AD 2005-08-02
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | Embraer | EMB-135 -145 | Airworthiness Directives; Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model EMB-135 and -145 Series Airplanes |
Unsafe Condition
Ignition source in the fuel tank or adjacent dry bay, which could result in fire or explosion.
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Inspect electrical connectors of electric fuel pumps to detect discrepancies; replace discrepant fuel pumps based on new criteria; apply anti-corrosion spray; replace all fuel pumps with improved fuel pumps; conduct repetitive inspections after all six fuel pumps are replaced.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
Within 1,200 flight hours for initial inspections, with subsequent inspections at intervals not to exceed 8,000 flight cycles.
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
EMBRAER Model EMB-135 and -145 series airplanes.
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
The FAA is superseding an existing airworthiness directive (AD), which applies to all EMBRAER Model EMB-135 and -145 series airplanes. That AD currently requires repetitive inspections of the electrical connectors of the electric fuel pumps to detect discrepancies, and follow-on corrective actions. This new AD extends the repetitive intervals for the inspections; adds new criteria for replacing discrepant fuel pumps; adds a new requirement for applying anti-corrosion spray; adds a requirement to replace all fuel pumps with improved fuel pumps; and adds repetitive inspections after all six fuel pumps are replaced. This AD is prompted by the manufacturer's development of a new modification that addresses the unsafe condition in the existing AD. We are issuing this AD to prevent an ignition source in the fuel tank or adjacent dry bay, which could result in fire or explosion.
Document Text
Show stored source text (verify against official source)
[Federal Register Volume 70, Number 71 (Thursday, April 14, 2005)]
[Rules and Regulations]
[Pages 19685-19688]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 05-7282]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2004-19176; Directorate Identifier 2003-NM-36-AD;
Amendment 39-14054; AD 2005-08-02]
RIN 2120-AA64
Airworthiness Directives; Empresa Brasileira de Aeronautica S.A.
(EMBRAER) Model EMB-135 and -145 Series Airplanes
AGENCY: Federal Aviation Administration (FAA), Department of
Transportation (DOT).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The FAA is superseding an existing airworthiness directive
(AD), which applies to all EMBRAER Model EMB-135 and -145 series
airplanes. That AD currently requires repetitive inspections of the
electrical connectors of the electric fuel pumps to detect
discrepancies, and follow-on corrective actions. This new AD extends
the repetitive intervals for the inspections; adds new criteria for
replacing discrepant fuel pumps; adds a new requirement for applying
anti-corrosion spray; adds a requirement to replace all fuel pumps with
improved fuel pumps; and adds repetitive inspections after all six fuel
pumps are replaced. This AD is prompted by the manufacturer's
development of a new modification that addresses the unsafe condition
in the existing AD. We are issuing this AD to prevent an ignition
source in the fuel tank or adjacent dry bay, which could result in fire
or explosion.
DATES: This AD becomes effective May 19, 2005.
The incorporation by reference of certain service information, as
listed in the AD, is approved by the Director of the Federal Register
as of May 19, 2005.
On October 3, 2000 (65 FR 56233, September 18, 2000), the Director
of the Federal Register approved the incorporation by reference of
certain other service information.
ADDRESSES: For service information identified in this AD, contact
Empresa Brasileira de Aeronautica S.A. (EMBRAER), P.O. Box 343--CEP
12.225, Sao Jose dos Campos--SP, Brazil.
Docket: The AD docket contains the proposed AD, comments, and any
final disposition. You can examine the AD docket on the Internet at
<a href="http://dms.dot.gov">http://dms.dot.gov</a>, or in person at the Docket Management Facility
office between 9 a.m. and 5 p.m., Monday through Friday, except Federal
holidays. The Docket Management Facility office (telephone (800) 647-
5227) is located on the plaza level of the Nassif Building at the U.S.
Department of Transportation, 400 Seventh Street SW., room PL-401,
Washington, DC. This docket number is FAA-2004-19176; the directorate
identifier for this docket is 2003-NM-36-AD.
FOR FURTHER INFORMATION CONTACT: Todd Thompson, Aerospace Engineer,
International Branch, ANM-116, FAA, Transport Airplane Directorate,
1601 Lind Avenue, SW., Renton, Washington 98055-4056; telephone (425)
227-1175; fax (425) 227-1149.
