AD 2005-23-17
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | The Boeing Company | 737-100 Series | Airworthiness Directives; Boeing Model 737 Airplanes |
| aircraft | The Boeing Company | 737-200 Series | Airworthiness Directives; Boeing Model 737 Airplanes |
| aircraft | The Boeing Company | 737-200C Series | Airworthiness Directives; Boeing Model 737 Airplanes |
| aircraft | The Boeing Company | 737-300 Series | Airworthiness Directives; Boeing Model 737 Airplanes |
| aircraft | The Boeing Company | 737-400 Series | Airworthiness Directives; Boeing Model 737 Airplanes |
| aircraft | The Boeing Company | 737-500 Series | Airworthiness Directives; Boeing Model 737 Airplanes |
| aircraft | The Boeing Company | 737-600 Series | Airworthiness Directives; Boeing Model 737 Airplanes |
| aircraft | The Boeing Company | 737-700 Series | Airworthiness Directives; Boeing Model 737 Airplanes |
| aircraft | The Boeing Company | 737-700C Series | Airworthiness Directives; Boeing Model 737 Airplanes |
| aircraft | The Boeing Company | 737-800 Series | Airworthiness Directives; Boeing Model 737 Airplanes |
| aircraft | The Boeing Company | 737-900 Series | Airworthiness Directives; Boeing Model 737 Airplanes |
Unsafe Condition
Chafed wiring behind the P15 refuel panel and arcing to the back of the P15 refuel panel and adjacent wing structure.
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Perform a one-time detailed inspection for interference between a clamp assembly and the wires behind the P15 refuel panel, and take corrective actions if necessary. For certain other airplanes, perform a one-time detailed inspection for discrepancies of the wires behind the P15 refuel panel, and take corrective and related investigative actions if necessary.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
Within 18 months of the effective date (December 21, 2005).
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
Boeing Model 737 airplanes, as specified in the AD, with certain configurations or service bulletins.
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
The FAA is adopting a new airworthiness directive (AD) for certain Boeing Model 737 airplanes. This AD requires, for certain airplanes, a one-time detailed inspection for interference between a clamp assembly and the wires behind the P15 refuel panel, and corrective actions if necessary. For certain other airplanes, this AD requires a one-time detailed inspection for discrepancies of the wires behind the P15 refuel panel; and corrective and related investigative actions if necessary. This AD is prompted by evidence of chafed wiring behind the P15 refuel panel and arcing to the back of the P15 refuel panel and adjacent wing structure. We are issuing this AD to detect and correct chafing of the wiring behind the P15 refuel panel, which could lead to arcing and fire with consequent airplane damage and injury to refueling personnel.
Document Text
Show stored source text (verify against official source)
[Federal Register Volume 70, Number 220 (Wednesday, November 16, 2005)]
[Rules and Regulations]
[Pages 69424-69427]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 05-22591]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2004-19539; Directorate Identifier 2004-NM-06-AD;
Amendment 39-14375; AD 2005-23-17]
RIN 2120-AA64
Airworthiness Directives; Boeing Model 737 Airplanes
AGENCY: Federal Aviation Administration (FAA), Department of
Transportation (DOT).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The FAA is adopting a new airworthiness directive (AD) for
certain Boeing Model 737 airplanes. This AD requires, for certain
airplanes, a one-time detailed inspection for interference between a
clamp assembly and the wires behind the P15 refuel panel, and
corrective actions if necessary. For certain other airplanes, this AD
requires a one-time detailed inspection for discrepancies of the wires
behind the P15 refuel panel; and corrective and related investigative
actions if necessary. This AD is prompted by evidence of chafed wiring
behind the P15 refuel panel and arcing to the back of the P15 refuel
panel and adjacent wing structure. We are issuing this AD to detect and
correct chafing of the wiring behind the P15 refuel panel, which could
lead to arcing and fire with consequent airplane damage and injury to
refueling personnel.
DATES: This AD becomes effective December 21, 2005.
The incorporation by reference of certain publications listed in
the AD is approved by the Director of the Federal Register as of
December 21, 2005.
ADDRESSES: You may examine the AD docket on the Internet at <a href="http://dms.dot.gov">http://dms.dot.gov</a> or in person at the Docket Management Facility, U.S.
