You
may review copies of the referenced service information at the FAA,
Transport Airplane Directorate, 1601 Lind Avenue SW., Renton,
Washington. For information on the availability of this material at the
FAA, call (425) 227-1221.
Examining the AD Docket
You may examine the AD docket on the Internet at http://
[[Page 73484]]
www.regulations.gov; or in person at the Docket Management Facility
between 9 a.m. and 5 p.m., Monday through Friday, except Federal
holidays. The AD docket contains this AD, the regulatory evaluation,
any comments received, and other information. The address for the
Docket Office (phone: (800) 647-5527) is Document Management Facility,
U.S. Department of Transportation, Docket Operations, M-30, West
Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE.,
Washington, DC 20590.
FOR FURTHER INFORMATION CONTACT: Sanford Proveaux, Aerospace Engineer,
Continued Operational Safety and Certificate Management Branch, ACE-
102A, FAA, Atlanta Aircraft Certification Office (ACO) 1701 Columbia
Avenue, College Park, Georgia 30337; phone: (404) 474-5566; fax: (404)
474-5606; email: <a href="/cdn-cgi/l/email-protection#5a293b343c35283e742a28352c3f3b2f221a3c3b3b743d352c"><span class="__cf_email__" data-cfemail="1063717e767f62743e60627f6675716568507671713e777f66">[email protected]</span></a>.
SUPPLEMENTARY INFORMATION:
Discussion
We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR
part 39 to include an AD that would apply to the specified products.
That NPRM was published in the Federal Register on June 22, 2011 (76 FR
36392). That NPRM proposed to require inspecting to determine whether a
third Halon fire extinguisher bottle is installed in the auxiliary
power unit (APU) fragment impact zone, revising the limitations section
of the airplane flight manual to add restrictions for APU usage for
certain airplanes having a third fire extinguisher bottle, and removing
the third fire extinguisher bottle from certain airplanes.
Comments
We gave the public the opportunity to participate in developing
this AD. The following presents the comments received on the proposal
and the FAA's response to each comment.
Request To Include an Optional Terminating Action
Gulfstream Aerospace Corporation (Gulfstream) requested that we
revise the NPRM (76 FR 36392, June 22, 2011) to include an option for
terminating action by incorporation of the amended supplemental type
certificate (STC) ST01822AT-D, dated July 31, 2011. Gulfstream
explained that the amended STC relocates the third halon fire
extinguisher, and that Gulfstream could provide details of the amended
STC as required to support the wording in the final rule. Gulfstream
expressed that there is no need for a compliance time associated with
their proposed terminating action since the interim actions ``(APU
operating limitation and AFM [airplane flight manual] revision)'' will
be in place as required by the NPRM.
We disagree with the request to revise the final rule to include an
option for terminating action by incorporating the amended STC
ST01822AT-D, dated July 31, 2011. The Gulfstream documents required
(customer service bulletins and aircraft change instructions) for this
action are not yet available. However, under the provisions of
paragraph (l) of this final rule, we will consider requests for
approval of an option for a terminating action as an alternative method
of compliance if sufficient data are submitted to substantiate that the
new action would provide an acceptable level of safety. We have not
changed the AD in this regard.
Request for Clarification of Cost Analysis
Gulfstream also indicated that the cost analysis for the inspection
action is based on 1,000 airplanes whereas the AFM revision action is
based on 70 airplanes, and that the bottle removal action is based on
about 30 airplanes.
We infer that Gulfstream is requesting clarification on why 1,000
airplanes are inspected, but the on-condition action only applies to
certain airplanes. All airplanes must be inspected to determine if they
have the third fire extinguisher bottle and to determine if it is a
spare. Gulfstream's indication that the AFM revision action is based on
70 airplanes, and that the bottle removal action is based on about 30
airplanes, is only an estimate. We have not changed the AD in this
regard.
Conclusion
We reviewed the relevant data, considered the comment received, and
determined that air safety and the public interest require adopting the
AD as proposed--except for minor editorial changes. We have determined
that these minor changes:
<bullet> Are consistent with the intent that was proposed in the
NPRM (76 FR 36392, June 22, 2011) for correcting the unsafe condition;
and
<bullet> Do not add any additional burden upon the public than was
already proposed in the NPRM.
Interim Action
We consider this AD interim action. The manufacturer is currently
developing a modification that will address the unsafe condition
identified in this AD. Once this modification is developed, approved,
and available, we might consider additional rulemaking.
Costs of Compliance
We estimate that this AD affects 1,000 airplanes of U.S. registry.
