AD 2004-09-11
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | The Boeing Company | 767-200 Series | Airworthiness Directives; Boeing Model 767-200, -300, and -300F Series Airplanes |
| aircraft | The Boeing Company | 767-300 Series | Airworthiness Directives; Boeing Model 767-200, -300, and -300F Series Airplanes |
| aircraft | The Boeing Company | 767-300F Series | Airworthiness Directives; Boeing Model 767-200, -300, and -300F Series Airplanes |
Unsafe Condition
Cracks in the outer cylinder of the main landing gear (MLG) between the downlock fitting attach lugs, which could lead to MLG collapse and reduced controllability during takeoff and landing.
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Perform gap measurements of the upper and lower joint gaps for both main landing gears. Conduct an ultrasonic inspection of the outer cylinder of the MLG for cracks between the downlock fitting attach lugs. Take follow-on and corrective actions if necessary.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
Before further flight.
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
Boeing Model 767-200, -300, and -300F series airplanes.
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
This amendment adopts a new airworthiness directive (AD), applicable to certain Boeing Model 767-200, -300, and -300F series airplanes, that requires performing, for both main landing gear (MLG), gap measurements of the upper and lower joint gaps; an ultrasonic inspection of the outer cylinder of the MLG for cracks between the downlock fitting attach lugs; and follow-on and corrective actions if necessary. This action is necessary to detect and correct cracks in the outer cylinder of the MLG, which could result in collapsed MLG and consequent reduced controllability of the airplane during takeoff and landing. This action is intended to address the identified unsafe condition.
Document Text
Show stored source text (verify against official source)
[Federal Register Volume 69, Number 84 (Friday, April 30, 2004)]
[Rules and Regulations]
[Pages 23644-23646]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 04-9590]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. 2002-NM-198-AD; Amendment 39-13600; AD 2004-09-11]
RIN 2120-AA64
Airworthiness Directives; Boeing Model 767-200, -300, and -300F
Series Airplanes
AGENCY: Federal Aviation Administration, DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: This amendment adopts a new airworthiness directive (AD),
applicable to certain Boeing Model 767-200, -300, and -300F series
airplanes, that requires performing, for both main landing gear (MLG),
gap measurements of the upper and lower joint gaps; an ultrasonic
inspection of the outer cylinder of the MLG for cracks between the
downlock fitting attach lugs; and follow-on and corrective actions if
necessary. This action is necessary to detect and correct cracks in the
outer cylinder of the MLG, which could result in collapsed MLG and
consequent reduced controllability of the airplane during takeoff and
landing. This action is intended to address the identified unsafe
condition.
DATES: Effective June 4, 2004.
The incorporation by reference of a certain publication listed in
the regulations is approved by the Director of the Federal Register as
of June 4, 2004.
ADDRESSES: The service information referenced in this AD may be
obtained from Boeing Commercial Airplanes, P.O. Box 3707, Seattle,
Washington 98124-2207. This information may be examined at the Federal
Aviation Administration (FAA), Transport Airplane Directorate, Rules
Docket, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of
the Federal Register, 800 North Capitol Street, NW., suite 700,
Washington, DC.
FOR FURTHER INFORMATION CONTACT: Suzanne Masterson, Aerospace Engineer,
Airframe Branch, ANM-120S, FAA, Seattle Aircraft Certification Office,
1601 Lind Avenue, SW., Renton, Washington 98055-4056; telephone (425)
917-6441; fax (425) 917-6590.
SUPPLEMENTARY INFORMATION: A proposal to amend part 39 of the Federal
Aviation Regulations (14 CFR part 39) to include an airworthiness
directive (AD) that is applicable to certain Boeing Model 767-200, -
300, and -300F series airplanes was published in the Federal Register
on December 5, 2003 (68 FR 67973). That action proposed to require
performing, for both main landing gear (MLG), gap measurements of the
upper and lower joint gaps; an ultrasonic inspection of the outer
cylinder of the MLG for cracks between the downlock fitting attach
lugs; and follow-on and corrective actions if necessary.