SUPPLEMENTARY INFORMATION: The FAA proposed to amend part 39 of the
Federal Aviation Regulations (14 CFR part 39) with an AD to supersede
AD 2000-19-02, amendment 39-11903 (65 FR 56233, September 18, 2000).
The existing AD applies to all EMBRAER Model EMB-135 and -145 series
airplanes. The proposed AD was published in the Federal Register on
September 28, 2004 (69 FR 57888), to extend the repetitive intervals
for the inspections; add new criteria for replacing discrepant fuel
pumps; add a new requirement for applying anti-corrosion spray; add a
requirement to replace all fuel pumps with improved fuel pumps; and add
repetitive inspections after all six fuel pumps are replaced.
Comments
We provided the public the opportunity to participate in the
development of this AD. We have considered the comments that have been
submitted on the proposed AD.
Request to Extend Compliance Time
One commenter, an operator, ended the repetitive inspections
required by AD 2000-19-02 for its fleet after completing an approved
alternative method of compliance (AMOC) with that AD (after all pumps
had been upgraded to part number (P/N) 2C7-4). As a result, the
operator would need more time to reinstitute the inspections specified
in the new proposed AD. The commenter requests that we extend the
proposed compliance time from 1,200 to 2,000 flight hours.
We agree. We find that P/Ns 2C7-4 must be inspected and sprayed
within 8,000 flight cycles after their replacement, and repeated
thereafter at intervals not to exceed 8,000 flight cycles. Therefore,
for airplanes that have all P/N 2C7-4 pumps, we have revised the
initial compliance times specified in paragraph (i) of this AD
accordingly.
Request to Change Replacement Part Requirement
The commenter (the manufacturer) opposes the proposed requirement
to replace P/N 2C7-1 only with P/N 2C7-4. From the parallel Brazilian
airworthiness directive 2000-08-01R2, dated February 13, 2002, the
commenter concludes that the electric fuel pumps with P/Ns 2C7-1 and
2C7-4 would be equally airworthy, if they are inspected within 1,200-
and 8,000-flight-hour intervals, respectively. The commenter adds that
the Brazilian action allows the 8,000-flight-hour interval only when
all pumps on the airplane are P/N 2C7-4. The commenter considers the
procedures of EMBRAER Service Bulletin 145-28-0013, dated April 25,
2001, ``technically acceptable as a `terminal action' to prevent fuel
tanks and surrounding areas from ignition sources.'' (The proposed AD
specified that service bulletin as the source of service information
for the new inspections.) The commenter states that the improvements to
the P/N 2C7-4 pump should allow its repetitive inspection interval to
be extended. The commenter therefore requests that we revise the
proposed AD to change the replacement part in paragraph (k) from a
``new electric fuel pump that has part number (P/N) 2C7-4'' to a
``serviceable component'' and remove paragraphs (l) and (o) from the
proposed AD. (Paragraph (l) would ensure that all pumps are P/N 2C7-4;
paragraph (o) would prohibit installing P/N 2C7-1.) The commenter
provides the following additional support for this request:
<bullet> Periodic inspections and anti-corrosion spray application
within short intervals were effective in avoiding blackened and damaged
P/N 2C7-1 pumps.
<bullet> There have been no reports of failed pumps due to
blackened pins since the service bulletin was released.
<bullet> Pumps with blackened pins have functioned properly when
removed during the required inspections.
<bullet> The results of the manufacturer's SFAR 88 critical
analysis indicate that maintaining a pump having P/N 2C7-1 according to
the service bulletin would fulfill the requirements of the proposed AD.
We agree with the request. We have determined that undamaged pumps
with P/N 2C7-1 will be adequate if they
[[Page 19686]]
are lubricated, sprayed, and inspected within 1,200-flight-hour
intervals. We have revised paragraph (k), removed paragraphs (l) and
(o), and redesignated the paragraphs accordingly in this final rule.
