AD 2008-13-14
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | Embraer | Various | Airworthiness Directives; Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model EMB-135ER, -135KE, -135KL, and -135LR Airplanes, and Model EMB-145, -145ER, -145MR, -145LR, -145XR, -145MP, and -145EP Airplanes |
| aircraft | Aviat | Various | Airworthiness Directives; Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model EMB-135ER, -135KE, -135KL, and -135LR Airplanes, and Model EMB-145, -145ER, -145MR, -145LR, -145XR, -145MP, and -145EP Airplanes |
Unsafe Condition
Fuel system reassessment, performed according to RBHA-E88/SFAR-88, requires the inclusion of new maintenance tasks in the Critical Design Configuration Control Limitations (CDCCL) and in the Fuel System Limitations (FSL), necessary to preclude ignition sources in the fuel system.
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Revise the Airworthiness Limitations Section (ALS) of the Instructions for Continued Airworthiness (ICA) to incorporate new limitations for fuel tank systems.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
Within 90 days after December 16, 2008.
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model EMB-135ER, -135KE, -135KL, and -135LR Airplanes, and Model EMB-145, -145ER, -145MR, -145LR, -145XR, -145MP, and -145EP Airplanes.
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
We are adopting a new airworthiness directive (AD) for the products listed above. This AD results from mandatory continuing airworthiness information (MCAI) originated by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as:
Document Text
Show stored source text (verify against official source)
[Federal Register Volume 73, Number 123 (Wednesday, June 25, 2008)]
[Rules and Regulations]
[Pages 35904-35907]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: E8-13924]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2008-0182; Directorate Identifier 2007-NM-262-AD;
Amendment 39-15577; AD 2008-13-14]
RIN 2120-AA64
Airworthiness Directives; Empresa Brasileira de Aeronautica S.A.
(EMBRAER) Model EMB-135ER, -135KE, -135KL, and -135LR Airplanes, and
Model EMB-145, -145ER, -145MR, -145LR, -145XR, -145MP, and -145EP
Airplanes
AGENCY: Federal Aviation Administration (FAA), Department of
Transportation (DOT).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: We are adopting a new airworthiness directive (AD) for the
products listed above. This AD results from mandatory continuing
airworthiness information (MCAI) originated by an aviation authority of
another country to identify and correct an unsafe condition on an
aviation product. The MCAI describes the unsafe condition as:
Fuel system reassessment, performed according to RBHA-E88/SFAR-
88 (Regulamento Brasileiro de Homologacao Aeronautica 88/Special
Federal Aviation Regulation No. 88), requires the inclusion of new
maintenance tasks in the Critical Design Configuration Control
Limitations (CDCCL) and in the Fuel System Limitations (FSL),
necessary to preclude ignition sources in the fuel system. * * *
We are issuing this AD to require actions to correct the unsafe
condition on these products.
DATES: This AD becomes effective July 30, 2008.
The Director of the Federal Register approved the incorporation by
reference of a certain publication listed in this AD as of July 30,
2008.
ADDRESSES: You may examine the AD docket on the Internet at <a href="http://www.regulations.gov">http://www.regulations.gov</a> or in person at the U.S. Department of
Transportation, Docket Operations, M-30, West Building Ground Floor,
Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC.
FOR FURTHER INFORMATION CONTACT: Sanjay Ralhan, Aerospace Engineer,
International Branch, ANM-116, Transport Airplane Directorate, FAA,
1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425)
227-1405; fax (425) 227-1149.
SUPPLEMENTARY INFORMATION:
Discussion
We issued a supplemental notice of proposed rulemaking (NPRM) to
amend 14 CFR part 39 to include an AD that would apply to the specified
products. That supplemental NPRM was published in the Federal Register
on May 7, 2008 (73 FR 25609). That supplemental NPRM proposed to
correct an unsafe condition for the specified products. The MCAI
states:
Fuel system reassessment, performed according to RBHA-E88/SFAR-
88, requires the inclusion of new maintenance tasks in the Critical
Design Configuration Control Limitations (CDCCL) and in the Fuel
System Limitations (FSL), necessary to preclude ignition sources in
the fuel system. * * *
The corrective action is revising the Airworthiness Limitations Section
(ALS) of the Instructions for Continued Airworthiness (ICA) to
incorporate new limitations for fuel tank systems. You may obtain
further information by examining the MCAI in the AD docket.
Comments
We gave the public the opportunity to participate in developing
this AD. We considered the comments received.