Department of Transportation, 400 Seventh Street SW., Nassif Building,
room PL-401, Washington, DC.
Contact Boeing Commercial Airplanes, P.O. Box 3707, Seattle,
Washington 98124-2207, for service information identified in this AD.
FOR FURTHER INFORMATION CONTACT: Sherry Vevea, Aerospace Engineer,
[[Page 69425]]
Propulsion Branch, ANM-140S, FAA, Seattle Aircraft Certification
Office, 1601 Lind Avenue, SW., Renton, Washington 98055-4056; telephone
(425) 917-6514; fax (425) 917-6590.
SUPPLEMENTARY INFORMATION:
Examining the Docket
You may examine the airworthiness directive (AD) docket on the
Internet at <a href="http://dms.dot.gov">http://dms.dot.gov</a> or in person at the Docket Management
Facility office between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays. The Docket Management Facility office
(telephone (800) 647-5227) is located on the plaza level of the Nassif
Building at the street address stated in the ADDRESSES section.
Discussion
The FAA issued a notice of proposed rulemaking (NPRM) to amend 14
CFR part 39 to include an AD that would apply to certain Boeing Model
737 airplanes. That NPRM was published in the Federal Register on
November 5, 2004 (69 FR 64515). That NPRM proposed to require, for
certain airplanes, a one-time detailed inspection for interference
between a clamp assembly and the wires behind the P15 refuel panel, and
corrective actions if necessary. For certain other airplanes, that NPRM
proposed to require a one-time detailed inspection for discrepancies of
the wires behind the P15 refuel panel; and corrective and related
investigative actions if necessary.
Explanation of Service Information Revision
Since the issuance of the NPRM, the manufacturer has revised the
service bulletins referenced in this AD. We have reviewed Boeing
Special Attention Service Bulletins 737-28-1193 and 737-28-1200, both
Revision 1, both dated July 28, 2005. We have determined that these
revised service bulletins will neither increase the economic burden on
any operator nor increase the scope of the AD and should be referenced
as the appropriate sources of service information for accomplishing the
requirements of the AD. Therefore, in the AD, we have revised paragraph
(f) to specify the revised service bulletins, inserted new paragraph
(g) to give credit for using the original issues of the service
bulletins (which were referenced as the appropriate sources of service
information for accomplishing the requirements of the AD) to accomplish
the required actions before the effective date of the AD, and re-
identified existing paragraph (g) to (h).
Comments
We provided the public the opportunity to participate in the
development of this AD. We have considered the comments that have been
submitted on the NPRM.
Request To Revise Inspection and Corrective Action
One commenter requests that paragraph (f)(2)(ii) of the NPRM be
changed in the AD to read ``For Group 2 airplanes only as defined in
Service Bulletin 737-28-1200: Perform a one-time detailed inspection
for discrepancies of the wires in wire bundle W0024 to connector
D04578P on the back of the P15 refuel panel and do any applicable
corrective actions before further flight.'' The commenter states this
change will provide appropriate operator guidance by tying the detailed
inspection of Group 2 airplanes to the applicable service bulletin.
We partially agree. Paragraph (f)(2) of the AD clearly states that
all applicable actions listed in paragraphs (f)(2)(i) and (f)(2)(ii) of
this AD must be done in accordance with Boeing Special Attention
Service Bulletin 737-28-1200, Revision 1, dated July 28, 2005. However,
for clarity, as paragraph (f)(2)(i) of the NPRM refers to ``Service
Bulletin 737-28-1200,'' we have revised paragraph (f)(2)(ii) of the AD
to also refer to ``Service Bulletin 737-28-1200.''
Request for Credit for Visual Check
Three commenters request that the AD clarify that inspections
accomplished prior to the effective date of the AD using the ``visual
check'' criteria specified in Boeing Special Attention Service Bulletin
737-28-1193, dated April 24, 2003, satisfy the ``detailed inspection''
requirement of paragraph (f) of the NPRM. One commenter requests that
the same clarification be applied for Boeing Special Attention Service
Bulletin 737-28-1200, dated July 10, 2003. Another commenter requests
that ``Note 1'' and all references to it be deleted from the AD. The
commenters state that Note 1 could be interpreted so that only a
detailed inspection as defined in the NPRM that is accomplished prior
to the effective date of the AD shall receive credit in accordance with
paragraph (e) of the AD. The commenters assert that the inspection
criteria identified as a visual check in Boeing Special Attention
Service Bulletin 737-28-1193 are equivalent to the detailed inspection
criteria described in Note 1 of the NPRM, and therefore, applicable
airplanes that have already accomplished the inspection in accordance
with Special Attention Service Bulletin 737-28-1193 will not need to be
re-inspected.