Request To Extend Repetitive Interval
In light of existing operational data, the commenter (an operator)
requests that we extend the proposed repetitive inspection interval
from 8,000 to 10,000 flight hours. The commenter states that this
adjustment would align with current maintenance review board
limitations and save operators considerable expense associated with the
additional maintenance. The commenter adds that the previously
described AMOC for AD 2000-19-02 allowed the inspections of its fleet
to be terminated, and notes that no indications of the identified
issues exist.
We disagree with the request to extend the repetitive interval. The
commenter did not explain how the data would demonstrate that the
unsafe condition would be addressed. If additional data are presented
that would justify a longer compliance time, we may consider further
rulemaking on this issue. In light of this, and in consideration of the
amount of time that has already elapsed since issuance of the original
notice, we have determined that further delay of this final rule is not
appropriate. However, paragraph (n)(1) of this final rule provides
affected operators the opportunity to apply for an adjustment of the
compliance time if the operator also presents data that justify the
adjustment.
Additional Change to Proposed AD
The final sentence of proposed paragraph (i) read as follows:
``Doing the inspection required by this paragraph terminates the
repetitive inspections required by paragraph (f) of this AD.'' We have
revised paragraph (i) in this final rule to clarify that accomplishment
of the initial inspection only is terminating action.
Conclusion
We have carefully reviewed the available data, including the
comments that have been submitted, and determined that air safety and
the public interest require adopting the AD with the changes described
previously. We have determined that these changes will neither increase
the economic burden on any operator nor increase the scope of the AD.
Costs of Compliance
The following table provides the estimated costs for U.S. operators
to comply with this proposed AD.
Estimated Costs
--------------------------------------------------------------------------------------------------------------------------------------------------------
Number of
Average Cost per U.S.-
Action Work hours labor rate Parts airplane registered Fleet cost
per hour airplanes
--------------------------------------------------------------------------------------------------------------------------------------------------------
Inspections (required by AD 1 per inspection $65 None............ $65 per 290 $18,850 inspection per cycle.
2000-19-02). cycle. inspection.
Repetitive inspections (new 1 per inspection $65 None............ $65 per 290 $18,850 per inspection cycle.
proposed action). cycle. inspection
cycle.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, Section 106, describes the
authority of the FAA Administrator. Subtitle VII, Aviation Programs,
describes in more detail the scope of the Agency's authority.
We are issuing this rulemaking under the authority described in
subtitle VII, part A, subpart III, section 44701, ``General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
We have determined that this AD will not have federalism
implications under Executive Order 13132. This AD will not have a
substantial direct effect on the States, on the relationship between
the National Government and the States, or on the distribution of power
and responsibilities among the various levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866;
(2) Is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979); and
(3) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
We prepared a regulatory evaluation of the estimated costs to
comply with this AD. See the ADDRESSES section for a location to
examine the regulatory evaluation.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
0
Accordingly, under the authority delegated to me by the Administrator,
the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by removing amendment 39-11903 (65 FR
56233, September 18, 2000) and adding the following new airworthiness
directive (AD):
2005-08-02 Empresa Brasileira de Aeronautica S.A. (EMBRAER):
Amendment 39-14054. Docket No. FAA-2004-19176; Directorate
Identifier 2003-NM-36-AD.
Effective Date
(a) This AD becomes effective May 19, 2005.
[[Page 19687]]
Affected ADs
(b) This AD supersedes AD 2000-19-02, amendment 39-11903.
Applicability
(c) This AD applies to all EMBRAER Model EMB-135 and -145 series
airplanes, certificated in any category.
Unsafe Condition
(d) This AD was prompted by the manufacturer's development of a
new modification that addresses the unsafe condition in AD 2000-19-
02. We are issuing this AD to prevent an ignition source in the fuel
tank or adjacent dry bay, which could result in fire or explosion.
Compliance
(e) You are responsible for having the actions required by this
AD performed within the compliance times specified, unless the
actions have already been done.
Restatement of the Requirements of AD 2000-19-02
Repetitive Inspections
(f) Perform a general visual inspection of the electrical
connectors of the fuel pumps in the right- and left-hand wings to
detect discrepancies (including blackened connector pins, damage to
electrometric insert, cracks, erosion, or charring), in accordance
with EMBRAER Alert Service Bulletin S.B. 145-28-A013, dated August
16, 2000, at the times specified in paragraphs (f)(1), (f)(2), and
(f)(3) of this AD, as applicable. Repeat the inspection thereafter
at intervals not to exceed 400 flight hours until the inspection
required by paragraph (i) of this AD is done.