Comments
Interested persons have been afforded an opportunity to participate
in the making of this amendment. Due consideration has been given to
the comments received.
Request To Add Overhaul/Replacement Option
One commenter requests that an option for overhaul or replacement
be added to paragraph (b) of the proposed AD. The commenter notes that
paragraph (b) of the proposed AD only states to do a gap measurement
and inspection per Part 1 of the service bulletin and does not give
operators an option to do the overhaul or replacement per Part 2 of the
service bulletin. The commenter contends that overhauled or new outer
cylinders would have been adequately inspected prior to installation,
and the identified unsafe condition would have been detected and
corrected.
The FAA agrees with the commenter that an option to do the
inspection should be added allowing operators to replace the outer
cylinder of the main landing gear with a new or overhauled outer
cylinder. New or overhauled outer cylinders would have been inspected
prior to the installation, and the identified unsafe condition would
have been detected and corrected. We have revised paragraph (b) of the
final rule and added paragraph (b)(2) to the final rule to give
operators an option to ``Replace the outer cylinder of the main landing
gear with a new or overhauled outer cylinder per Part 2 of the service
bulletin.''
Request To Refer to Component Maintenance Manual (CMM)
One commenter requests that the reference in paragraph (e) of the
proposed AD be changed from the ``service bulletin'' to ``CMM 32-11-
40.'' The commenter notes that the service bulletin does not contain
the repair limits; the service bulletin refers to CMM 32-11-40 for
repair limits. The commenter concludes that it may be more correct to
refer CMM 32-11-40 for repair limits.
We do not agree with the commenter's request to change the
reference in paragraph (e) of the proposed AD to CMM 32-11-40.
Paragraph (e) of the proposed AD states, ``* * * the repair limits
specified in the service bulletin,'' and the service bulletin specifies
the repair limits in CMM 32-11-40. Therefore, the repair limits are
adequately defined by the wording in the AD. No change to the final
rule is necessary in this regard.
Request To Revise ``Parts Installation'' Paragraph (g) of the Proposed
AD
One commenter requests that we revise ``Parts Installation''
paragraph (g) of the proposed AD to allow operators to install outer
cylinders that have been inspected internally during overhaul. The
commenter contends that overhauled outer cylinders would have been
inspected prior to installation, and the identified unsafe condition
would have been detected and corrected. The commenter recommends
revising paragraph (g) of the proposed AD to ``As of the effective date
of this AD, no person may install a MLG on any airplane, unless the
outer cylinder of the MLG has been inspected internally during
overhaul, or externally per Boeing Service Bulletin 767-32A0196,
Revision 2, and follow-on and corrective actions have been accomplished
per Boeing Service Bulletin 767-32A0196, Revision 2, dated May 15,
2003.''
[[Page 23645]]
We agree with the commenter that ``Parts Installation'' paragraph
(g) of the proposed AD should be revised. However, we do not agree with
the commenter's suggestion to add the phrase ``* * * internally during
overhaul, or externally per Boeing Service Bulletin 767-32A0196,
Revision 2,'' to paragraph (g) of the proposed AD. Operators may not
receive inspection paperwork for overhauled outer cylinders so it may
be difficult for operators to show compliance for outer cylinders
``inspected internally during overhaul.'' We do agree with the
commenter that overhauled outer cylinders would not have the identified
unsafe condition. In addition, new outer cylinders would also not have
the identified unsafe condition. Accordingly, we have revised ``Parts
Installation'' paragraph (g) of the final rule by adding ``or unless
the outer cylinder is new; or unless the outer cylinder has not been
installed on any airplane since its last overhaul.''
Request To Clarify Details for Gap Measurements
One commenter requests that the details for gap measurements be
clarified by revising paragraph (b) of the proposed AD to ``* * * do a
gap measurement on the upper and lower attach bolts for both drag and
side strut downlock fittings in accordance with Figure 1 of Boeing
Service Bulletin 767-32A0196 * * *.'' The commenter notes that the
service bulletin specifies that two sets of gap measurements be taken
for the side and drag strut downlock fittings.
