AD 2004-18-09
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | The Boeing Company | 777-200 Series | Airworthiness Directives; Boeing Model 777 Series Airplanes |
| aircraft | The Boeing Company | 777-300 Series | Airworthiness Directives; Boeing Model 777 Series Airplanes |
Unsafe Condition
Possible source of ignition in a flammable leakage zone, which could result in an undetected and uncontrollable fire in the wheel well or wing trailing edge, and a possible fuel tank explosion.
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Replace the socket contacts in positions 2, 4, 6, and 7 of the four boost pumps of the main fuel tanks with new, high-quality gold-plated contacts, and seal the backshell of the connector with potting compound, in accordance with Boeing Service Bulletin 777-28-0028, Revision 1.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
Within 18 months after the effective date of this AD.
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
Boeing Model 777-200 and 777-300 series airplanes, line numbers 001 through 400 inclusive, certificated in any category.
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
This amendment adopts a new airworthiness directive (AD), applicable to certain Boeing Model 777 series airplanes, that requires replacing four socket contacts on the four boost pumps of the main fuel tanks with new, high-quality gold-plated contacts, and sealing the backshell of the connector with potting compound. This action is necessary to prevent a possible source of ignition in a flammable leakage zone, which could result in an undetected and uncontrollable fire in the wheel well or wing trailing edge, and a possible fuel tank explosion. This action is intended to address the identified unsafe condition.
Document Text
Show stored source text (verify against official source)
[Federal Register Volume 69, Number 177 (Tuesday, September 14, 2004)]
[Rules and Regulations]
[Pages 55320-55321]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 04-20119]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. 2002-NM-305-AD; Amendment 39-13787; AD 2004-18-09]
RIN 2120-AA64
Airworthiness Directives; Boeing Model 777 Series Airplanes
AGENCY: Federal Aviation Administration, DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: This amendment adopts a new airworthiness directive (AD),
applicable to certain Boeing Model 777 series airplanes, that requires
replacing four socket contacts on the four boost pumps of the main fuel
tanks with new, high-quality gold-plated contacts, and sealing the
backshell of the connector with potting compound. This action is
necessary to prevent a possible source of ignition in a flammable
leakage zone, which could result in an undetected and uncontrollable
fire in the wheel well or wing trailing edge, and a possible fuel tank
explosion. This action is intended to address the identified unsafe
condition.
DATES: Effective October 19, 2004.
The incorporation by reference of a certain publication listed in
the regulations is approved by the Director of the Federal Register as
of October 19, 2004.
ADDRESSES: The service information referenced in this AD may be
obtained from Boeing Commercial Airplanes, P.O. Box 3707, Seattle,
Washington 98124-2207. This information may be examined at the Federal
Aviation Administration (FAA), Transport Airplane Directorate, Rules
Docket, 1601 Lind Avenue, SW., Renton, Washington; or at the National
Archives and Records Administration (NARA). For information on the
availability of this material at NARA, call (202) 741-6030, or go to:
<a href="http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html">http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html</a>.
FOR FURTHER INFORMATION CONTACT: Margaret Langsted, Aerospace Engineer,
Propulsion Branch, ANM-140S, FAA, Seattle Aircraft Certification
Office, 1601 Lind Avenue, SW., Renton, Washington; telephone (425) 917-
6500; fax (425) 917-6590.
SUPPLEMENTARY INFORMATION: A proposal to amend part 39 of the Federal
Aviation Regulations (14 CFR part 39) to include an airworthiness
directive (AD) that is applicable to certain Boeing Model 777 series
airplanes was published in the Federal Register on December 8, 2003 (68
FR 68311). That action proposed to require replacing four socket
contacts on the four boost pumps of the main fuel tanks with new, high-
quality gold-plated contacts, and sealing the backshell of the
connector with potting compound.
Comments
Interested persons have been afforded an opportunity to participate
in the making of this amendment. Due consideration has been given to
the comments received.
