AD 2006-12-26
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | The Boeing Company | 777-200 Series | Airworthiness Directives; Boeing Model 777-200, -300, and -300ER Series Airplanes |
| aircraft | The Boeing Company | 777-300 Series | Airworthiness Directives; Boeing Model 777-200, -300, and -300ER Series Airplanes |
| aircraft | The Boeing Company | 777-300ER Series | Airworthiness Directives; Boeing Model 777-200, -300, and -300ER Series Airplanes |
Unsafe Condition
Arcing or sparking during a lightning strike at the interface between the bulkhead fittings of the engine fuel feed tube and the front spar inside the fuel tank could provide a potential ignition source inside the fuel tank, which, in combination with flammable fuel vapors, could result in fuel tank explosions and consequent loss of the airplane.
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Inspect the first bonding jumper aft of the bulkhead fitting to detect damage or failure and determine the mechanical integrity of its electrical bonding path, and repair if necessary. Measure the bonding resistance between the fitting for the fuel feed tube and the front spar in the left and right main fuel tanks, and repair the bonding if necessary. Apply additional sealant to completely cover the bulkhead fittings inside the fuel tanks.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
Before further flight
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
Boeing Model 777-200, -300, and -300ER series airplanes.
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
The FAA is adopting a new airworthiness directive (AD) for certain Boeing Model 777-200, -300, and -300ER series airplanes. This AD requires a one-time inspection of the first bonding jumper aft of the bulkhead fitting to detect damage or failure and to determine the mechanical integrity of its electrical bonding path, and repair if necessary; measuring the bonding resistance between the fitting for the fuel feed tube and the front spar in the left and right main fuel tanks, and repairing the bonding if necessary; and applying additional sealant to completely cover the bulkhead fittings inside the fuel tanks. This AD results from fuel system reviews conducted by the manufacturer. We are issuing this AD to prevent arcing or sparking during a lightning strike at the interface between the bulkhead fittings of the engine fuel feed tube and the front spar inside the fuel tank. This arcing or sparking could provide a potential ignition source inside the fuel tank, which, in combination with flammable fuel vapors, could result in fuel tank explosions and consequent loss of the airplane.
Document Text
Show stored source text (verify against official source)
[Federal Register Volume 71, Number 116 (Friday, June 16, 2006)]
[Rules and Regulations]
[Pages 34808-34811]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 06-5428]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2006-24173; Directorate Identifier 2005-NM-262-AD;
Amendment 39-14652; AD 2006-12-26]
RIN 2120-AA64
Airworthiness Directives; Boeing Model 777-200, -300, and -300ER
Series Airplanes
AGENCY: Federal Aviation Administration (FAA), Department of
Transportation (DOT).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The FAA is adopting a new airworthiness directive (AD) for
certain Boeing Model 777-200, -300, and -300ER series airplanes. This
AD requires a one-time inspection of the first bonding jumper aft of
the bulkhead fitting to detect damage or failure and to determine the
mechanical integrity of its electrical bonding path, and repair if
necessary; measuring the bonding resistance between the fitting for the
fuel feed tube and the front spar in the left and right main fuel
tanks, and repairing the bonding if necessary; and applying additional
sealant to completely cover the bulkhead fittings inside the fuel
tanks. This AD results from fuel system reviews conducted by the
manufacturer. We are issuing this AD to prevent arcing or sparking
during a lightning strike at the interface between the bulkhead
fittings of the engine fuel feed tube and the front spar inside the
fuel tank. This arcing or sparking could provide a potential ignition
source inside the fuel tank,
[[Page 34809]]
which, in combination with flammable fuel vapors, could result in fuel
tank explosions and consequent loss of the airplane.
DATES: This AD becomes effective July 21, 2006.
The Director of the Federal Register approved the incorporation by
reference of a certain publication listed in the AD as of July 21,
2006.
ADDRESSES: You may examine the AD docket on the Internet at <a href="http://dms.dot.gov">http://dms.dot.gov</a> or in person at the Docket Management Facility, U.S.
Department of Transportation, 400 Seventh Street, SW., Nassif Building,
Room PL-401, Washington, DC.
Contact Boeing Commercial Airplanes, P.O. Box 3707, Seattle,
Washington 98124-2207, for service information identified in this AD.
FOR FURTHER INFORMATION CONTACT: Margaret Langsted, Aerospace Engineer,
Propulsion Branch, ANM-140S, Seattle Aircraft Certification Office,
FAA, 1601 Lind Avenue, SW., Renton, Washington 98055-4056; telephone
(425) 917-6500; fax (425) 917-6590.
SUPPLEMENTARY INFORMATION:
Examining the Docket
You may examine the airworthiness directive (AD) docket on the
Internet at <a href="http://dms.dot.gov">http://dms.dot.gov</a> or in person at the Docket Management
Facility office between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays. The Docket Management Facility office
(telephone (800) 647-5227) is located on the plaza level of the Nassif
Building at the street address stated in the ADDRESSES section.