We partially agree. Airplanes that have received a visual check in
accordance with Boeing Special Attention Service Bulletin 737-28-1193,
dated April 24, 2003; or Boeing Special Attention Service Bulletin 737-
28-1200, dated July 10, 2003; as applicable, prior to the effective
date of this AD, may satisfy the requirement of this AD to perform a
detailed inspection. If the visual check was performed to the same
level of complexity and using equipment comparable to that specified
for a detailed inspection as defined in Note 1 of the AD, credit is
given according to paragraph (e) of the AD. However, if the visual
check did not meet all the parameters defined by Note 1, additional
work is necessary to comply with the requirements of the AD. Therefore,
we do not agree that the specified visual check necessarily meets the
requirements of a detailed inspection; nor do we agree that Note 1 and
its applicable references should be deleted from the AD, as Note 1
clarifies what constitutes a detailed inspection. However, if anyone
wishes to submit technical data demonstrating that they have performed
a visual check that meets the requirements of a detailed inspection as
defined in Note 1 of the AD, they may request approval of an
alternative method of compliance (AMOC) in accordance with paragraph
(h)(1) of the AD. We have not changed the AD in this regard.
Request for Revised Costs of Compliance
Two commenters request that we revise the costs of compliance. One
commenter requests that we increase the number of work hours to reflect
installation of Teflon sleeves around the wiring and revise the
estimated cost accordingly. A second commenter states that it took 6
man-hours per airplane to accomplish the actions specified by the
service bulletin, including operational tests. Though the second
commenter made no request to change the work hours, we infer that the
commenter wishes us to revise the estimated cost to reflect 6 man-
hours.
We do not agree with this request. Costs of compliance are limited
to only the actions required by the AD, which, in this case, are those
actions related to the detailed inspection of the wires in wire bundle
W0024 to connector D04578P on the back of the P15 refueling panel
required by paragraph (f)(1) of the AD. The cost of any
[[Page 69426]]
``applicable corrective actions'' is conditional on the result of the
inspection and, regardless of any AD direction, those actions must be
performed to correct an identified unsafe condition to ensure airworthy
operation of the airplane, as required by the Federal Aviation
Regulations. Further, the number of work-hours listed in the AD is
consistent with the number provided by the service bulletin. We have
not changed the AD in this regard.
Request To Permit Concurrent Use of Information Notices
One commenter states that Boeing service bulletins listed in the
NPRM have information notices (INs) issued against them that provide
minor clarifications and revisions to materials and part numbers. The
commenter requests that the final rule allow for the use of the INs
with the respective service bulletins when accomplishing the
requirements of the AD. The commenter states this would allow operators
to take advantage of the changes in the INs without having to request
an AMOC.
We concur that the applicable INs may be used with their respective
Boeing service bulletins when accomplishing the requirements of the AD.
Information Notices 737-28-1193 IN 01 and 737-28-1200 IN 01 were
released on September 11, 2003, to provide alternate part numbers, and
minor clarifications and revisions to materials and part numbers. The
information in these INs was subsequently incorporated into Boeing
Special Attention Service Bulletins 737-28-1193 and 737-28-1200, both
Revision 1, both dated July 28, 2005. Therefore, we have revised
paragraph (g) of the AD to give credit for using the above INs with
Boeing Special Attention Service Bulletins 737-28-1193, dated April 24,
2003; or 737-28-1200, dated July 10, 2003; as applicable, for actions
accomplished prior to the effective date of this AD.
Request To Reduce the Compliance Time
One commenter requests that the compliance time be reduced. The
commenter states that the nature of the fault and hazard that may exist
during ground and flight operations justifies reducing the 18 month
compliance time specified in paragraph (f) of the NPRM. The commenter
did not provide data to substantiate any reduction of the compliance
time.
