AD 2002-02-03
Applicability
| Type | Manufacturer | Model | Details |
|---|---|---|---|
| aircraft | BAE Systems (Operations) Limited | BAe 146-100A | Airworthiness Directives; BAE Systems (Operations) Limited Model BAe 146 Series Airplanes |
| aircraft | BAE Systems (Operations) Limited | BAe 146-200A | Airworthiness Directives; BAE Systems (Operations) Limited Model BAe 146 Series Airplanes |
| aircraft | BAE Systems (Operations) Limited | BAe 146-300A | Airworthiness Directives; BAE Systems (Operations) Limited Model BAe 146 Series Airplanes |
Unsafe Condition
Cracking of the horizontal butt joint of the rear pressure bulkhead, which could result in reduced structural integrity of the airplane.
AI-generated summary from the source AD text. Verify against the official source before acting.
Required Actions
Conduct repetitive inspections to detect cracking of the horizontal butt joint of the rear pressure bulkhead and repair as necessary. Install new joint plates on the aft face of the rear pressure bulkhead to terminate the requirements of this AD.
AI-generated summary from the source AD text. Verify against the official source before acting.
Compliance Time
Before further flight
AI-generated summary from the source AD text. Verify against the official source before acting.
Affected Aircraft
BAE Systems (Operations) Limited Model BAe 146 series airplanes.
AI-generated summary from the source AD text. Verify against the official source before acting.
Federal Register Abstract
This amendment adopts a new airworthiness directive (AD), applicable to certain BAE Systems (Operations) Limited Model BAe 146 series airplanes, that requires repetitive inspections to detect cracking of the horizontal butt joint of the rear pressure bulkhead and repair, as necessary. This amendment also requires installation of new joint plates on the aft face of the rear pressure bulkhead, which terminates the requirements of this AD. This action is necessary to prevent cracking of the horizontal butt joint of the rear pressure bulkhead, which could result in reduced structural integrity of the airplane. This action is intended to address the identified unsafe condition.
Document Text
Show stored source text (verify against official source)
[Federal Register Volume 67, Number 26 (Thursday, February 7, 2002)]
[Rules and Regulations]
[Pages 5721-5723]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 02-2649]
========================================================================
Rules and Regulations
Federal Register
________________________________________________________________________
This section of the FEDERAL REGISTER contains regulatory documents
having general applicability and legal effect, most of which are keyed
to and codified in the Code of Federal Regulations, which is published
under 50 titles pursuant to 44 U.S.C. 1510.
The Code of Federal Regulations is sold by the Superintendent of Documents.
Prices of new books are listed in the first FEDERAL REGISTER issue of each
week.
========================================================================
Federal Register / Vol. 67, No. 26 / Thursday, February 7, 2002 /
Rules and Regulations
[[Page 5721]]
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. 2001-NM-05-AD; Amendment 39-12631; AD 2002-02-03]
RIN 2120-AA64
Airworthiness Directives; BAE Systems (Operations) Limited Model
BAe 146 Series Airplanes
AGENCY: Federal Aviation Administration, DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: This amendment adopts a new airworthiness directive (AD),
applicable to certain BAE Systems (Operations) Limited Model BAe 146
series airplanes, that requires repetitive inspections to detect
cracking of the horizontal butt joint of the rear pressure bulkhead and
repair, as necessary. This amendment also requires installation of new
joint plates on the aft face of the rear pressure bulkhead, which
terminates the requirements of this AD. This action is necessary to
prevent cracking of the horizontal butt joint of the rear pressure
bulkhead, which could result in reduced structural integrity of the
airplane. This action is intended to address the identified unsafe
condition.
DATES: Effective March 14, 2002.
The incorporation by reference of certain publications listed in
the regulations is approved by the Director of the Federal Register as
of March 14, 2002.
ADDRESSES: The service information referenced in this AD may be
obtained from British Aerospace Regional Aircraft American Support,
13850 Mclearen Road, Herndon, Virginia 20171. This information may be
examined at the Federal Aviation Administration (FAA), Transport
Airplane Directorate, Rules Docket, 1601 Lind Avenue, SW., Renton,
Washington; or at the Office of the Federal Register, 800 North Capitol
Street, NW., suite 700, Washington, DC.
FOR FURTHER INFORMATION CONTACT: Dan Rodina, Aerospace Engineer,
International Branch, ANM-116, FAA, Transport Airplane Directorate,
1601 Lind Avenue, SW., Renton, Washington 98055-4056; telephone (425)
227-2125; fax (425) 227-1149.
SUPPLEMENTARY INFORMATION: A proposal to amend part 39 of the Federal
Aviation Regulations (14 CFR part 39) to include an airworthiness
directive (AD) that is applicable to certain BAE Systems (Operations)
Limited Model BAe 146 series airplanes was published in the Federal
Register on September 14, 2001 (66 FR 47899). That action proposed to
require repetitive inspections to detect cracking of the horizontal
butt joint of the rear pressure bulkhead and repair, as necessary. That
action also proposed to require installation of new joint plates on the
aft face of the rear pressure bulkhead, which terminates the repetitive
inspections.