Discussion
The FAA issued a notice of proposed rulemaking (NPRM) to amend 14
CFR part 39 to include an AD that would apply to certain Boeing Model
777 airplanes. That NPRM was published in the Federal Register on March
21, 2006 (71 FR 14126). That NPRM proposed to require a one-time
inspection of the first bonding jumper aft of the bulkhead fitting to
detect damage or failure and to determine the mechanical integrity of
its electrical bonding path, and repair if necessary; measuring the
bonding resistance between the fitting for the fuel feed tube and the
front spar in the left and right main fuel tanks, and repairing the
bonding if necessary; and applying additional sealant to completely
cover the bulkhead fittings inside the fuel tanks.
Comments
We provided the public the opportunity to participate in the
development of this AD. We have considered the comments received.
Support for the NPRM
Boeing concurs with the NPRM.
Request To Revise the Service Bulletin
Japan Airlines (JAL) suggests that Boeing should revise Boeing
Special Attention Service Bulletin 777-28-0044, Revision 1, dated
December 20, 2005, to incorporate the repair instructions for the
bonding path rather than having them separate from the service
bulletin. (This service bulletin was referenced as the appropriate
source of service information for accomplishing the actions in the
NPRM.) JAL states that it would be simpler if the AD referred to the
service bulletin for the whole work instructions, including all repair
procedures.
We partially agree. We agree with JAL that having all repair
procedures in one place can be simpler for operators. We do not agree
that Boeing should revise its service bulletin for this reason, nor can
we request a manufacturer to revise a service bulletin to make
addressing an unsafe condition more convenient. Waiting to include a
revised service bulletin in this action would delay addressing an
unsafe condition. In addition, manufacturers' service information often
refers to procedures in various maintenance manuals for a number of
reasons (e.g., to keep procedures in the service bulletin from becoming
too cumbersome, or because the procedure is an industry best practice).
In this case, the referenced service bulletin refers to Chapter 28-00-
00 of the Boeing 777 Aircraft Maintenance Manual (AMM) for doing the
general visual inspection of the first bonding jumper aft of the
bulkhead fitting to detect damage or failure and to determine the
mechanical integrity of its electrical bonding path. We assume some of
JAL's issue stems from the statement in paragraph (f)(1) of the NPRM
that these conditions must be repaired according to a method we
approve, and that Chapter 28-00-00 of the Boeing 777 AMM is one
approved method. We included that statement in paragraph (f)(1) because
although the service bulletin implies repair for the bonding path in
accordance with the AMM chapter, the statement in the service bulletin
is not explicit and could be confusing. We have not changed the final
rule in this regard.
Request To Revise Cost Estimate
Air Transport Association (ATA), on behalf of American Airlines,
requests that we revise the cost estimate. American Airlines quotes an
``AD memo'' that reads ``FAA estimates that 46 airplanes of U.S.
registry would be affected by this rulemaking.'' American Airlines
points out that it has 45 affected airplanes, and that there are three
other U.S. operators that also have affected airplanes. American
Airlines also does not concur with the statement in the NPRM that the
cost of the proposed actions would be $640 per airplane for eight hours
of work. Although American Airlines understands that the FAA does not
consider access time when calculating the cost to comply with an AD,
American Airlines believes it is important to note that this inspection
and sealant application requires complete draining and venting of the
fuel tanks, which alone could take eight hours. In total, American
Airlines estimates the inspection and sealant application will require
approximately 48 work hours per airplane at a cost of $202,586.
We partially agree with the commenters. We agree that there are
more than 45 airplanes of U.S. registry affected by the actions in the
NPRM. We are not familiar with an ``AD memo,'' which could have been a
summary of the NPRM initiated by another source. The number of affected
airplanes listed in the NPRM is 131 rather than 45. We have revised the
``Costs of Compliance'' paragraph to reflect this information.
We do not agree with revising the number of work hours in the cost
estimate. As American Airlines points out, we do not consider access
time when calculating the cost of an AD. The cost information below
describes only the direct costs of the specific actions required by
this AD. Based on the best data available, the manufacturer provided
the number of work hours (8) necessary to do the required actions. This
number represents the time necessary to perform only the actions
actually required by this AD. We recognize that, in doing the actions
required by an AD, operators may incur incidental costs in addition to
the direct costs. The cost analysis in AD rulemaking actions excludes
the costs of the time required to gain access and close up, as American
points out, but it also excludes other incidental costs such as the
time necessary for planning, or time for other administrative actions.
All of these costs may vary significantly among operators and are
almost impossible to calculate. We have not changed the final rule in
this regard.
Explanation of Change in Applicability
We have revised the applicability of this final rule to match the
most current
[[Page 34810]]
type certificate data sheet for the affected airplanes.
Conclusion
We have carefully reviewed the available data, including the
comments received, and determined that air safety and the public
interest require adopting the AD with the change described previously.
We have determined that this change will neither increase the economic
burden on any operator nor increase the scope of the AD.
Costs of Compliance
There are about 497 airplanes of the affected design in the
worldwide fleet. This AD affects about 131 airplanes of U.S. registry.