Request To Revise Inspections
ExpressJet requests that we revise two tasks, ``28-41-01-720-001-
A00 and 28-41-01-720-A00,'' specified in Table 1 of the supplemental
NPRM. The commenter states that these tasks are related to a functional
check of the component rather than the aircraft system. The commenter
suggests that we identify these two components by part number and
require the inspections be done before the part accumulates 10,000
flight hours since new or 10,000 flight hours since the last functional
check.
We agree with the commenter that tasks 28-41-01-720-001-A00 and 28-
41-04-720-001-A00 are related to a functional check of the component
rather than the aircraft system (the commenter referred to task 28-41-
01-720-A00, which is not listed in Table 1; we infer that the commenter
intended to refer to task 28-41-04-720-001-A00). Prior to the commenter
submitting its comment, the commenter raised the issue during a visit
by the FAA. Since then we have discussed the issue with the
manufacturer and with the Ag[ecirc]ncia Nacional de
Avia[ccedil][atilde]o Civil (ANAC),
[[Page 35905]]
which is the aviation authority for Brazil. ANAC states that it intends
to issue an airworthiness directive to address an inspection threshold
for these tasks. Therefore, we have removed these tasks from Table 1 of
this AD. We might consider further rulemaking once new actions and
compliance times for these tasks are identified by ANAC or in absence
of any new action from ANAC, we might consider unilateral rulemaking.
Requests To Extend Compliance Times/Include Costs of Unscheduled
Inspections
ExpressJet and EMBRAER request that we extend the compliance times
specified in Table 1 of the supplemental NPRM. ExpressJet states that
the compliance times for the inspections specified in Table 1 of the
supplemental NPRM are confusing. ExpressJet notes that the ``Grace
Period'' is ``Within 90 days after the effective date of this AD,'' but
the effective date of the AD is not stated and the compliance time for
revising the ALS of the ICA is before December 16, 2008. ExpressJet
recommends that we revise the ``Grace Period'' to within 90 days after
December 16, 2008.
EMBRAER states that the compliance time ``within 90 days of the
effective date of the AD'' for airplanes with cycle totals above the
thresholds would require airplanes to be removed from service for
special inspections and that these inspections would require the fuel
tanks to be drained and ventilated prior to inspection. EMBRAER states
that requiring unscheduled tank inspections will increase the
probability of maintenance error, which will result in an increase in
the risk of ignition sources. EMBRAER believes that there is no special
risk that justifies the compliance time of within 90 days from the
effective date of the AD and suggests that the compliance time be
revised to within 5,000 flight hours after the effective date of the
AD.
EMBRAER also requests that if the compliance time of within 90 days
after the effective date of the AD is retained, we include the costs of
unscheduled inspections. EMBRAER notes that the costs of unscheduled
inspections would be higher than the estimate given in the promulgation
of Special Federal Aviation Regulation No. 88 of between 60 and 330
work-hours for the inspection and between 36 and 96 hours for time out
of service.
We agree to extend the ``Grace Period'' specified in Table 1 of
this AD. We agree with ExpressJet that the compliance time of within 90
days after December 16, 2008 is appropriate. We have determined that
the new compliance time will ensure an acceptable level of safety. We
have revised Table 1 of this AD accordingly.
However, we do not agree with EMBRAER to defer the first mandatory
inspections to within 5,000 flight hours after the effective date of
the AD. In revising the appropriate compliance time for the inspections
(i.e., extending the ``Grace Period'' to within 90 days after December
16, 2008), we considered the urgency associated with the subject unsafe
condition, the availability of required parts, and the practical aspect
of accomplishing the required inspections within a period of time that
corresponds to the normal scheduled maintenance for most affected
operators. If an operator decides that more time is needed to comply
with the AD, the operator can request an alternative method of
compliance (AMOC) in accordance with the provisions of paragraph (g)(1)
of the supplemental NPRM.
As stated earlier, we have extended the compliance time and
therefore the number of unscheduled inspections should be reduced.
However, because operators' schedules vary substantially, it would be
nearly impossible for us to accurately calculate all costs associated
with unscheduled inspections. Therefore, we have not revised the Costs
of Compliance section of this AD to reflect unscheduled inspections.
However, we have revised the Costs of Compliance section of this AD to
reflect a change in the number of airplanes affected by this AD from
704 (as specified in the supplemental NPRM) to 668 airplanes.