We do not agree to revise the compliance time. The P15 refueling
panel is powered only when the refueling panel access door is open for
refueling the airplane, so there is no risk imposed during flight
operations. Further, the refueling panel is properly grounded to
protect the operator from any shock hazard during refueling. Therefore,
the unsafe condition does not warrant immediate action and reduced
compliance time; however, operators are always free to accomplish the
requirements of the AD at any time before the compliance time. We have
not changed the AD in this regard.
Request To Increase the Compliance Time
One commenter requests that the compliance time be increased. The
commenter states that Boeing Special Attention Service Bulletin 737-28-
1200 recommends a 24-month compliance time and requests that the
compliance time be increased to 24 months to align with current Model
737 Next Generation maintenance programs.
We do not agree. We considered the urgency associated with the
unsafe condition and the practical aspects of accomplishing the
required inspection within an interval that corresponds to the normal
maintenance schedules of most affected operators and, with manufacturer
concurrence, arrived at an appropriate compliance time of 18 months for
all affected airplanes. Further, the manufacturer, in revising Special
Attention Service Bulletin 737-28-1200, has reduced the recommended
compliance time from 24 months to 18 months, which aligns with the
compliance time proposed in the NPRM. In considering all these factors,
we determined that this compliance time represents an appropriate
interval during which the wiring behind the P15 refueling panel can be
inspected and any necessary corrective action taken while still
maintaining an adequate level of safety. However, under the provisions
of paragraph (h)(1) of the AD, we may approve requests for adjustments
to the compliance time if data are submitted to substantiate that such
adjustments would provide acceptable levels of safety. In addition, if
further technical data are presented that would justify a revised
compliance time, we may consider further rulemaking on this issue. We
have not changed the AD in this regard.
Clarification of AMOC Paragraph
We have revised this action to clarify the appropriate procedure
for notifying the principal inspector before using any approved AMOC on
any airplane to which the AMOC applies.
Conclusion
We have carefully reviewed the available data, including the
comments that have been submitted, and determined that air safety and
the public interest require adopting the AD with the changes described
previously. We have determined that these changes will neither increase
the economic burden on any operator nor increase the scope of the AD.
Costs of Compliance
This AD affects about 1,653 airplanes of U.S. registry and 4,254
airplanes worldwide. The inspections take about 3 work hours per
airplane, at an average labor rate of $65 per work hour. Based on these
figures, the estimated cost of this AD for U.S. operators is $322,335,
or $195 per airplane.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. Subtitle VII, Aviation Programs,
describes in more detail the scope of the Agency's authority.
We are issuing this rulemaking under the authority described in
subtitle VII, part A, subpart III, section 44701, ``General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
We have determined that this AD will not have federalism
implications under Executive Order 13132. This AD will not have a
substantial direct effect on the States, on the relationship between
the national government and the States, or on the distribution of power
and responsibilities among the various levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866;
(2) Is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979); and
(3) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
[[Page 69427]]
We prepared a regulatory evaluation of the estimated costs to
comply with this AD. See the ADDRESSES section for a location to
examine the regulatory evaluation.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
0
Accordingly, under the authority delegated to me by the Administrator,
the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by adding the following new airworthiness
directive (AD):
2005-23-17 Boeing: Amendment 39-14375. Docket No. FAA-2004-19539;
Directorate Identifier 2004-NM-06-AD.
Effective Date
(a) This AD becomes effective December 21, 2005.
Affected ADs
(b) None.
Applicability
(c) This AD applies to the Boeing airplanes listed in Table 1 of
this AD, certificated in any category:
Table 1.--Applicability
------------------------------------------------------------------------
Airplane Line numbers
------------------------------------------------------------------------
Model 737-100, -200, -200C, - 1 through 3132 inclusive.
300, -400, and -500 series
airplanes.
Model 737-600, -700, -700C, - 0001 through 1240 inclusive.
800, and -900 series airplanes.
------------------------------------------------------------------------
Unsafe Condition
(d) This AD was prompted by evidence of chafed wiring behind the
P15 refuel panel and arcing to the back of the P15 refuel panel and
adjacent wing structure. We are issuing this AD to detect and
correct chafing of the wiring behind the P15 refuel panel, which
could lead to arcing and fire with consequent airplane damage and
injury to refueling personnel.
