AD 2011-09-05
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | The Boeing Company | 777-200 Series | Airworthiness Directives; The Boeing Company Model 777-200, -300, and -300ER Series Airplanes |
| aircraft | The Boeing Company | 777-300 Series | Airworthiness Directives; The Boeing Company Model 777-200, -300, and -300ER Series Airplanes |
| aircraft | The Boeing Company | 777-300ER Series | Airworthiness Directives; The Boeing Company Model 777-200, -300, and -300ER Series Airplanes |
Unsafe Condition
Potential ignition sources inside fuel tanks, which, in combination with flammable fuel vapors, could result in a fuel tank explosion and consequent loss of the airplane.
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Install an auto shutoff feature for the center override/jettison fuel pumps. Install power control circuitry for the center override/jettison and main jettison fuel pumps. Install new software in the electrical load management system (ELMS) electronics units in certain power management panels. Install AIMS-2 software in the AIMS-2 hardware. Make certain wiring changes.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
Before further flight
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
The Boeing Company Model 777-200, -300, and -300ER Series Airplanes.
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
We are adopting a new airworthiness directive (AD) for the products listed above. This AD requires installing an auto shutoff feature for the center override/jettison fuel pumps, and installing power control circuitry for the center override/jettison and main jettison fuel pumps. This AD also requires installing new software in the electrical load management system (ELMS) electronics units in certain power management panels; installing airplane information management system 2 (AIMS-2) software in the AIMS-2 hardware; and making certain wiring changes. This AD was prompted by results from fuel system reviews conducted by the manufacturer. We are issuing this AD to prevent potential ignition sources inside fuel tanks, which, in combination with flammable fuel vapors, could result in a fuel tank explosion and consequent loss of the airplane.
Document Text
Show stored source text (verify against official source)
[Federal Register Volume 76, Number 77 (Thursday, April 21, 2011)]
[Rules and Regulations]
[Pages 22305-22308]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2011-9283]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2010-1271; Directorate Identifier 2010-NM-187-AD;
Amendment 39-16667; AD 2011-09-05]
RIN 2120-AA64
Airworthiness Directives; The Boeing Company Model 777-200, -300,
and -300ER Series Airplanes
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: We are adopting a new airworthiness directive (AD) for the
products listed above. This AD requires installing an auto shutoff
feature for the center override/jettison fuel pumps, and installing
power control circuitry for the center override/jettison and main
jettison fuel pumps. This AD also requires installing new software in
the electrical load management system (ELMS) electronics units in
certain power management panels; installing airplane information
management system 2 (AIMS-2) software in the AIMS-2 hardware; and
making certain wiring changes. This AD was prompted by results from
fuel system reviews conducted by the manufacturer. We are issuing this
AD to prevent potential ignition sources inside fuel tanks, which, in
combination with flammable fuel vapors, could result in a fuel tank
explosion and consequent loss of the airplane.
DATES: This AD is effective May 26, 2011.
The Director of the Federal Register approved the incorporation by
reference of certain publications listed in the AD as of May 26, 2011.
ADDRESSES: For service information identified in this AD, contact
Boeing Commercial Airplanes, Attention: Data & Services Management,
P.O. Box 3707, MC 2H-65, Seattle, Washington 98124-2207; telephone 206-
544-5000, extension 1; fax 206-766-5680; e-mail
[[Page 22306]]
<a href="/cdn-cgi/l/email-protection#0c6169226e63696f63614c6e636965626b226f6361"><span class="__cf_email__" data-cfemail="107d753e727f75737f7d50727f75797e773e737f7d">[email protected]</span></a>; Internet <a href="https://www.myboeingfleet.com">https://www.myboeingfleet.com</a>. For GE
Aviation service information identified in this AD, contact GE
Aviation, Customer Services--Clearwater, P.O. Box 9013, Clearwater,
Florida 33758; telephone 727-539-1631; fax 727-539-0680; e-mail
<a href="/cdn-cgi/l/email-protection#2c4f5f025f595c5c435e586c4b49024f4341"><span class="__cf_email__" data-cfemail="197a6a376a6c6969766b6d597e7c377a7674">[email protected]</span></a>. You may review copies of the referenced service
information at the FAA, Transport Airplane Directorate, 1601 Lind
Avenue, SW., Renton, Washington. For information on the availability of
this material at the FAA, call 425-227-1221.