Request To Clarify Actions
ExpressJet notes that paragraph (f)(2) of the supplemental NPRM
states ``Before December 16, 2008, revise the ALS of the ICA * * *.''
ExpressJet states that it assumes that this is referring to the
operator's ICA.
We infer that ExpressJet is requesting clarification of the actions
in this AD. The wording that was used represents a standard approach
and has been used for many years. The intent is to have all
airworthiness limitations, regardless of whether imposed by original
type certification or by a later AD, located in one immediately
recognizable document. In 1980, the FAA identified the Airworthiness
Limitations section of the Instructions for Continued Airworthiness as
the appropriate document.
We consider that not having all airworthiness limitations in one
document could lead to confusion as to what is or what is not a
mandatory maintenance action as identified in Federal Aviation
Regulation, part 25, Appendix H, section H25.4. This is the basis of
our requirement to have each operator maintain a current copy of the
Airworthiness Limitations section. Concerning ExpressJet's statement
that the AD is referring to the operator's ICA, we infer that the
commenter is wondering if, after revising its copy of the Airworthiness
Limitation section, there are other required actions such as ensuring
that the operator's maintenance program is updated to incorporate the
actions specified in the revised Airworthiness Limitations.
Ensuring that operators' maintenance programs and the actions of
its maintenance personnel are in accordance with the Airworthiness
Limitations is required, but not by this AD. 14 CFR 91.403(c) specifies
that no person may operate an aircraft for which airworthiness
limitations have been issued unless those limitations have been
complied with. Therefore, there is no need to further expand the
requirements of the AD beyond that which was proposed because section
91.403(c) already imposes the appropriate required action after the
airworthiness limitations are revised. We have not changed this AD in
this regard.
Conclusion
We reviewed the available data, including the comments received,
and determined that air safety and the public interest require adopting
the AD with the changes described previously. We determined that these
changes will not increase the economic burden on any operator or
increase the scope of the AD.
Differences Between This AD and the MCAI or Service Information
We have reviewed the MCAI and related service information and, in
general, agree with their substance. But we might have found it
necessary to use different words from those in the MCAI to ensure the
AD is clear for U.S. operators and is enforceable. In making these
changes, we do not intend to differ substantively from the information
provided in the MCAI and related service information.
We might also have required different actions in this AD from those
in the MCAI in order to follow our FAA policies. Any such differences
are highlighted in a Note within the AD.
Costs of Compliance
We estimate that this AD will affect 668 products of U.S. registry.
We also estimate that it will take about 1 work-
[[Page 35906]]
hour per product to comply with the basic requirements of this AD. The
average labor rate is $80 per work-hour. Based on these figures, we
estimate the cost of this AD to the U.S. operators to be $53,440, or
$80 per product.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. ``Subtitle VII: Aviation
Programs,'' describes in more detail the scope of the Agency's
authority.
We are issuing this rulemaking under the authority described in
``Subtitle VII, Part A, Subpart III, Section 44701: General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
We determined that this AD will not have federalism implications
under Executive Order 13132. This AD will not have a substantial direct
effect on the States, on the relationship between the national
government and the States, or on the distribution of power and
responsibilities among the various levels of government.
For the reasons discussed above, I certify this AD:
1. Is not a ``significant regulatory action'' under Executive Order
12866;
2. Is not a ``significant rule'' under the DOT Regulatory Policies
and Procedures (44 FR 11034, February 26, 1979); and
3. Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
We prepared a regulatory evaluation of the estimated costs to
comply with this AD and placed it in the AD docket.
Examining the AD Docket
You may examine the AD docket on the Internet at <a href="http://www.regulations.gov">http://www.regulations.gov</a>; or in person at the Docket Operations office
between 9 a.m. and 5 p.m., Monday through Friday, except Federal
holidays. The AD docket contains the NPRM, the regulatory evaluation,
any comments received, and other information. The street address for
the Docket Operations office (telephone (800) 647-5527) is in the
ADDRESSES section. Comments will be available in the AD docket shortly
after receipt.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
0
Accordingly, under the authority delegated to me by the Administrator,
the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by adding the following new AD:
2008-13-14 Empresa Brasileira de Aeronautica S.A. (EMBRAER):
Amendment 39-15577. Docket No. FAA-2008-0182; Directorate Identifier
2007-NM-262-AD.
Effective Date
(a) This airworthiness directive (AD) becomes effective July 30,
2008.
Affected ADs
(b) None.