Support for Notice of Proposed Rulemaking (NPRM)
Two commenters generally support the intent of the NPRM.
Request To Reference Latest Service Bulletin
One of the two commenters requests that the NPRM be revised to
refer to Boeing Special Attention Service Bulletin 777-28-0028,
Revision 1 or latest revision. The commenter notes that the NPRM refers
to Boeing Special Attention Service Bulletin 777-28-0028, dated October
24, 2002, as the appropriate source of service information for the
proposed actions. Based on Boeing Service Bulletin Information Notice
777-28-0028 IN 01, dated February 13, 2003, the commenter states that
the airplane manufacturer is planning to revise the subject service
bulletin.
The FAA agrees with the commenter to refer to Revision 1 of Boeing
Service Bulletin 777-28-0028, dated July 15, 2004. Since the issuance
of the NPRM, we have reviewed Revision 1. Revision 1 is essentially
identical to the original issue of the service bulletin, which is
referred to as the appropriate source of service information in the
NPRM. No more work is necessary on airplanes changed as shown in the
original issue. The only relevant changes are a revised listing of
current operators of affected airplanes. Revision 1 incorrectly refers
to June 06, 2002, as the date of issuance of the original issue of the
service bulletin; the correct date is October 24, 2002. We have revised
the final rule to refer to Revision 1 as the appropriate source of
service information for the required actions and to include a new
paragraph that gives operators credit for accomplishing the required
actions before the effective date of this AD in accordance with
original issue.
Request To Revise Work Hour Estimate
One commenter states that the labor estimate of 4 work hours in the
Cost Impact section of the NPRM is unrealistic. The commenter states
that there are four main tank boost pump positions, and that four work
hours per airplane equates to one work hour per pump position. The
commenter also states that the proposed replacement is comprised of the
following tasks: preparing the airplane for rework, gaining access to
each pump connector, re-terminating four sockets per connector, potting
in connector sealant, etc. Excluding the sealant cure time, the
commenter estimates that labor work hours are approximately three hours
per pump position or 12 work hours per airplane.
From this comment, we infer that the commenter is requesting that
the work hour estimate in the Cost Impact section of the NPRM be
revised. We partially agree. We do agree that the work hour estimate
can be increased, but only somewhat. The cost impact information,
below, describes only the ``direct'' costs of the specific actions
required by this AD. The number of work hours necessary to accomplish
the required actions represents the time necessary to perform the
replacement required by this AD. We recognize that, in accomplishing
the requirements of any AD, operators may incur ``incidental'' costs in
addition to the ``direct'' costs. The cost analysis in AD rulemaking
actions, however, typically does not include incidental costs, such as
the time required to gain access and close up; planning time; or time
necessitated by other administrative actions. Because incidental costs
may vary significantly from operator to operator, they are almost
impossible to calculate. Therefore, based on the information
[[Page 55321]]
supplied by the commenter, we now recognize that it will take
approximately 6 work hours per airplane to accomplish the required
actions. We have revised the Cost Impact section of the final rule
accordingly.
Conclusion
After careful review of the available data, including the comments
noted above, we have determined that air safety and the public interest
require the adoption of the rule with the changes previously described.
We have determined that these changes will neither increase the
economic burden on any operator nor increase the scope of the AD.
Cost Impact
There are approximately 400 airplanes of the affected design in the
worldwide fleet. We estimate that 133 airplanes of U.S. registry will
be affected by this AD, that it will take approximately 6 work hours
per airplane to accomplish the required actions, and that the average
labor rate is $65 per work hour. Required parts will cost approximately
$19 per airplane. Based on these figures, the cost impact of the AD on
U.S. operators is estimated to be $54,397, or $409 per airplane.