Examining the AD Docket
You may examine the AD docket on the Internet at <a href="http://www.regulations.gov">http://www.regulations.gov</a>; or in person at the Docket Management Facility
between 9 a.m. and 5 p.m., Monday through Friday, except Federal
holidays. The AD docket contains this AD, the regulatory evaluation,
any comments received, and other information. The address for the
Docket Office (phone: 800-647-5527) is Document Management Facility,
U.S. Department of Transportation, Docket Operations, M-30, West
Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590.
FOR FURTHER INFORMATION CONTACT: Georgios Roussos, Aerospace Engineer,
Systems and Equipment Branch, ANM-130S, FAA, Seattle Aircraft
Certification Office, 1601 Lind Avenue, SW., Renton, Washington 98057-
3356; phone: 425-917-6482; fax: 425-917-6590; e-mail:
<a href="/cdn-cgi/l/email-protection#7334161c01141a1c005d211c0600001c00331512125d141c05"><span class="__cf_email__" data-cfemail="96d1f3f9e4f1fff9e5b8c4f9e3e5e5f9e5d6f0f7f7b8f1f9e0">[email protected]</span></a>.
SUPPLEMENTARY INFORMATION:
Discussion
We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR
part 39 to include an airworthiness directive (AD) that would apply to
the specified products. That NPRM published in the Federal Register on
December 30, 2010 (75 FR 82337). That NPRM proposed to require
installing an auto shutoff feature for the center override/jettison
fuel pumps, and installing power control circuitry for the center
override/jettison and main jettison fuel pumps. That NPRM also proposed
to require installing new software in the electrical load management
system (ELMS) electronics units in certain power management panels;
installing airplane information management system 2 (AIMS-2) software
in the AIMS-2 hardware; and making certain wiring changes.
Comments
We gave the public the opportunity to participate in developing
this AD. The following presents the comments received on the proposal
and the FAA's response to each comment. Boeing supports the NPRM.
Request To Delay Issuance of AD To Specify Spring Washers Instead of
Conical Springs
Japan Airlines (JAL) requested that we delay issuance of the AD
until GE Aviation Service Bulletins 5000ELM-28-456 and 6000ELM-28-457,
both Revision 1, both dated January 7, 2010, are revised to correct
Figure 8. JAL stated that Figure 8 shows conical springs rather than
spring washers in the diagram. JAL stated that without this change,
operators will be required to request an alternate method of compliance
(AMOC).
We disagree with delaying issuance of this AD. However, we agree
that clarification is needed in regard to the use of spring washers.
Certain airplanes may use spring washers in lieu of conical springs in
their relay assembly. Both the conical springs and spring washers are
retained from the existing relay assembly to be used with the new
relay. Either one of them is considered acceptable for use. New
paragraph (m) has been added to the AD to identify the use of spring
washers as an acceptable method of compliance if they are part of the
existing relay assembly.
Request To Delay Issuance of AD To Specify Label Installation
JAL requested that we delay the issuance of this AD until GE
Aviation publishes new revisions to their service information
(referenced in the NPRM) to add another procedure to install labels or
separate the labels from the conversion kit. JAL explained that when it
receives the labels as part of the conversion kit, the remaining shelf
life of the labels is not adequate to allow the labels to be installed
on the airplanes. JAL is concerned that, unless the service information
is revised, these issues could delay incorporation of this AD or result
in multiple AMOC requests.