(1) For airplanes having 1,200 total flight hours or less as of
October 3, 2000 (the effective date of AD 2000-19-02, amendment 39-
11903): Prior to the accumulation of 1,600 total flight hours.
(2) For airplanes having more than 1,200 total flight hours, but
less than 4,000 total flight hours, as of October 3, 2000: Within
400 flight hours after October 3, 2000.
(3) For airplanes having 4,000 total flight hours or more as of
October 3, 2000: Prior to the accumulation of 4,400 total flight
hours, or within 50 flight hours after October 3, 2000, whichever
occurs later.
Note 1: For the purposes of this AD, a general visual inspection
is ``a visual examination of a interior or exterior area,
installation or assembly to detect obvious damage, failure or
irregularity. This level of inspection is made from within touching
distance unless otherwise specified. A mirror may be necessary to
ensure visual access to all surfaces in the inspection area. This
level of inspection is made under normal available lighting
conditions such as daylight, hangar lighting, flashlight or drop-
light and may require removal or opening of access panels or doors.
Stands, ladders or platforms may be required to gain proximity to
the area being checked.''
Follow-On Corrective Actions
(g) If any discrepancy (including blackened connector pins,
damage to electrometric insert, cracks, erosion, or charring) is
detected after accomplishment of any inspection required by
paragraph (f) of this AD: Before further flight, replace the fuel
pump and its mating airplane connector in accordance with EMBRAER
Alert Service Bulletin S.B. 145-28-A013, dated August 16, 2000.
(h) After accomplishment of the replacement required by
paragraph (g) of this AD, before further flight: Perform a general
visual inspection of the electrical connectors adjacent to the fuel
pump to detect damage (visible cracks, erosion, or charring), in
accordance with EMBRAER Alert Service Bulletin S.B. 145-28-A013,
dated August 16, 2000, and accomplish the requirements in paragraph
(h)(1) or (h)(2) of this AD, as applicable.
(1) If any damage is detected, before further flight, replace
the connectors with new ones in accordance with the alert service
bulletin.
(2) If no damage is detected, before further flight, replace
only the socket contacts with new contacts in accordance with the
alert service bulletin.
New Requirements of This AD
Inspections
(i) Do a general visual inspection of the electrical connectors
of the fuel pumps in the right- and left-hand wings to detect
discrepancies (including any corrosion, surface irregularities,
damaged plating, blackened pins, damaged elastomeric inserts,
cracks, erosion, or charring of the connector). Do the first
inspection at the applicable time in paragraph (i)(1), (i)(2), or
(i)(3) of this AD, in accordance with part I of the Accomplishment
Instructions of EMBRAER Service Bulletin 145-28-0013, dated April
25, 2001. Repeat the inspection thereafter at intervals not to
exceed 1,200 flight hours until all six fuel pumps are replaced with
P/N 2C7-4 pumps. When all six fuel pumps have been replaced with P/N
2C7-4 pumps, repeat the inspection thereafter at intervals not to
exceed 8,000 flight hours. Doing the initial inspection required by
this paragraph terminates the repetitive inspections required by
paragraph (f) of this AD.
(1) For airplanes that have been inspected in accordance with
paragraph (f) of this AD as of the effective date of this AD but do
not have all six P/N 2C7-4 pumps: Within 1,200 flight hours since
the most recent inspection done in accordance with paragraph (f) of
this AD.
(2) For airplanes inspected in accordance with paragraph (f) of
this AD as of the effective date of this AD that have all six P/N
2C7-4 pumps: Within 8,000 flight cycles since replacement of all six
pumps with P/N 2C7-4 pumps, or within 2,000 flight cycles after the
effective date of this AD, whichever occurs later.
(3) For airplanes that have not been inspected in accordance
with paragraph (f) of this AD as of the effective date of this AD:
Within 1,200 flight hours after the effective date of this AD.