Comments
Interested persons have been afforded an opportunity to participate
in the making of this amendment. No comments were submitted in response
to the proposal or the FAA's determination of the cost to the public.
Clarification of Compliance Times
Since the issuance of the notice of proposed rulemaking (NPRM), the
FAA has found that paragraphs (a)(1) and (d)(1) of the NPRM need to be
clarified. Paragraph (a)(1) of the NPRM requires that the initial
inspection of the horizontal butt joint of the rear pressure bulkhead
be accomplished ``Prior to the accumulation of 12,000 flight cycles * *
*.'' Paragraph (d)(1) of the NPRM requires that the modification of the
rear pressure bulkhead be accomplished ``Prior to the accumulation of
40,000 flight cycles * * *.'' It was our intent that those actions be
accomplished prior to the applicable ``total'' flight cycles.
Therefore, we have revised paragraphs (a)(1) and (d)(1) of the final
rule to specify total flight cycles.
Clarification of Terminating Action
Since the issuance of the NPRM, the FAA has also determined that
the terminating action specified in paragraph (e) of the NPRM needs to
be clarified. That paragraph states, ``Accomplishment of paragraph (d)
of this AD terminates the need for repetitive inspections as specified
in paragraph (b) of this AD.'' However, the installation required by
paragraph (d) of this AD, as specified in BAE Systems (Operations)
Limited Modification Service Bulletin SB.53-42-00713A, Revision 2,
dated November 3, 2000 (which is referenced as an appropriate source of
service information in this AD), also terminates the requirements of
paragraphs (a) and (c) of this AD. Therefore, we have revised paragraph
(e) of the final rule to state, ``Accomplishment of the installation
required by paragraph (d) of this AD constitutes terminating action for
the requirements of this AD.'' We have also changed the Summary section
of this AD accordingly.
Changes Made to Paragraph (c) of This AD
Since the issuance of the NPRM, we have found that paragraph (c) of
the NPRM needs to be clarified. It was our intent that the repair may
also be done per a method approved by the CAA's delegated agent.
Therefore, we have included that language in paragraph (c) of this AD.
Conclusion
After careful review of the available data, the FAA has determined
that air safety and the public interest require the adoption of the
rule with the changes described previously. The FAA has determined that
these changes will neither increase the economic burden on any operator
nor increase the scope of the AD.
Cost Impact
The FAA estimates that 8 airplanes of U.S. registry will be
affected by this AD.
It will take approximately 1 work hour per airplane to accomplish
the required detailed visual inspection of the horizontal butt joints
on the forward and rear faces of the rear pressure bulkhead, at an
average labor rate of $60 per work hour. Based on these figures, the
cost impact of the required inspection on U.S. operators is estimated
to be $480, or $60 per airplane, per inspection cycle.
It will take approximately 9 work hours per airplane to accomplish
the
[[Page 5722]]
required installation of new butt joints on the rear pressure bulkhead,
at an average labor rate of $60 per work hour. The estimated cost of
the required parts is $495. Based on these figures, the cost impact of
the required installation on U.S. operators is estimated to be $8,280,
or $1,035 per airplane.
The cost impact figures discussed above are based on assumptions
that no operator has yet accomplished any of the requirements of this
AD action, and that no operator would accomplish those actions in the
future if this AD were not adopted. The cost impact figures discussed
in AD rulemaking actions represent only the time necessary to perform
the specific actions actually required by the AD. These figures
typically do not include incidental costs, such as the time required to
gain access and close up, planning time, or time necessitated by other
administrative actions.
Regulatory Impact
The regulations adopted herein will not have a substantial direct
effect on the States, on the relationship between the national
Government and the States, or on the distribution of power and
responsibilities among the various levels of government. Therefore, it
is determined that this final rule does not have federalism
implications under Executive Order 13132.
For the reasons discussed above, I certify that this action (1) is
not a ``significant regulatory action'' under Executive Order 12866;
(2) is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a
significant economic impact, positive or negative, on a substantial
number of small entities under the criteria of the Regulatory
Flexibility Act. A final evaluation has been prepared for this action
and it is contained in the Rules Docket. A copy of it may be obtained
from the Rules Docket at the location provided under the caption
ADDRESSES.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
Accordingly, pursuant to the authority delegated to me by the
Administrator, the Federal Aviation Administration amends part 39 of
the Federal Aviation Regulations (14 CFR part 39) as follows:
PART 39--AIRWORTHINESS DIRECTIVES
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
2. Section 39.13 is amended by adding the following new
airworthiness directive:
2002-02-03 BAE Systems (Operations) Limited (Formerly British
Aerospace Regional Aircraft): Amendment 39-12631. Docket 2001-NM-05-
AD.
Applicability: Model BAe 146 series airplanes on which
Modification HCM00713A has not been accomplished, certificated in
any category.