We disagree with the request to delay this AD until GE Aviation
issues revised service information. However, we agree with JAL's
concerns about the shelf life of the labels possibly affecting
operators' ability to comply with this AD within the required
compliance times. This AD requires all actions, including labeling, in
the Accomplishment Instructions of GE Aviation Service Bulletins
5000ELM-28-456 and 6000ELM-28-457, both Revision 1, both dated January
7, 2010, to be accomplished. We have added paragraph (n) to this AD to
provide an optional method of labeling.
Conclusion
We reviewed the relevant data, considered the comments received,
and determined that air safety and the public interest require adopting
the AD with the changes described previously. We have determined that
these changes:
<bullet> Are consistent with the intent that was proposed in the
NPRM for correcting the unsafe condition; and
<bullet> Do not add any additional burden upon the public than was
already proposed in the NPRM.
We also determined that these changes will not increase the
economic burden on any operator or increase the scope of the AD.
Costs of Compliance
We estimate that this AD affects 2 airplanes of U.S. registry.
We estimate the following costs to comply with this AD:
Estimated Costs
----------------------------------------------------------------------------------------------------------------
Parts Cost on U.S.
Action Labor cost cost Cost per product operators
----------------------------------------------------------------------------------------------------------------
Installation: Groups 1 and 2, 149 work-hours x $85 per $15,719 $28,384............ $56,768.
Configuration 2. hour = $12,665.
Installation: Groups 1 and 2, 2 work-hours x $85 per 15,719 $15,889............ $31,778.
Configuration 1. hour = $170.
Concurrent requirement: Install 3 work-hours x $85 per 0 $255............... $510.
ELMS software. hour = $255.
Concurrent requirement: Upgrade Up to 2 work-hours x $85 0 Up to $170......... Up to $340.
AIMS-2 software. per hour = Up to $170.
Concurrent requirement: P110 3 work-hours x $85 per $1,164 $1,419............. $2,838.
wiring changes. hour = $255.
[[Page 22307]]
Concurrent requirement: P210 3 work-hours x $85 per 1,164 $1,419............. $2,838.
wiring changes. hour = $255.
----------------------------------------------------------------------------------------------------------------
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. Subtitle VII: Aviation Programs,
describes in more detail the scope of the Agency's authority.
We are issuing this rulemaking under the authority described in
subtitle VII, part A, subpart III, section 44701: ``General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
This AD will not have federalism implications under Executive Order
13132. This AD will not have a substantial direct effect on the States,
on the relationship between the national government and the States, or
on the distribution of power and responsibilities among the various
levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866,
(2) Is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979),
(3) Will not affect intrastate aviation in Alaska, and
(4) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
Accordingly, under the authority delegated to me by the
Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by adding the following new airworthiness
directive (AD):
2011-09-05 The Boeing Company: Amendment 39-16667; Docket No. FAA-
2010-1271; Directorate Identifier 2010-NM-187-AD.
Effective Date
(a) This AD is effective May 26, 2011.
Affected ADs
(b) None.
Applicability
(c) The Boeing Company Model 777-200, -300, and -300ER series
airplanes; certificated in any category; as identified in Boeing
Service Bulletin 777-28A0047, Revision 5, dated September 20, 2010.
Subject
(d) Joint Aircraft System Component (JASC)/Air Transport
Association (ATA) of America Code 28, Fuel.
Unsafe Condition
(e) This AD was prompted by results from fuel system reviews
conducted by the manufacturer. We are issuing this AD to prevent
potential ignition sources inside fuel tanks, which, in combination
with flammable fuel vapors, could result in a fuel tank explosion
and consequent loss of the airplane.
Compliance
(f) Comply with this AD within the compliance times specified,
unless already done.
Installation
(g) For airplanes in Groups 1 and 2, Configuration 2, as
identified in Boeing Service Bulletin 777-28A0047, Revision 5, dated
September 20, 2010: Within 36 months after the effective date of
this AD, install a new P301 panel on the left side of the airplane,
install a new P302 panel on the right side of the airplane, and
change the wiring, in accordance with the Accomplishment
Instructions of Boeing Service Bulletin 777-28A0047, Revision 5,
dated September 20, 2010, except as required by paragraphs (m) and
(n) of this AD.