Corrective Action If No Discrepancy Is Found
(j) If there is no evidence of a discrepancy found during any
inspection required by paragraph (i) of this AD: Before further
flight, apply anti-corrosion spray on the male contacts of the fuel
pump electrical connectors in accordance with the Accomplishment
Instructions of EMBRAER Service Bulletin 145-28-0013, dated April
25, 2001.
Replacement If Any Discrepancy Is Found
(k) If any evidence of a discrepancy is found during any
inspection required by paragraph (i) of this AD: Before further
flight, replace the electric fuel pump with a serviceable pump in
accordance with the Accomplishment Instructions of EMBRAER Service
Bulletin 145-28-0013, dated April 25, 2001. After the replacement,
repeat the inspection required by paragraph (i) of this AD at the
applicable interval in that paragraph.
Inspection and Corrective Actions
(l) Before further flight after replacing a fuel pump, as
required by paragraph (k) of this AD: Do a general visual inspection
for damage of the mating aircraft connectors; and do the applicable
corrective action in paragraph (l)(1) or (l)(2) of this AD; in
accordance with the Accomplishment Instructions of EMBRAER Service
Bulletin 145-28-0013, dated April 25, 2001.
(1) If there is any sign of damage to the mating aircraft
connectors: Replace the affected connector with a new connector, and
apply anti-corrosion spray on the male contacts of the fuel pump
electric connectors.
(2) If there is no sign of damage to the mating aircraft
connectors: Replace only the socket contacts with new socket
contacts, and apply anti-corrosion spray on the male contacts of the
fuel pump electric connectors.
Master Minimum Equipment List (MMEL)
(m) The inspections required by paragraphs (f) and (i) of this
AD apply to the six electric fuel pumps in the right- and left-hand
wings (three pumps in each wing). For pump replacement planning
purposes, the airplane may be operated in accordance with the
provisions and limitations specified in an operator's FAA-approved
MMEL, provided that no more than one fuel pump on each wing on the
airplane is inoperative.
Note 2: When operating under the MMEL, operators must comply
with the unusable fuel quantity as referenced in the Limitations
Section of the appropriate FAA-approved Airplane Flight Manual.
Alternative Methods of Compliance (AMOCs)
(n)(1) The Manager, International Branch, ANM-116, Transport
Airplane Directorate, FAA, has the authority to approve AMOCs for
this AD, if requested using the procedures found in 14 CFR 39.19.
(2) Alternative methods of compliance, approved previously per
AD 2000-19-02, amendment 39-11903, are not approved as alternative
methods of compliance with this AD.
Related Information
(o) Brazilian airworthiness directive 2000-08-01R2, dated
February 13, 2002, also addresses the subject of this AD.
[[Page 19688]]
Material Incorporated by Reference
(p) You must use EMBRAER Alert Service Bulletin S.B. 145-28-
A013, dated August 16, 2000; and EMBRAER Service Bulletin 145-28-
0013, dated April 25, 2001; as applicable; to perform the actions
that are required by this AD, unless the AD specifies otherwise.
(1) The incorporation by reference of EMBRAER Service Bulletin
145-28-0013, dated April 25, 2001, is approved by the Director of
the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR
part 51.
(2) The incorporation by reference of EMBRAER Alert Service
Bulletin S.B. 145-28-A013, dated August 16, 2000, was approved
previously by the Director of the Federal Register as of October 3,
2000 (65 FR 56233, September 18, 2000).
(3) Copies may be obtained from Empresa Brasileira de
Aeronautica S.A. (EMBRAER), P.O. Box 343--CEP 12.225, Sao Jose dos
Campos--SP, Brazil. Copies may be inspected at the FAA, Transport
Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or
at the National Archives and Records Administration (NARA). For
information on the availability of this material at NARA, call (202)
741-6030, or go to <a href="http://www.archives.gov/">http://www.archives.gov/</a> federal--register/code--
of--federal--regulations/ ibr--locations.html.
Issued in Renton, Washington, on April 1, 2005.
Kalene C. Yanamura,
Acting Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 05-7282 Filed 4-13-05; 8:45 am]
BILLING CODE 4910-13-P
Source: Official FAA Source ↗
Retrieved: Apr 4, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.