Applicability
(c) This AD applies to EMBRAER Model EMB-135ER, -135KE, -135KL,
and -135LR airplanes, and Model EMB-145, -145ER, -145MR, -145LR, -
145XR, -145MP, and -145EP airplanes; certificated in any category;
except for Model EMB-145LR airplanes modified according to Brazilian
Supplemental Type Certificate 2002S06-09, 2002S06-10, or 2003S08-01.
Note 1: This AD requires revisions to certain operator
maintenance documents to include new inspections. Compliance with
these inspections is required by 14 CFR 91.403(c). For airplanes
that have been previously modified, altered, or repaired in the
areas addressed by these inspections, the operator may not be able
to accomplish the inspections described in the revisions. In this
situation, to comply with 14 CFR 91.403(c), the operator must
request approval for an alternative method of compliance according
to paragraph (g) of this AD. The request should include a
description of changes to the required inspections that will ensure
the continued operational safety of the airplane.
Subject
(d) Air Transport Association (ATA) of America Code 28: Fuel.
Reason
(e) The mandatory continuing airworthiness information (MCAI)
states:
Fuel system reassessment, performed according to RBHA-E88/SFAR-
88, requires the inclusion of new maintenance tasks in the Critical
Design Configuration Control Limitations (CDCCL) and in the Fuel
System Limitations (FSL), necessary to preclude ignition sources in
the fuel system. * * *
The corrective action is revising the Airworthiness Limitations
Section (ALS) of the Instructions for Continued Airworthiness (ICA)
to incorporate new limitations for fuel tank systems.
Actions and Compliance
(f) Unless already done, do the following actions.
(1) The term ``MRBR,'' as used in this AD, means the EMBRAER
EMB135/ERJ140/EMB145 Maintenance Review Board Report (MRBR) MRB-145/
1150, Revision 11, dated September 19, 2007.
(2) Before December 16, 2008, revise the ALS of the ICA to
incorporate Section A2.5.2, Fuel System Limitation Items, of
Appendix 2 of the MRBR. For all tasks identified in Section A2.5.2
of Appendix 2 of the MRBR, the initial compliance times start from
the applicable times specified in Table 1 of this AD; and the
repetitive inspections must be accomplished thereafter at the
interval specified in Section A2.5.2 of Appendix 2 of the MRBR,
except as provided by paragraphs (f) (4) and (g) of this AD.
Table 1.--Initial Inspections
----------------------------------------------------------------------------------------------------------------
Compliance time (whichever occurs later)
Reference No. Description -----------------------------------------------
Threshold Grace period
----------------------------------------------------------------------------------------------------------------
28-11-00-720-001-A00............... Functionally Check critical Before the Within 90 days after
bonding integrity of accumulation of December 16, 2008.
selected conduits inside 30,000 total flight
the wing tank, Fuel Pump hours.
and FQIS connectors at
tank wall by conductivity
measurements.
[[Page 35907]]
28-17-01-720-001-A00............... Functionally Check critical Before the Within 90 days after
bonding integrity of Fuel accumulation of December 16, 2008.
Pump, VFQIS and Low Level 30,000 total flight
SW connectors at tank wall hours.
by conductivity
measurements.
28-21-01-220-001-A00............... Inspect Electric Fuel Pump Before the Within 90 days after
Connector. accumulation of December 16, 2008.
10,000 total flight
hours.
28-23-03-220-001-A00............... Inspect Pilot Valve harness Before the Within 90 days after
inside the conduit. accumulation of December 16, 2008.
20,000 total flight
hours.
28-23-04-220-001-A00............... Inspect Vent Valve harness Before the Within 90 days after
inside the conduit. accumulation of December 16, 2008.
20,000 total flight
hours.
28-27-01-220-001-A00............... Inspect Electric Fuel Before the Within 90 days after
Transfer Pump Connector. accumulation of December 16, 2008.
10,000 total flight
hours.
28-41-03-220-001-A00............... Inspect FQIS harness for Before the Within 90 days after
clamp and wire jacket accumulation of December 16, 2008.
integrity. 20,000 total flight
hours.
28-41-07-220-001-A00............... Inspect VFQIS and Low Level Before the Within 90 days after
SW Harness for clamp and accumulation of December 16, 2008.
wire jacket integrity. 20,000 total flight
hours.