(h) For airplanes in Groups 1 and 2, Configuration 1, as
identified in Boeing Service Bulletin 777-28A0047, Revision 5, dated
September 20, 2010: Within 36 months after the effective date of
this AD, perform bonding resistance measurements and rework the
airplane installation as applicable, depending on airplane
configuration, in accordance with the Accomplishment Instructions of
Boeing Service Bulletin 777-28A0047, Revision 5, dated September 20,
2010.
Concurrent Requirements
(i) Prior to or concurrently with accomplishing the requirements
of paragraph (g) of this AD, do the actions specified in paragraphs
(i)(1), (i)(2), (i)(3), and (i)(4) of this AD.
(1) Install new software in the electrical load management
system (ELMS) electronics units in the P110, P210, and P310 power
management panels, in accordance with the Accomplishment
Instructions of Boeing Service Bulletin 777-28A0040, Revision 1,
dated March 18, 2010.
(2) Install airplane information management system 2 (AIMS-2)
software in the AIMS-2 hardware, in accordance with the
Accomplishment Instructions of Boeing Special Attention Service
Bulletin 777-31-0097, Revision 3, dated February 22, 2007.
(3) Modify the P110 left power management panel by incorporating
wiring changes, in accordance with the Accomplishment Instructions
of GE Aviation Service Bulletin 5000ELM-28-456, Revision 1, dated
January 7, 2010, except as provided by paragraphs (m) and (n) of
this AD.
(4) Modify the P210 right power management panel by
incorporating wiring changes, in accordance with the Accomplishment
Instructions of GE Aviation Service Bulletin 6000ELM-28-457,
Revision 1, dated January 7, 2010, except as provided by paragraphs
(m) and (n) of this AD.
Credit for Actions Accomplished in Accordance With Previous Service
Information
(j) Installations done before the effective date of this AD in
accordance with Boeing Alert Service Bulletin 777-28A0040, dated
April 13, 2007, are acceptable for compliance with the requirements
of paragraph (i)(1) of this AD.
(k) Installations done before the effective date of this AD in
accordance with Boeing Service Bulletin 777-28A0047, Revision 3,
dated June 11, 2009; or Revision 4, dated May 20, 2010; are
acceptable for compliance with the requirements of paragraphs (g)
and (h) of this AD.
(l) Installations done before the effective date of this AD in
accordance with Boeing Special Attention Service Bulletin 777-31-
0097, dated March 30, 2006; Revision 1, dated August 10, 2006; or
Revision 2, dated October 26, 2006; are acceptable for
[[Page 22308]]
compliance with the requirements of paragraph (i)(2) of this AD.
Optional Methods of Compliance With Certain Actions
(m) Where paragraph 2.A.(16) and Figure 8 of GE Aviation Service
Bulletins 5000ELM-28-456 and 6000ELM-28-457, both Revision 1, both
dated January 7, 2010, identify the installation of conical springs
for the relay to relay base fixing, installation of spring washers
is an acceptable method of compliance when they are part of the
existing relay assembly.
(n) Where paragraphs 2.A.(24) and 2.A.(25) of GE Aviation
Service Bulletins 5000ELM-28-456 and 6000ELM-28-457, both Revision
1, both dated January 7, 2010, specify the installation of a label
to identify work carried out and to identify the appropriate service
bulletin, an acceptable method of compliance is to use a suitable
method to indelibly mark the appropriate service bulletin number on
the reworked panel. Boeing Standard BAC5307 may be used as an
additional source of guidance for part marking.