We estimate the following costs to comply with this AD:
Estimated Costs
----------------------------------------------------------------------------------------------------------------
Parts Cost per Cost on U.S.
Action Labor cost cost product operators
----------------------------------------------------------------------------------------------------------------
Inspection.............................. 1 work-hour x $85 per hour = $85 $0 $85 $85,000
----------------------------------------------------------------------------------------------------------------
We estimate the following costs to do any necessary actions that
would be required based on the results of the inspection.
On-Condition Costs
----------------------------------------------------------------------------------------------------------------
Parts
Action Labor cost cost Cost per product
----------------------------------------------------------------------------------------------------------------
AFM revision.......................... 1 work-hour x $85 per hour = $0 $85 (about 70 GV/GV-SP
$85. airplanes).
Bottle removal........................ 1 work-hour x $85 per hour = 0 $85 (about 30 GV-SP
$85. airplanes).
----------------------------------------------------------------------------------------------------------------
[[Page 73485]]
According to the manufacturer, some of the costs of this AD may be
covered under warranty, thereby reducing the cost impact on affected
individuals. We do not control warranty coverage for affected
individuals. As a result, we have included all costs in our cost
estimate.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. Subtitle VII: Aviation Programs,
describes in more detail the scope of the Agency's authority.
We are issuing this rulemaking under the authority described in
Subtitle VII, Part A, Subpart III, Section 44701: ``General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
This AD will not have federalism implications under Executive Order
13132. This AD will not have a substantial direct effect on the States,
on the relationship between the national government and the States, or
on the distribution of power and responsibilities among the various
levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866,
(2) Is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979),
(3) Will not affect intrastate aviation in Alaska, and
(4) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
Accordingly, under the authority delegated to me by the
Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by adding the following new airworthiness
directive (AD):
2011-24-02 Gulfstream Aerospace Corporation: Amendment 39-16866;
Docket No. FAA-2011-0572; Directorate Identifier 2011-NM-009-AD.
(a) Effective Date
This AD is effective January 3, 2012.
(b) Affected ADs
None.
(c) Applicability
This AD applies to the Gulfstream Aerospace Corporation
airplanes, certificated in any category, identified in paragraphs
(c)(1) and (c)(2) of this AD.
(1) Model GV airplanes having serial numbers (S/Ns) 501 and
subsequent.
(2) Model GV-SP airplanes having S/Ns 5001 through 5308
inclusive.
(d) Subject
Joint Aircraft System Component (JASC)/Air Transport Association
(ATA) of America Code 2621, Fire bottle, fixed.
(e) Unsafe Condition
This AD was prompted by notification from the airplane
manufacturer that the third fire extinguisher bottle is mounted in a
small-fragment impact zone. We are issuing this AD to prevent
penetration of the bottle by fragments released due to a failure of
the auxiliary power unit (APU) rotor system. The bottle could
rupture and cause substantial damage to primary airframe structure
and primary flight controls.
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
(g) Inspection
For all airplanes: Within 21 days after the effective date of
this AD, or before removing the APU flight restrictions required by
AD 2009-17-01, Amendment 39-15991 (74 FR 40061, August 11, 2009),
whichever occurs first, inspect to determine whether a third Halon
fire extinguisher bottle for engines is installed in the APU
fragment impact zone (rotor fragment impact zone), in accordance
with the Accomplishment Instructions of the applicable Gulfstream
alert customer bulletin identified in table 1 of this AD.
Table 1--Applicable Gulfstream Alert Customer Bulletins
----------------------------------------------------------------------------------------------------------------
For model-- Use-- Which includes-- To the--
----------------------------------------------------------------------------------------------------------------
GV airplanes.................. Gulfstream V Alert Gulfstream GV/GV-SP Airplane Gulfstream GV AFM.
Customer Bulletin Flight Manual (AFM) Supplement
30A, dated December CE51 628M001, Revision A,
20, 2010. dated December 20, 2010.
GV-SP (G500) airplanes........ Gulfstream G500 Alert Gulfstream GV/GV-SP AFM Gulfstream GV-SP AFM.
Customer Bulletin Supplement CE51 628M001,
10A, dated December Revision A, dated December 20,
20, 2010. 2010.
GV-SP (G550) airplanes........ Gulfstream G550 Alert Gulfstream GV/GV-SP AFM Gulfstream GV-SP AFM.
Customer Bulletin Supplement CE51 628M001,
10A, dated December Revision A, dated December 20,
20, 2010. 2010.