The actions take about 8 work hours per airplane, at an average labor
rate of $80 per work hour. Based on these figures, the estimated cost
of the AD for U.S. operators is $83,840, or $640 per airplane.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. Subtitle VII, Aviation Programs,
describes in more detail the scope of the Agency's authority.
We are issuing this rulemaking under the authority described in
subtitle VII, part A, subpart III, section 44701, ``General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
We have determined that this AD will not have federalism
implications under Executive Order 13132. This AD will not have a
substantial direct effect on the States, on the relationship between
the national government and the States, or on the distribution of power
and responsibilities among the various levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866;
(2) Is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979); and
(3) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
We prepared a regulatory evaluation of the estimated costs to
comply with this AD and placed it in the AD docket. See the ADDRESSES
section for a location to examine the regulatory evaluation.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
0
Accordingly, under the authority delegated to me by the Administrator,
the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The Federal Aviation Administration (FAA) amends Sec. 39.13 by
adding the following new airworthiness directive (AD):
2006-12-26 Boeing: Amendment 39-14652. Docket No. FAA-2006-24173;
Directorate Identifier 2005-NM-262-AD.
Effective Date
(a) This AD becomes effective July 21, 2006.
Affected ADs
(b) None.
Applicability
(c) This AD applies to Boeing Model 777-200, -300, and -300ER
series airplanes, certificated in any category; as identified in
Boeing Special Attention Service Bulletin 777-28-0044, Revision 1,
dated December 20, 2005.
Unsafe Condition
(d) This AD results from fuel system reviews conducted by the
manufacturer. We are issuing this AD to prevent arcing or sparking
during a lightning strike at the interface between the bulkhead
fittings of the engine fuel feed tube and the front spar inside the
fuel tank. This arcing or sparking could provide a potential
ignition source inside the fuel tank, which, in combination with
flammable fuel vapors, could result in fuel tank explosions and
consequent loss of the airplane.
Compliance
(e) You are responsible for having the actions required by this
AD performed within the compliance times specified, unless the
actions have already been done.
Inspection and Corrective Actions
(f) Within 60 months after the effective date of this AD, do the
actions specified in paragraphs (f)(1), (f)(2), and (f)(3) of this
AD for the bulkhead fittings of the engine fuel feed tube for the
left and right main fuel tanks. Do all actions in accordance with
the Accomplishment Instructions of Boeing Special Attention Service
Bulletin 777-28-0044, Revision 1, dated December 20, 2005.
(1) Do a general visual inspection of the first bonding jumper
aft of the bulkhead fitting to detect damage or failure and to
determine the mechanical integrity of its electrical bonding path.
If any damage or failure is found during this inspection or if the
mechanical integrity of the bonding path is compromised: Before
further flight, repair according to a method approved by the
Manager, Seattle Aircraft Certification Office (ACO), FAA. Chapter
28-00-00 of the Boeing 777 Aircraft Maintenance Manual is one
approved method.
(2) Measure the bonding resistance between the fitting for the
fuel feed tube and the front spar in the left main fuel tank. If the
bonding resistance exceeds 0.001 ohm: Before further flight, repair
the bonding in accordance with the service bulletin.
(3) Apply additional sealant to completely cover the bulkhead
fitting inside the fuel tank.
Actions Accomplished in Accordance With Previous Revision of Service
Bulletin
(g) Actions done before the effective date of this AD in
accordance with Boeing Special Attention Service bulletin 777-28-
0044, dated February 3, 2005, are acceptable for compliance with the
requirements of paragraph (f) of this AD.
Alternative Methods of Compliance (AMOCs)
(h)(1) The Manager, Seattle ACO, FAA, has the authority to
approve AMOCs for this AD, if requested in accordance with the
procedures found in 14 CFR 39.19.
(2) Before using any AMOC approved in accordance with Sec.
39.19 on any airplane to which the AMOC applies, notify the
appropriate principal inspector in the FAA Flight Standards
Certificate Holding District Office.
Material Incorporated by Reference
(i) You must use Boeing Special Attention Service Bulletin 777-
28-0044, Revision 1, dated December 20, 2005, to perform the actions
that are required by this AD, unless the AD specifies otherwise. The
Director of the Federal Register approved the incorporation by
reference of this document in accordance with 5 U.S.C. 552(a) and 1
CFR part 51. Contact Boeing Commercial Airplanes, P.O. Box 3707,
Seattle, Washington 98124-2207, for a copy of this service
information. You may review copies at the Docket Management
Facility, U.S. Department of Transportation, 400 Seventh Street,
SW., Room PL-401, Nassif Building, Washington, DC; on the Internet
at <a href="http://dms.dot.gov">http://dms.dot.gov</a>; or at the National Archives and Records
Administration (NARA). For information on the availability of this
material at the NARA, call (202) 741-6030, or go to <a href="http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html">http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html</a>.
[[Page 34811]]
Issued in Renton, Washington, on June 8, 2006.
Kalene C. Yanamura,
Acting Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 06-5428 Filed 6-15-06; 8:45 am]
BILLING CODE 4910-13-P