AD 2004-14-25

final rule
Data completeness: 70%

Airworthiness Directives; Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model EMB-120 Series Airplanes

AD Number
2004-14-25
Status
final_rule
Effective Date
Product Category
aircraft
Docket
Docket No. 2004-NM-48-AD
FR Citation
69 FR 42860

Applicability

TypeManufacturerModelDetails
aircraft Embraer Various Airworthiness Directives; Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model EMB-120 Series Airplanes

Unsafe Condition

Possible multiple avionics failures caused by a lightning strike, which could reduce the ability of the flightcrew to control the airplane.

AI-generated summary from the source AD text. Verify against the official source before acting.

Required Actions

Install a lightning bonding jumper from the lower rotating beacon to the airframe in accordance with EMBRAER Service Bulletin 120-33-0037.

AI-generated summary from the source AD text. Verify against the official source before acting.

Compliance Time

Within 4,000 flight hours or 30 months after the effective date of this AD, whichever comes first.

AI-generated summary from the source AD text. Verify against the official source before acting.

Affected Aircraft

Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model EMB-120 series airplanes, serial numbers 120004, and 120006 through 120359 inclusive; certificated in any category.

AI-generated summary from the source AD text. Verify against the official source before acting.

Source: Official FAA Source ↗

Retrieved: Apr 6, 2026

Rights: U.S. Government Public Domain

This site is not affiliated with or endorsed by the FAA. Always verify with official sources.