Compliance
(e) You are responsible for having the actions required by this
AD performed within the compliance times specified, unless the
actions have already been done.
Inspection and Corrective Actions
(f) Within 18 months after the effective date of this AD,
perform the following actions as applicable:
(1) For Model 737-100, -200, -200C, -300, -400, and -500 series
airplanes: Perform a one-time detailed inspection of the wires in
wire bundle W0024 to connector D04578P on the back of the P15 refuel
panel for discrepancies, and do any applicable corrective and
related investigative actions before further flight, in accordance
with the Accomplishment Instructions of Boeing Special Attention
Service Bulletin 737-28-1193, Revision 1, dated July 28, 2005.
(2) For Model 737-600, -700, -700C, -800, and -900 series
airplanes: Perform all applicable actions listed in paragraphs
(f)(2)(i) and (f)(2)(ii) of this AD in accordance with the
Accomplishment Instructions of Boeing Special Attention Service
Bulletin 737-28-1200, Revision 1, dated July 28, 2005.
(i) For Group 1 and Group 2 airplanes as defined in Service
Bulletin 737-28-1200: Perform a one-time detailed inspection for
discrepancies of the clamp and T-bolt assembly on the wing thermal
anti-ice duct near the P15 refuel panel and do any applicable
corrective actions before further flight.
(ii) For Group 2 airplanes only as defined in Service Bulletin
737-28-1200: Perform a one-time detailed inspection for
discrepancies of the wires in wire bundle W0024 to connector D04578P
on the back of the P15 refuel panel and do any applicable corrective
actions before further flight.
Note 1: For the purposes of this AD, a detailed inspection is:
``An intensive visual examination of a specific structural area,
system, installation, or assembly to detect damage, failure, or
irregularity. Available lighting is normally supplemented with a
direct source of good lighting at intensity deemed appropriate by
the inspector. Inspection aids such as mirror, magnifying lenses,
etc., may be used. Surface cleaning and elaborate access procedures
may be required.''
Credit for Actions Done Previously
(g) Actions accomplished before the effective date of this AD in
accordance with Boeing Special Attention Service Bulletin 737-28-
1193, dated April 24, 2003; or Boeing Special Attention Service
Bulletin 737-28-1200, dated July 10, 2003; as applicable; including
Information Notices 737-28-1193 IN 01 and 737-28-1200 IN 01; both
dated September 11, 2003; as applicable, are acceptable for
compliance with the corresponding actions required by this AD.
Alternative Methods of Compliance (AMOCs)
(h)(1) The Manager, Seattle Aircraft Certification Office (ACO),
FAA, has the authority to approve AMOCs for this AD, if requested in
accordance with the procedures found in 14 CFR 39.19.
(2) Before using any AMOC approved in accordance with 14 CFR
39.19 on any airplane to which the AMOC applies, notify the
appropriate principal inspector in the FAA Flight Standards
Certificate Holding District Office.
Material Incorporated by Reference
(i) You must use Boeing Special Attention Service Bulletin 737-
28-1193, Revision 1, dated July 28, 2005; or Boeing Special
Attention Service Bulletin 737-28-1200, Revision 1, dated July 28,
2005; as applicable; to perform the actions that are required by
this AD, unless the AD specifies otherwise. The Director of the
Federal Register approved the incorporation by reference of these
documents in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.
Contact Boeing Commercial Airplanes, P.O. Box 3707, Seattle,
Washington 98124-2207, for a copy of this service information. You
may review copies at the Docket Management Facility, U.S. Department
of Transportation, 400 Seventh Street SW., room PL-401, Nassif
Building, Washington, DC; on the Internet at <a href="http://dms.dot.gov">http://dms.dot.gov</a>; or
at the National Archives and Records Administration (NARA). For
information on the availability of this material at the NARA, call
(202) 741-6030, or go to <a href="http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html">http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html</a>.
Issued in Renton, Washington, on November 7, 2005.
Kalene C. Yanamura,
Acting Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 05-22591 Filed 11-15-05; 8:45 am]
BILLING CODE 4910-13-P
Source: Official FAA Source ↗
Retrieved: Apr 6, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.