Alternative Methods of Compliance (AMOCs)
(o)(1) The Manager, Seattle Aircraft Certification Office (ACO),
FAA, has the authority to approve AMOCs for this AD, if requested
using the procedures found in 14 CFR 39.19. In accordance with 14
CFR 39.19, send your request to your principal inspector or local
Flight Standards District Office, as appropriate. If sending
information directly to the manager of the ACO, send it to the
attention of the person identified in the Related Information
section of this AD. Information may be e-mailed to: <a href="/cdn-cgi/l/email-protection#320b1f737c7f1f61575346465e571f73717d1f737f7d711f6057434757414641725453531c555d44"><span class="__cf_email__" data-cfemail="c0f9ed818e8ded93a5a1b4b4aca5ed81838fed818d8f83ed92a5b1b5a5b3b4b380a6a1a1eea7afb6">[email protected]</span></a>.
(2) Before using any approved AMOC, notify your appropriate
principal inspector or lacking a principal inspector, the manager of
the local flight standards district office/certificate holding
district office.
Related Information
(p) For more information about this AD, contact Georgios
Roussos, Aerospace Engineer, Systems and Equipment Branch, ANM-130S,
FAA, Seattle Aircraft Certification Office, 1601 Lind Avenue, SW.,
Renton, Washington 98057-3356; phone: 425-917-6482; fax: 425-917-
6590; e-mail: <a href="/cdn-cgi/l/email-protection#0641636974616f697528546973757569754660676728616970"><span class="__cf_email__" data-cfemail="a9eeccc6dbcec0c6da87fbc6dcdadac6dae9cfc8c887cec6df">[email protected]</span></a>.
Material Incorporated by Reference
(q) You must use the applicable service information contained in
table 1 of this AD to do the actions required by this AD, unless the
AD specifies otherwise.
Table 1--All Material Incorporated by Reference
------------------------------------------------------------------------
Document Revision Date
------------------------------------------------------------------------
Boeing Service Bulletin 777- 5 September 20, 2010.
28A0047.
Boeing Service Bulletin 777- 1 March 18, 2010.
28A0040.
Boeing Special Attention 3 February 22, 2007.
Service Bulletin 777-31-
0097.
GE Aviation Service Bulletin 1 January 7, 2010.
5000ELM-28-456.
GE Aviation Service Bulletin 1 January 7, 2010.
6000ELM-28-457.
------------------------------------------------------------------------
(1) The Director of the Federal Register approved the
incorporation by reference of the service information contained in
Table 1 of this AD under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) For Boeing service information identified in this AD,
contact Boeing Commercial Airplanes, Attention: Data & Services
Management, P.O. Box 3707, MC 2H-65, Seattle, Washington 98124-2207;
telephone 206-544-5000, extension 1; fax 206-766-5680; e-mail
<a href="/cdn-cgi/l/email-protection#4429216a262b21272b2904262b212d2a236a272b29"><span class="__cf_email__" data-cfemail="c2afa7eca0ada7a1adaf82a0ada7abaca5eca1adaf">[email protected]</span></a>; Internet <a href="https://www.myboeingfleet.com">https://www.myboeingfleet.com</a>. For GE
Aviation service information identified in this AD, contact GE
Aviation, Customer Services--Clearwater, P.O. Box 9013, Clearwater,
Florida 33758; telephone 727-539-1631; fax 727-539-0680; e-mail
<a href="/cdn-cgi/l/email-protection#95f6e6bbe6e0e5e5fae7e1d5f2f0bbf6faf8"><span class="__cf_email__" data-cfemail="7c1f0f520f090c0c130e083c1b19521f1311">[email protected]</span></a>.
(3) You may review copies of the service information at the FAA,
Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton,
Washington. For information on the availability of this material at
the FAA, call 425-227-1221.
(4) You may also review copies of the service information that
is incorporated by reference at the National Archives and Records
Administration (NARA). For information on the availability of this
material at an NARA facility, call 202-741-6030, or go to <a href="http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html">http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html</a>.
Issued in Renton, Washington, on April 12, 2011.
Ali Bahrami,
Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 2011-9283 Filed 4-20-11; 8:45 am]
BILLING CODE 4910-13-P
Source: Official FAA Source ↗
Retrieved: Apr 6, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.