----------------------------------------------------------------------------------------------------------------
(1) If the third fire extinguisher bottle is not installed, no
further work is required by this paragraph.
(2) For Model GV airplanes in which the third fire extinguisher
bottle is installed as a dedicated APU fire bottle configuration, as
defined in Gulfstream V Alert Customer Bulletin 30A, dated December
20, 2010 (as a functioning part of the aircraft fire suppression
system): Before further flight, revise the Limitations section of
the Gulfstream GV AFM to include the information in Gulfstream GV/
GV-SP AFM Supplement CE51 628M001, Revision A, dated December 20,
2010 (which is included in Gulfstream V Alert Customer Bulletin 30A,
dated December 20, 2010). This AFM supplement adds restrictions for
APU usage. Operate the airplane thereafter according to the
limitations in this AFM supplement.
Note 1: This may be done by inserting a copy of Gulfstream GV/
GV-SP AFM Supplement CE51 628M001, Revision A, dated December 20,
2010, in the applicable AFM. When information in this AFM supplement
has been included in general revisions of the applicable AFM, the
general revisions may be inserted in the applicable AFM, provided
the relevant information in the general revision is identical to
that in Gulfstream GV/GV-SP AFM Supplement CE51 628M001, Revision A,
dated December 20, 2010, and that AFM supplement may be removed.
(3) For Model GV and GV-SP airplanes in which the third fire
extinguisher bottle is installed as a spare fire bottle
configuration (not connected to the airplane's electrical or fire
suppression system), as defined in the
[[Page 73486]]
applicable Gulfstream alert customer bulletin identified in table 1
of this AD: Do the actions required by paragraph (g)(3)(i) or
(g)(3)(ii) of this AD.
(i) Before further flight, remove the bottle, in accordance with
the Accomplishment Instructions of the applicable Gulfstream alert
customer bulletin identified in table 1 of this AD.
(ii) Before further flight, revise the limitations section of
the applicable Gulfstream AFM specified in table 1 of this AD to
include the information in Gulfstream GV/GV-SP AFM Supplement CE51
628M001, Revision A, dated December 20, 2010. This AFM supplement
adds restrictions for APU usage. Operate the airplane thereafter
according to the limitations in that AFM supplement.
Note 2: This may be done by inserting a copy of Gulfstream GV/
GV-SP AFM Supplement CE51 628M001, Revision A, dated December 20,
2010, in the applicable AFM. When information in this AFM supplement
has been included in general revisions of the applicable AFM, the
general revisions may be inserted in the applicable AFM, provided
the relevant information in the general revision is identical to
that in Gulfstream GV/GV-SP AFM Supplement CE51 628M001, Revision A,
dated December 20, 2010, and that AFM supplement may be removed.
(h) Credit for Actions Accomplished in Accordance With Previous Service
Information
Actions accomplished before the effective date of this AD in
accordance with Gulfstream V Alert Customer Bulletin 30, dated
December 6, 2010, including Gulfstream GV/GV-SP AFM Supplement CE51
628M001, dated November 18, 2010 (for Model GV airplanes);
Gulfstream G550 Alert Customer Bulletin 10, dated December 6, 2010,
including Gulfstream GV/GV-SP AFM Supplement CE51 628M001, dated
November 18, 2010 (for Model GV airplanes); or G500 Alert Customer
Bulletin 10, dated December 6, 2010, including Gulfstream GV/GV-SP
AFM Supplement CE51 628M001, dated November 18, 2010 (for Model GV
airplanes), are acceptable for compliance with the corresponding
actions required by paragraph (g) of this AD.
(i) Parts Installation
As of the effective date of this AD, no person may install a
third fire extinguisher bottle in the APU fragment impact zone
(rotor fragment impact zone) of any airplane.
(j) No Reporting
Although the service information specified in paragraphs (j)(1),
(j)(2), and (j)(3) of this AD specify to submit certain information
to the manufacturer, this AD does not include that requirement.
(1) Gulfstream V Alert Customer Bulletin 30A, dated December 20,
2010, including Gulfstream GV/GV-SP AFM Supplement CE51 628M001,
Revision A, dated December 20, 2010, (for Model GV airplanes).
(2) Gulfstream G500 Alert Customer Bulletin 10A, dated December
20, 2010, including Gulfstream GV/GV-SP AFM Supplement CE51 628M001,
Revision A, dated December 20, 2010, (for Model GV-SP (G500)
airplanes).