We do not agree with the commenter's request to clarify the details
for gap measurements. The wording in the proposed AD is taken from the
steps in Figure 1 of the service bulletin and the actions are to be
done ``per Part 1 of the service bulletin.'' Part 1 of the service
bulletin contains drawings and notes that show the details for the gap
measurements. Therefore, there is not a need for a greater level of
detail in the final rule.
Request To Add Text Showing That Gap Measurements Provide Data
Supporting the Inspection and That the Manufacturer Can Be Contacted
One commenter requests text be added to the proposed AD that shows
gap measurements can be used to provide data to support the inspection
and that the manufacturer may be contacted to interpret the gap
measurement results.
We do not agree with the commenter's request to add text to show
gap measurements can be used to provide data to support the inspection
and that the manufacturer may be contacted. Contacting the manufacturer
for assistance with the inspection is not a mandatory action and,
therefore, is not included in the proposed AD. The service bulletin
does state that if operators contact the manufacturer, the manufacturer
needs the gap measurement data. There is no need to restate this fact
in the proposed AD. Operators should have gap measurement data
available if needed, as paragraph (b) of the proposed AD requires
operators to take gap measurements. No change is necessary to the final
rule.
Conclusion
After careful review of the available data, including the comments
noted above, the FAA has determined that air safety and the public
interest require the adoption of the rule with the changes previously
described. The FAA has determined that these changes will neither
increase the economic burden on any operator nor increase the scope of
the AD.
Cost Impact
There are approximately 833 airplanes of the affected design in the
worldwide fleet. The FAA estimates that 353 airplanes of U.S. registry
will be affected by this AD, that it would take approximately 16 work
hours per airplane to accomplish the required gap measurement and
inspection, and that the average labor rate is $65 per work hour. Based
on these figures, the cost impact of the AD on U.S. operators is
estimated to be $367,120, or $1,040 per airplane.
The cost impact figure discussed above is based on assumptions that
no operator has yet accomplished any of the proposed requirements of
this AD action, and that no operator would accomplish those actions in
the future if this AD were not adopted. The cost impact figures
discussed in AD rulemaking actions represent only the time necessary to
perform the specific actions actually required by the AD. These figures
typically do not include incidental costs, such as the time required to
gain access and close up, planning time, or time necessitated by other
administrative actions. Manufacturer warranty remedies may be available
for labor costs associated with this AD. As a result, the costs
attributable to the AD may be less than stated above.
Regulatory Impact
The regulations adopted herein will not have a substantial direct
effect on the States, on the relationship between the national
government and the States, or on the distribution of power and
responsibilities among the various levels of government. Therefore, it
is determined that this final rule does not have federalism
implications under Executive Order 13132.
For the reasons discussed above, I certify that this action (1) is
not a ``significant regulatory action'' under Executive Order 12866;
(2) is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a
significant economic impact, positive or negative, on a substantial
number of small entities under the criteria of the Regulatory
Flexibility Act. A final evaluation has been prepared for this action
and it is contained in the Rules Docket. A copy of it may be obtained
from the Rules Docket at the location provided under the caption
ADDRESSES.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
0
Accordingly, pursuant to the authority delegated to me by the
Administrator, the Federal Aviation Administration amends part 39 of
the Federal Aviation Regulations (14 CFR part 39) as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. Section 39.13 is amended by adding the following new airworthiness
directive:
2004-09-11 Boeing: Amendment 39-13600. Docket 2002-NM-198-AD.
Applicability: Model 767-200, -300, and -300F series airplanes,
line numbers 1 through 883 inclusive; certificated in any category.
Compliance: Required as indicated, unless accomplished
previously.
To detect and correct cracks in the outer cylinder of the main
landing gear (MLG), which could result in collapsed MLG and
consequent reduced controllability of the airplane during takeoff
and landing, accomplish the following:
Service Bulletin References
(a) The term ``service bulletin,'' as used in this AD, means the
Accomplishment Instructions of Boeing Service Bulletin 767-32A0196,
Revision 2, dated May 15, 2003.