The cost impact figure discussed above is based on assumptions that
no operator has yet accomplished any of the requirements of this AD
action, and that no operator would accomplish those actions in the
future if this AD were not adopted. The cost impact figures discussed
in AD rulemaking actions represent only the time necessary to perform
the specific actions actually required by the AD. These figures
typically do not include incidental costs, such as the time required to
gain access and close up, planning time, or time necessitated by other
administrative actions. The manufacturer may cover the cost of
replacement parts associated with this AD, subject to warranty
conditions. Manufacturer warranty remedies may also be available for
labor costs associated with this AD. As a result, the costs
attributable to the AD may be less than stated above.
Regulatory Impact
The regulations adopted herein will not have a substantial direct
effect on the States, on the relationship between the national
Government and the States, or on the distribution of power and
responsibilities among the various levels of government. Therefore, it
is determined that this final rule does not have federalism
implications under Executive Order 13132.
For the reasons discussed above, I certify that this action (1) is
not a ``significant regulatory action'' under Executive Order 12866;
(2) is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a
significant economic impact, positive or negative, on a substantial
number of small entities under the criteria of the Regulatory
Flexibility Act. A final evaluation has been prepared for this action
and it is contained in the Rules Docket. A copy of it may be obtained
from the Rules Docket at the location provided under the caption
ADDRESSES.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
0
Accordingly, pursuant to the authority delegated to me by the
Administrator, the Federal Aviation Administration amends part 39 of
the Federal Aviation Regulations (14 CFR part 39) as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. Section 39.13 is amended by adding the following new airworthiness
directive:
2004-18-09 Boeing: Amendment 39-13787. Docket 2002-NM-305-AD.
Applicability: Model 777-200 and 777-300 series airplanes, line
numbers 001 through 400 inclusive, certificated in any category.
Compliance: Required as indicated, unless accomplished
previously.
To prevent a possible source of ignition in a flammable leakage
zone, which could result in an undetected and uncontrollable fire in
the wheel well or wing trailing edge, and a possible fuel tank
explosion, accomplish the following:
Replace and Seal
(a) Within 18 months after the effective date of this AD, for
all four boost pumps of the main fuel tanks, replace the socket
contacts in positions 2, 4, 6, and 7 with new, high-quality gold-
plated contacts; and seal the backshell of the connector with
potting compound; in accordance with the Accomplishment Instructions
of Boeing Service Bulletin 777-28-0028, Revision 1, dated July 15,
2004.
Note 1: Revision 1 of Boeing Service Bulletin 777-28-0028
incorrectly refers to June 06, 2002, as the date of issuance of the
original issue of the service bulletin; the correct date is October
24, 2002.
(b) Replacements done before the effective date of this AD in
accordance with Boeing Special Attention Service Bulletin 777-28-
0028, dated October 24, 2002, as revised by Boeing Service Bulletin
Information Notice 777-28-0028 IN 01, dated February 13, 2003; are
acceptable for compliance with the requirements of paragraph (a) of
this AD.
Alternative Methods of Compliance
(c) In accordance with 14 CFR 39.19, the Manager, Seattle
Aircraft Certification Office, FAA, is authorized to approve
alternative methods of compliance (AMOCs) for this AD.
Incorporation by Reference
(d) The actions shall be done in accordance with Boeing Service
Bulletin 777-28-0028, Revision 1, dated July 15, 2004. This
incorporation by reference was approved by the Director of the
Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part
51. Copies may be obtained from Boeing Commercial Airplanes, P.O.
Box 3707, Seattle, Washington 98124-2207. Copies may be inspected at
the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW.,
Renton, Washington; or at the National Archives and Records
Administration (NARA). For information on the availability of this
material at NARA, call (202) 741-6030, or go to: <a href="http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html">http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html</a>.
Effective Date
(e) This amendment becomes effective on October 19, 2004.
Issued in Renton, Washington, on August 25, 2004.
Kevin M. Mullin,
Acting Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 04-20119 Filed 9-13-04; 8:45 am]
BILLING CODE 4910-13-P
Source: Official FAA Source ↗
Retrieved: Apr 6, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.