----------------------------------------------------------------------------------------------------------------
(3) Before December 16, 2008, or within 90 days after the
effective date of this AD, whichever occurs first, revise the ALS of
the ICA to incorporate items 1, 2, and 3 of Section A2.4, Critical
Design Configuration Control Limitation (CDCCL), of Appendix 2 of
the MRBR.
(4) After accomplishing the actions specified in paragraphs
(f)(2) and (f)(3) of this AD, no alternative inspections, inspection
intervals, or CDCCLs may be used unless the inspections, intervals,
or CDCCLs are part of a later revision of Appendix 2 of the MRBR
that is approved by the Manager, ANM-116, FAA, or ANAC (or its
delegated agent); or unless the inspections, intervals, or CDCCLs
are approved as an alternative method of compliance (AMOC) in
accordance with the procedures specified in paragraph (g) of this
AD.
FAA AD Differences
Note 2: This AD differs from the MCAI and/or service information
as follows: The MCAI specifies a compliance date of ``Before
December 31, 2008'' for doing the ALI revisions. We have already
issued regulations that require operators to revise their
maintenance/inspection programs to address fuel tank safety issues.
The compliance date for these regulations is December 16, 2008. To
provide for coordinated implementation of these regulations and this
AD, we are using this same compliance date in this AD.
Other FAA AD Provisions
(g) The following provisions also apply to this AD:
(1) Alternative Methods of Compliance (AMOCs): The Manager,
International Branch, ANM-116, FAA, has the authority to approve
AMOCs for this AD, if requested using the procedures found in 14 CFR
39.19. Send information to ATTN: Sanjay Ralhan, Aerospace Engineer,
International Branch, ANM-116, Transport Airplane Directorate, FAA,
1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone
(425) 227-1405; fax (425) 227-1149. Before using any approved AMOC
on any airplane to which the AMOC applies, notify your appropriate
principal inspector (PI) in the FAA Flight Standards District Office
(FSDO), or lacking a PI, your local FSDO.
(2) Airworthy Product: For any requirement in this AD to obtain
corrective actions from a manufacturer or other source, use these
actions if they are FAA-approved. Corrective actions are considered
FAA-approved if they are approved by the State of Design Authority
(or their delegated agent). You are required to assure the product
is airworthy before it is returned to service.
(3) Reporting Requirements: For any reporting requirement in
this AD, under the provisions of the Paperwork Reduction Act, the
Office of Management and Budget (OMB) has approved the information
collection requirements and has assigned OMB Control Number 2120-
0056.
Related Information
(h) Refer to Brazilian Airworthiness Directive 2007-08-02,
effective September 27, 2007; and Sections A2.5.2, Fuel System
Limitation Items, and A2.4, Critical Design Configuration Control
Limitation (CDCCL), of Appendix 2 of the MRBR; for related
information.
Material Incorporated by Reference
(i) You must use Sections A2.5.2, Fuel System Limitation Items,
and A2.4, Critical Design Configuration Control Limitation (CDCCL),
of Appendix 2 of EMBRAER EMB135/ERJ140/EMB145 Maintenance Review
Board Report MRB-145/1150, Revision 11, dated September 19, 2007, to
do the actions required by this AD, unless the AD specifies
otherwise. This document contains the following effective pages:
----------------------------------------------------------------------------------------------------------------
Revision
Pages level Date
----------------------------------------------------------------------------------------------------------------
List of Effective Pages:
Pages A through L.......................... 11 September 19, 2007.
----------------------------------------------------------------------------------------------------------------
(The revision level of this document is identified only on the
title page of the document.)
(1) The Director of the Federal Register approved the
incorporation by reference of this service information under 5
U.S.C. 552(a) and 1 CFR part 51.
(2) For service information identified in this AD, contact
Empresa Brasileira de Aeronautica S.A. (EMBRAER), P.O. Box 343--CEP
12.225, Sao Jose dos Campos--SP, Brazil.
(3) You may review copies at the FAA, Transport Airplane
Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the
National Archives and Records Administration (NARA). For information
on the availability of this material at NARA, call (202) 741-6030,
or go to: <a href="http://www.archives.gov/federal-register/cfr/ibr-locations.html">http://www.archives.gov/federal-register/cfr/ibr-locations.html</a>.
Issued in Renton, Washington, on June 13, 2008.
Ali Bahrami,
Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. E8-13924 Filed 6-24-08; 8:45 am]
BILLING CODE 4910-13-P
Source: Official FAA Source ↗
Retrieved: Apr 4, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.