(3) Gulfstream G550 Alert Customer Bulletin 10A, dated December
20, 2010, including Gulfstream GV/GV-SP AFM Supplement CE51 628M001,
Revision A, dated December 20, 2010, (for Model GV-SP (G550)
airplanes).
(k) Special Flight Permit
Special flight permits, as described in Section 21.197 and
Section 21.199 of the Federal Aviation Regulations (14 CFR 21.197
and 21.199), may be issued to operate the airplane to a location
where the requirements of this AD can be accomplished, provided the
following conditions are met:
(1) If an airplane is grounded due to a single generator
failure, the APU may be operated during a ferry flight, provided no
passengers are carried.
(2) Only the minimum required flight-crew is allowed on any
ferry flight.
(l) Alternative Methods of Compliance (AMOCs)
(1) The Manager, Atlanta Aircraft Certification Office (ACO),
FAA, has the authority to approve AMOCs for this AD, if requested
using the procedures found in 14 CFR 39.19. In accordance with 14
CFR 39.19, send your request to your principal inspector or local
Flight Standards District Office, as appropriate. If sending
information directly to the manager of the ACO, send it to the
attention of the person identified in the Related Information
section of this AD.
(2) Before using any approved AMOC, notify your appropriate
principal inspector, or lacking a principal inspector, the manager
of the local flight standards district office/certificate holding
district office.
(m) Related Information
For more information about this AD, contact Sanford Proveaux,
Aerospace Engineer, Continued Operational Safety and Certificate
Management Branch, ACE-102A, FAA, Atlanta Aircraft Certification
Office (ACO), 1701 Columbia Avenue, College Park, Georgia 30337;
telephone (404) 474-5566; fax (404) 474-5606; email:
<a href="/cdn-cgi/l/email-protection#e99a88878f869b8dc7999b869f8c889c91a98f8888c78e869f"><span class="__cf_email__" data-cfemail="f586949b939a8791db85879a839094808db5939494db929a83">[email protected]</span></a>.
(n) Material Incorporated by Reference
(1) You must use the following service information to do the
actions required by this AD, unless the AD specifies otherwise. The
Director of the Federal Register approved the incorporation by
reference (IBR) under 5 U.S.C. 552(a) and 1 CFR part 51 of the
following service information on the date specified:
(2) Gulfstream G500 Alert Customer Bulletin 10A, dated December
20, 2010, including Gulfstream GV/GV-SP airplane flight manual (AFM)
Supplement CE51 628M001, Revision A, dated December 20, 2010,
approved for IBR January 3, 2012.
(3) Gulfstream G550 Alert Customer Bulletin 10A, dated December
20, 2010, including Gulfstream GV/GV-SP AFM Supplement CE51 628M001,
Revision A, dated December 20, 2010, approved for IBR January 3,
2012.
(4) Gulfstream V Alert Customer Bulletin 30A, dated December 20,
2010, including Gulfstream GV/GV-SP AFM Supplement CE51 628M001,
Revision A, dated December 20, 2010, approved for IBR January 3,
2012.
(5) For service information identified in this AD, contact
Gulfstream Aerospace Corporation, Technical Publications Dept., P.O.
Box 2206, Savannah, Georgia 31402-2206; telephone (800) 810-4853;
fax (912) 965-3520; e-mail <a href="/cdn-cgi/l/email-protection#d5a5a0b7a695b2a0b9b3a6a1a7b0b4b8fbb6bab8"><span class="__cf_email__" data-cfemail="d0a0a5b2a390b7a5bcb6a3a4a2b5b1bdfeb3bfbd">[email protected]</span></a>; Internet <a href="http://www.gulfstream.com/product_support/technical_pubs/pubs/index.htm">http://www.gulfstream.com/product_support/technical_pubs/pubs/index.htm</a>.
You may review copies of the referenced service information at the
FAA.
(6) You may review copies of the service information at the FAA,
Transport Airplane Directorate, 1601 Lind Avenue SW., Renton,
Washington. For information on the availability of this material at
the FAA, call (425) 227-1221.
(7) You may also review copies of the service information that
is incorporated by reference at the National Archives and Records
Administration (NARA). For information on the availability of this
material at an NARA facility, call (202) 741-6030, or go to <a href="http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html">http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html</a>.
Issued in Renton, Washington, on November 8, 2011.
Kalene C. Yanamura,
Acting Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 2011-29806 Filed 11-28-11; 8:45 am]
BILLING CODE 4910-13-P
Source: Official FAA Source ↗
Retrieved: Apr 6, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.