[[Page 23646]]
Inspection or Replacement and Corrective Actions
(b) Within 18 months after the effective date of this AD, for
both MLG, do the actions in either paragraph (b)(1) or (b)(2) of
this AD.
(1) Perform a gap measurement of the upper and lower joint gaps
(includes measuring and recording upper and lower joint gaps twice);
and an ultrasonic inspection of the outer cylinder of the main
landing gear for cracks between the downlock fitting attach lugs,
per Part 1 of the service bulletin.
(2) Replace the outer cylinder of the main landing gear with a
new or overhauled outer cylinder per Part 2 of the service bulletin.
(c) If no crack is found during the inspection required by
paragraph (b)(1) of this AD, before further flight, do the
restoration (includes installing shims as applicable, electrical
bracket, and cotter pins; and marking the main landing gear) per the
service bulletin.
(d) If any crack is found during the inspection required by
paragraph (b)(1) of this AD: Before further flight, overhaul the
outer cylinder of the MLG or replace the outer cylinder of the MLG
with an interchangeable outer cylinder per Part 2 of the service
bulletin, except as provided by paragraph (e) of this AD.
(e) If any crack is found in the outer cylinder that cannot be
removed within the repair limits specified in the service bulletin,
during the overhaul specified in paragraph (d) of this AD, and the
service bulletin specifies to contact Boeing for appropriate action:
Before further flight, repair per a method approved by the Manager,
Seattle Aircraft Certification Office (ACO), FAA; or per data
meeting the type certification basis of the airplane approved by a
Boeing Company Designated Engineering Representative who has been
authorized by the Manager, Seattle ACO, to make such findings. For a
repair method to be approved, the approval must specifically
reference this AD.
Note 1: When the outer cylinder is re-installed, attach the
downlock fittings onto the outer cylinder as specified in the
applicable Boeing Component Maintenance Manual (CMM), Document
Number 161T1000, Section 32-11-19, Temporary Revision (TR) 32-61,
dated March 26, 2002, or Section 32-11-19, pages 712 through 716,
dated July 1, 2002, or dated July 1, 2003; or CMM Document Number
161T1000, Section 32-11-20, TR 32-62, dated March 26, 2002, or
Section 32-11-20, pages 718 through 722, dated July 1, 2002, or
dated July 1, 2003.
Actions Accomplished Per Previous Issue of Service Bulletin
(f) Accomplishment of the applicable actions before the
effective date of this AD per Boeing Alert Service Bulletin 767-
32A0196, dated August 1, 2002; or Boeing Service Bulletin 767-
32A0196, Revision 1, dated September 26, 2002; are considered
acceptable for compliance with the corresponding action specified in
this AD.
Parts Installation
(g) As of the effective date of this AD, no person may install a
MLG on any airplane, unless the outer cylinder of the MLG has been
inspected and follow-on and corrective actions have been
accomplished per Boeing Service Bulletin 767-32A0196, Revision 2,
dated May 15, 2003; or unless the outer cylinder is new; or unless
the outer cylinder has not been installed on any airplane since its
last overhaul.
Alternative Methods of Compliance
(h) In accordance with 14 CFR 39.19, the Manager, Seattle ACO,
FAA, is authorized to approve alternative methods of compliance for
this AD.
Incorporation by Reference
(i) Unless otherwise specified in this AD, the actions shall be
done in accordance with Boeing Service Bulletin 767-32A0196,
Revision 2, dated May 15, 2003. This incorporation by reference was
approved by the Director of the Federal Register in accordance with
5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from
Boeing Commercial Airplanes, PO Box 3707, Seattle, Washington 98124-
2207. Copies may be inspected at the FAA, Transport Airplane
Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the
Office of the Federal Register, 800 North Capitol Street, NW., suite
700, Washington, DC.
Effective Date
(j) This amendment becomes effective on June 4, 2004.
Issued in Renton, Washington, on April 20, 2004.
Ali Bahrami,
Acting Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 04-9590 Filed 4-29-04; 8:45 am]
BILLING CODE 4910-13-P
Source: Official FAA Source ↗
Retrieved: Apr 6, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.