Note 1: This AD applies to each airplane identified in the
preceding applicability provision, regardless of whether it has been
otherwise modified, altered, or repaired in the area subject to the
requirements of this AD. For airplanes that have been modified,
altered, or repaired so that the performance of the requirements of
this AD is affected, the owner/operator must request approval for an
alternative method of compliance in accordance with paragraph (f) of
this AD. The request should include an assessment of the effect of
the modification, alteration, or repair on the unsafe condition
addressed by this AD; and, if the unsafe condition has not been
eliminated, the request should include specific proposed actions to
address it.
Compliance: Required as indicated, unless accomplished
previously.
To prevent cracking of the horizontal butt joint of the rear
pressure bulkhead, which could result in reduced structural
integrity of the airplane, accomplish the following:
Initial Inspection
(a) Conduct a detailed visual inspection for cracking of the
horizontal butt joint of the rear pressure bulkhead, in accordance
with BAE Systems (Operations) Limited Inspection Service Bulletin
ISB.53-42, Revision 1, dated November 3, 2000, at the later of the
times specified in paragraph (a)(1) or (a)(2) of this AD.
(1) Prior to the accumulation of 12,000 total flight cycles; or
(2) Within 4,000 total flight cycles or 2 years after the
effective date of this AD, whichever occurs first.
Note 2: For the purposes of this AD, a detailed visual
inspection is defined as: ``An intensive visual examination of a
specific structural area, system, installation, or assembly to
detect damage, failure, or irregularity. Available lighting is
normally supplemented with a direct source of good lighting at
intensity deemed appropriate by the inspector. Inspection aids such
as mirror, magnifying lenses, etc., may be used. Surface cleaning
and elaborate access procedures may be required.''
Repetitive Inspections
(b) Repeat the detailed visual inspection specified in paragraph
(a) of this AD at intervals not to exceed 12,000 flight cycles.
Repair
(c) If any crack is detected during a detailed visual inspection
required by either paragraph (a) or (b) of this AD, prior to further
flight, repair the crack in a manner approved by the Manager,
International Branch, ANM-116, Transport Airplane Directorate, FAA;
or the Civil Aviation Authority (CAA) (or its delegated agent).
Modification
(d) Install new joint plates on the rear pressure bulkhead, in
accordance with BAE Systems (Operations) Limited Modification
Service Bulletin SB.53-42-00713A, Revision 2, dated November 3,
2000, at the later of the times specified in paragraph (d)(1) or
(d)(2) of this AD.
(1) Prior to the accumulation of 40,000 total flight cycles, or
(2) Within 6,000 flight cycles or 2 years after the effective
date of this AD, whichever occurs first.
Terminating Action
(e) Accomplishment of the installation required by paragraph (d)
of this AD constitutes terminating action for the requirements of
this AD.
Alternative Methods of Compliance
(f) An alternative method of compliance or adjustment of the
compliance time that provides an acceptable level of safety may be
used if approved by the Manager, International Branch, ANM-116.
Operators shall submit their requests through an appropriate FAA
Principal Maintenance Inspector, who may add comments and then send
it to the Manager, International Branch, ANM-116.
Note 3: Information concerning the existence of approved
alternative methods of compliance with this AD, if any, may be
obtained from the International Branch, ANM-116.
Special Flight Permits
(g) Special flight permits may be issued in accordance with
sections 21.197 and 21.199 of the Federal Aviation Regulations (14
CFR 21.197 and 21.199) to operate the airplane to a location where
the requirements of this AD can be accomplished.
Incorporation by Reference
(h) Except as provided by paragraph (c) of this AD, the actions
shall be done in accordance with BAE Systems (Operations) Limited
Inspection Service Bulletin ISB.53-42, Revision 1, dated November 3,
2000; and BAE Systems (Operations) Limited Modification Service
Bulletin SB.53-42-00713A, Revision 2, dated November 3, 2000; as
applicable. (Only the first page of BAE Systems (Operations) Limited
Modification Service Bulletin SB.53-42-00713A, Revision 2, is dated;
no other page of the document contains this information.) This
incorporation by reference was approved by the Director of the
Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part
51. Copies may be obtained from British Aerospace Regional Aircraft
American Support, 13850 Mclearen Road, Herndon, Virginia 20171.
Copies may be inspected at
[[Page 5723]]
the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW.,
Renton, Washington; or at the Office of the Federal Register, 800
North Capitol Street, NW., suite 700, Washington, DC.
Note 4: The subject of this AD is addressed in British
airworthiness directive 002-11-2000.
Effective Date
(i) This amendment becomes effective on March 14, 2002.
Issued in Renton, Washington, on January 29, 2002.
Ali Bahrami,
Acting Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 02-2649 Filed 2-6-02; 8:45 am]
BILLING CODE 4910-13-U
Source: Official FAA Source ↗
Retrieved: Apr 6, 2026
Rights: U.S. Government Public Domain
This site is not affiliated with or endorsed by the FAA. Always verify with official sources.