AD 2005-26-06

final rule
Data completeness: 80%

Airworthiness Directives; General Electric Company CF6-45A, CF6-50A, CF6-50C, and CF6-50E Series Turbofan Engines

AD Number
2005-26-06
Status
final_rule
Effective Date
Product Category
engine
Docket
Docket No. FAA-2005-22124
FR Citation
70 FR 75933

Applicability

TypeManufacturerModelDetails
engine General Electric Company CF6-45A Airworthiness Directives; General Electric Company CF6-45A, CF6-50A, CF6-50C, and CF6-50E Series Turbofan Engines

Unsafe Condition

Reports of fan mid shaft separation leading to separation of the low pressure turbine (LPT) stage 1 disk, disk overspeed, and uncontained engine failure.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Remove pre-GE Service Bulletin (SB) No. CF6-50 S/B 72-1268 configuration LPT stage 2 and stage 3 interstage seal assemblies. Install new or reworked configuration stage 2 and stage 3 interstage seal assemblies.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

At the next disassembly of the LPT stage 2 and stage 3 interstage seal assemblies after the effective date, but no later than December 31, 2010.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

General Electric Company CF6-45A, CF6-50A, CF6-50C, and CF6-50E series turbofan engines installed on, but not limited to, Boeing DC10 and 747 series airplanes, and Airbus Industrie A300 series airplanes.

AI-generated summary from the source AD text. Verify against the official source before acting.

Source: Official FAA Source ↗

Retrieved: Apr 4, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.